MECHANICAL SYSTEMS, PREVENTITIVE MAINTENANCE AND ON CALL SERVICES

Agency: City of Annapolis
State: Maryland
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: May 4, 2026
Due Date: May 29, 2026
Solicitation No: IFB#26-24
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number: IFB#26-24
Bid Title: MECHANICAL SYSTEMS, PREVENTITIVE MAINTENANCE AND ON CALL SERVICES
Category: Purchasing
Status: Open
Additional Status Information: N/A
Bid Recipient: N/A
Description:

INSTRUCTIONS TO BIDDERS

I.F.B. 26-24

MECHANICAL SYSTEMS, PREVENTITIVE MAINTENANCE AND ON CALL SERVICES, CITY OF ANNAPOLIS, MARYLAND

The Central Purchasing Office of the City of Annapolis is accepting sealed Bids for Mechanical Services, Preventive Maintenance and on Call Services until 2:00 p.m., local time, Friday, May 29, 2026.  Bids shall be delivered or emailed to the Central Purchasing Office, 25 Shaw Street, 1 st Floor, Annapolis, Maryland 21401, For security reasons, you must enable JavaScript to view this E-mail address..  Late submittals shall not be accepted under any circumstances.

The scope of work includes, but is not limited to HVAC and plumbing building systems preventative maintenance and emergency on-call services for equipment presently owned/operated or later acquired facilities by the City of Annapolis, Maryland.

The City of Annapolis reserves the right to reject any or all Bids, to waive informalities as deemed appropriate by the City, to award multiple contracts, and to select the Bid deemed to be in the best interest of the City.

Shyneice Hardy

Buyer

The bid opening virtual meeting instructions are denoted below.

Google Meet

Invitation: Virtual Bid Opening - IFB #26-24, Mechanical Systems, Preventative Maintenance And On Call Services

Friday, May 29 · 2:45 – 3:00pm

Time zone: America / New York

Google Meet joining info

Video call link: https://meet.google.com/ofx-zrrn-run

Or dial: ? (US) +1 612-440-0547 PIN: ? 323 168 019#

Publication Date/Time:
5/4/2026 4:00 PM
Publication Information:
www.annapolis.gov/bids.aspx
Closing Date/Time:
5/29/2026 2:00 PM
Submittal Information:
N/A
Bid Opening Information:
Google Meet, See Attachment
Addendum Date/Time:
N/A
Pre-bid Meeting:
No Pre-bid Meeting Scheduled
Contact Person:
Shyneice Hardy
Slhardy@annapolis.Gov
Buyer
Download Available:
Bottom of solicitation page
Fee:
N/A
Plan & Spec Available:
Links at bottom of solicitation page.
Business Hours:
9:00 a.m. to 4:30 p.m.
Fax Number:
410-263-8120
Plan Holders List:
No plan holders list.
Qualifications:
See the attachment.
Special Requirements:
See the attachment.
Miscellaneous:
See the attachment.
Related Documents:

