Met-Top E Abrasive Resistant Topping Material Installation
|
|
|
|
Abstract: Construction Solicitation KC001229,4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Title
|
Met-Top E Abrasive Resistant Topping Material Installation
|
|
Solicitation Type
|
Construction Solicitation
|
|
Status
|
Active
|
|
Buyer
|
Brian Pinney
|
|
Email
|
brian.pinney@kingcounty.gov
|
|
Synopsis
|
The work under this Contract consists of furnishing all labor, tools, equipment, materials, incidentals, superintendents, subcontractor coordination and overhead to perform tipping floor resurfacing. The Contractor will furnish all labor, materials, and equipment necessary to install 2” depth of Met-Top E abrasion resistant material as per the Technical Data Sheet directions for use in designated areas. The Contractor will supply the abrasion resistant floor topping using pre-mixed, ready to use Met-Top E, a high strength emery aggregate based topping with Bond Coat outlined in 3.b.1 that includes Metco Low-Mod Epoxy and quartz aggregate over concrete base slabs at locations indicated on the reference drawings as well as barriers to delineate work areas. The Contractor will also furnish all labor, materials, and equipment necessary to clean, wash, and prepare the existing surface before applying resurfacing material. The Contractor will also furnish all labor, materials, and equipment necessary for the curing process and saw cutting of joints after applying the resurfacing material. The contractor shall request a Metalcrete Industries technical service representative to provide on-site assistance during floor topping installation.
|
|
Addendum Description
|
Addendum 4 has been issued. Suppliers must acknowledge all addenda before submitting a response. If a supplier has already submitted a response, they MUST log into the E-Procurement Supplier Portal, acknowledge the addendum, and resubmit.
|
|
Attachments
|
|
|
KC001229-addendum-4.pdf
(355.21 KB)
|
|
|
|
KC001229-Addendum-2.pdf
(143.52 KB)
|
|
|
|
KC001229-itb-documents.zip
(5.52 MB)
|
|
|
|
KC001229-Addendum-1.pdf
(194.66 KB)
|
|
|
|
KC001229-addendum-3.pdf
(147.41 KB)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Open Date
|
10/11/24 02:39:48 PM
|
|
Close Date
|
10/31/24 01:30:59 PM
|
|
Posting Date
|
10/11/24
|
|
|
|
|
|
|
|
Pre-Bid/Proposal Conference Date
|
9/5/24 11:00:00 AM
|
|
Second Pre-Bid/Proposal Conference Date
|
|
|
Pre-Bid/Proposal Location
|
See ITB Volume 1, Section 00 10 00 for pre-bid and site tour details.
|
|
Last Date for Questions
|
10/24/24 05:00:00 PM
|
|
KC Solicitation NAICS Code(s)
|
237310;238110;238120;238140;238190;238390;238910;238990
|
|
|
|
|
|
Bid Opening Location
|
Via MS Teams - See ITB Volume 1 Section 00 10 00 for details
|
|
Small Business Requirements Apply?
|
Yes
|
|
Department
|
NATURAL RESOURCES AND PARKS
|
|
Division
|
SOLID WASTE
|
|
|
|
|
|
|
|
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now
See Also
Follow RIGHT_LEFT PLUG SEAL Active Contract Opportunity Notice ID SPMYM226Q7175 Related Notice Department/Ind.
DEPT OF DEFENSE
Bid Due: 6/30/2026
Window & Sliding Door Replacement Rebid at Woodside East Deadline: 07/08/2026
King County Housing Authority
Bid Due: 7/08/2026
Window & Sliding Door Replacement Rebid at Pinewood Village Deadline: 07/01/2026
King County Housing Authority
Bid Due: 7/01/2026
Window & Sliding Door Replacement at Pinewood Village Deadline: 07/01/2026
King County Housing Authority
Bid Due: 7/01/2026