Metrorail Bathroom Rehabilitation
| Agency: | Miami-Dade County |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| Posted Date: | Dec 19, 2024 |
| Due Date: | Jan 8, 2025 |
| Solicitation No: | MCC 7360 RPQ TP-0000027284 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Solicitation Details - MCC 7360 RPQ TP-0000027284
Title:
Metrorail Bathroom Rehabilitation
Opening Date:
1/8/2025 2:00:00 PM
Announcement Info:
Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). A. Work under this Contract includes the remodeling of certain restrooms facilities within the UHealth | Jackson, Palmetto and Tri-Rail Metrorail stations. Scope is identified in the construction documents and associated specifications for each of the facilities; however, it includes and is not limited to: 1) The removal and installation of all fixtures and finishes complying with codes and ADA standards. 2) Removal and replacement of all finishes and fixtures with new walls, floor, and ceiling coverings, fixtures, appurtenances, plumbing, electrical, mechanical, communications, P/A speaker and speaker grills, hand free telephones, building systems, equipment and components associated thereto for the complete repair of the Metrorail Bathroom projects. 3) Remove and replace with new cast-iron and copper all existing sanitary drains, waste and vent systems. 4) Remove and completely re-pipe with new L-type copper all existing water pipe, including trap primers, control valves, and supports for all plumbing fixtures. 5) Provide new plumbing fixtures “institutional type” ADA and Watersense compliant. Contractors are to verify that the specified products, in the construction documents, are Watersense compliant. Contractors are to provide cut sheets for approval of all plumbing fixtures. In the event that some plumbing fixtures, as specified, are not watersense compliant, contractor is to submit to DTPW substitutions of equal or greater performance with the appropriate watersense certifications. 6) Provide to all new plumbing fixtures acorn duran-ware 16-gauge, type 304 stainless steel rated for 1000 lbs. with all mounting screws concealed. 7) Restrooms shall be equipped with as required per DTPW toilet accessory specifications. 8) All bathroom’s walls shall be tile from floor to ceiling with ceramic tile: Daletile, Marrazzi & American Olean, Ice White 0025, Glossy with Epoxy integral color grout, color: 44 Bright white. 9) Bathroom floors shall be anti-slip ceramic tile. Daletile: Marrazzi & American Olean, Story Floor 0034, Matte Balance with epoxy integral grout: laticrete epoxy grouts, 78 sterling Silver. 10) Provide new mechanical soffit and rigid ceiling with fire alarm and lighting. 11) Install doors type 316 stainless steel with a min. of a 1.5-hour fire rating. 12) Provide light fixtures per specification in day brite LED with emergency battery back-up shall be 227V, 2 lamp recessed to match existing. 13) Furnish and install a new UL listed weather resistant wall mounted hand-free telephone to replace existing one. 14) Furnish and install a new exhaust ventilator with duct and wiring, in each restroom. 15) The smoke detectors inside the bathrooms must be removed at the beginning of the construction and reinstall before opening the bathroom to the public. 16) The P/A speaker, speaker enclosure and grill shall be replaced with a new atlas sound speakers to be compatible with existing P/A system. 17) Remove and replace lose / broken floor tiles in area adjacent to the area of work. 18) Remove and replace the existing Removal and replacement of existing O/A wall vent. 19) Remove and replace cracked lath and plaster ceiling and high hats above drinking fountain vestibule. 20) New concrete work as shown in the structural drawings.
Technical Certification:
General Engineering; General Building Contractor; Plumber, Master; Fire Alarm; Building Contractor; Structural; Electrical Contractor
Commodities
| Code | Description |
| 91438 | ELECTRICAL |
| 91468 | PLUMBING |
| 96820 | BUILDING CONSTRUCTION |
| 96842 | GENERAL CONSTRUCTION |
| 34016 | FIRE ALARM SYSTEMS, POWER SIRENS, AND CONTROLS |
Solicitation Package/Addendums
| Type | File Name |
| Package | MCC_7360_RPQ_TP-0000027284.pdf |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Follow Florida National Cemetery, National Shrine Turfgrass Renovation Project Active Contract Opportunity Notice
VETERANS AFFAIRS, DEPARTMENT OF
Follow Jacksonville Air Route Traffic Control Center (ARTCC) Chiller Repair Project Active Contract
TRANSPORTATION, DEPARTMENT OF
Due by 9/14/2026
Advertisement Detail Department of Transportation Agency Decisions Roof Replacement - Clearwater Construction Advertisement
State Government of Florida
Due by 10/11/2070
Advertisement Detail Department of Transportation Agency Decisions Palm Beach and Northern 3 Counties
State Government of Florida
Due by 10/11/2040
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.