Attachment Preview

Item No. Mileage Rates Units Unit Cost
1 Mileage Rate for Service Truck Per Service Trip - Service Truck Per Mile
2 Mileage Rate for Service Truck Per Service Trip - Other Per Mile
Item No. Loaded Labor Rates - Normal Busines Hours Units Unit Cost
3 Loaded Labor Rate - (Supervisor) Per Hour
4 Loaded Labor Rate - (Lead Service Technician) Per Hour
5 Loaded Labor Rate - (Technician) Per Hour
6 Loaded Labor Rate - (General Laborer) Per Hour
Item No. Loaded Labor Rates - After Busines Hours - On Call Units Unit Cost
7 Loaded Labor Rate - (Supervisor) Per Hour
8 Loaded Labor Rate - (Lead Service Technician) Per Hour
9 Loaded Labor Rate - (Technician) Per Hour
10 Loaded Labor Rate - (General Laborer) Per Hour
Item No. Preventive Maintenace Schedule
Blower Check Units Unit Cost
11 Check wheel and motor for cleanliness Spring
12 Check motor bearings for wear Spring
13 Lubricate bearing (if needed) Spring
14 Check blower and screw and monitor mounts Spring
15 Check pulleys and belts (if applicable) Spring
Condenser Coils Units Unit Cost
16 Inspect for damage Spring / Summer / Fall / Winter
17 Inspect finned surfaces Spring / Summer / Fall / Winter
18 Clean evaporator and condensors Spring / Summer / Fall / Winter
19 Remove any debris from around area Spring / Summer / Fall / Winter
20
Condensate Pans Units Unit Cost
20 Inspect condensate collection pans drain lines Spring / Summer / Fall / Winter
21 Inspect condensate drain pans for mold and other debris Spring / Summer / Fall / Winter
22 Clean and clear condensate drain pans of standing water Spring / Summer / Fall / Winter
23 Clean and clear condensate drain pan lines to ensure flow Spring / Summer / Fall / Winter

Bid Form Worksheet
IFB #26-24, Mechanical Systems, Preventativce Maintenance and On
Invitation for Bid
Call Services, City of Annapolis, Maryland
Legal Name of Bidder:
Business or Entity Name (e.g., Corp., Inc., Co., T/A, DBA, etc.)
Item No. Mileage Rates Units Unit Cost
1 Mileage Rate for Service Truck Per Service Trip - Service Truck Per Mile
2 Mileage Rate for Service Truck Per Service Trip - Other Per Mile
Item No. Loaded Labor Rates - Normal Busines Hours Units Unit Cost
3 Loaded Labor Rate - (Supervisor) Per Hour
4 Loaded Labor Rate - (Lead Service Technician) Per Hour
5 Loaded Labor Rate - (Technician) Per Hour
6 Loaded Labor Rate - (General Laborer) Per Hour
Item No. Loaded Labor Rates - After Busines Hours - On Call Units Unit Cost
7 Loaded Labor Rate - (Supervisor) Per Hour
8 Loaded Labor Rate - (Lead Service Technician) Per Hour
9 Loaded Labor Rate - (Technician) Per Hour
10 Loaded Labor Rate - (General Laborer) Per Hour
Item No. Preventive Maintenace Schedule
Blower Check Units Unit Cost
11 Check wheel and motor for cleanliness Spring
12 Check motor bearings for wear Spring
13 Lubricate bearing (if needed) Spring
14 Check blower and screw and monitor mounts Spring
15 Check pulleys and belts (if applicable) Spring
Condenser Coils Units Unit Cost
Spring / Summer / Fall /
16 Inspect for damage
Winter
Spring / Summer / Fall /
17 Inspect finned surfaces
Winter
Spring / Summer / Fall /
18 Clean evaporator and condensors
Winter
Spring / Summer / Fall /
19 Remove any debris from around area
Winter
20
Condensate Pans Units Unit Cost
Spring / Summer / Fall /
20 Inspect condensate collection pans drain lines
Winter
Spring / Summer / Fall /
21 Inspect condensate drain pans for mold and other debris
Winter
Spring / Summer / Fall /
22 Clean and clear condensate drain pans of standing water
Winter
Spring / Summer / Fall /
23 Clean and clear condensate drain pan lines to ensure flow
Winter
- Page 1 of 3 -

Item No. Preventive Maintenace Schedule
Condenser Fans Units Unit Cost
24 Lubricate motor and / or bearings Spring / Summer
25 Check for bearing ware Spring / Summer
26 Check for security to shaft Spring / Summer
27 Inspect fan blades Spring / Summer
28 Check for corrosion Spring / Summer
Condenser Fans Units Unit Cost
29 Check rain sheilds Spring / Summer
30 Verify proper operation of all fans Spring / Summer
Control Panel Units Unit Cost
31 Inspect and tighten all electrical connections Spring / Summer / Fall / Winter
32 Inspect and clean contactors as necessary 3 Spring / Summer / Fall / Winter
Diffusers, Duct, Dampers & Grilles
33 Inspect diffusers and ducts for particulate deposits Spring / Summer / Fall / Winter
34 Inspect ducts for dust, mold or debris Spring / Summer / Fall / Winter
35 Inspect dampers for proper operations Spring / Summer / Fall / Winter
36 Inspect grilles and ducts for particulate deposits Spring / Summer / Fall / Winter
Electronic Air Filters Units Unit Cost
37 Lubricate motor and / or bearings Spring / Summer
38 Check for bearing ware Spring / Summer
39 Check for security to shaft Spring / Summer
40 Inspect fan blades Spring / Summer
41 Check for corrosion Spring / Summer
42 Check rain sheilds Spring / Summer
43 Verify proper operation of all fans Spring / Summer
Filters Units Unit Cost
44 Change Filters Spring / Summer / Fall / Winter
Furnace System Units Unit Cost
45 Check the ignition burner assembly Fall / Winter
46 Carefully inspect heting elements / heat exchanger Fall / Winter
47 Inspect the flue to esure proper attachement to furnace Fall / Winter
48 Check for gas leaks Fall / Winter
49 Check for gas pressure Fall / Winter

Item No. Preventive Maintenace Schedule
Condenser Fans Units Unit Cost
24 Lubricate motor and / or bearings Spring / Summer
25 Check for bearing ware Spring / Summer
26 Check for security to shaft Spring / Summer
27 Inspect fan blades Spring / Summer
28 Check for corrosion Spring / Summer
Condenser Fans Units Unit Cost
29 Check rain sheilds Spring / Summer
30 Verify proper operation of all fans Spring / Summer
Control Panel Units Unit Cost
Spring / Summer / Fall /
31 Inspect and tighten all electrical connections
Winter
Spring / Summer / Fall /
32 Inspect and clean contactors as necessary
3 Winter
Diffusers, Duct, Dampers & Grilles
Spring / Summer / Fall /
33 Inspect diffusers and ducts for particulate deposits
Winter
Spring / Summer / Fall /
34 Inspect ducts for dust, mold or debris
Winter
Spring / Summer / Fall /
35 Inspect dampers for proper operations
Winter
Spring / Summer / Fall /
36 Inspect grilles and ducts for particulate deposits
Winter
Electronic Air Filters Units Unit Cost
37 Lubricate motor and / or bearings Spring / Summer
38 Check for bearing ware Spring / Summer
39 Check for security to shaft Spring / Summer
40 Inspect fan blades Spring / Summer
41 Check for corrosion Spring / Summer
42 Check rain sheilds Spring / Summer
43 Verify proper operation of all fans Spring / Summer
Filters Units Unit Cost
Spring / Summer / Fall /
44 Change Filters
Winter
Furnace System Units Unit Cost
45 Check the ignition burner assembly Fall / Winter
46 Carefully inspect heting elements / heat exchanger Fall / Winter
47 Inspect the flue to esure proper attachement to furnace Fall / Winter
48 Check for gas leaks Fall / Winter
49 Check for gas pressure Fall / Winter
- Page 2 of 3 -

Item No. Preventive Maintenace Schedule
Furnace System Units Unit Cost
50 Inspect burner condition Fall / Winter
51 Inspect blower Fall / Winter
52 Inspect draft fan Fall / Winter
53 Verify operation of draft fan Fall / Winter
54 Test operating controls Fall / Winter
55 Inspect combustion chamber and clean as required Fall / Winter
56 Check integrity of heat exchanger Fall / Winter
Item No. Preventive Maintenace Schedule
HVAC Cabinet Units Unit Cost
57 Check the HVAC cabinet for leaks Spring / Summer / Fall / Winter
58 Ensure HVAC cabinet door securely closes Spring / Summer / Fall / Winter
Interior Thermostats Units Unit Cost
59 Check thermostats and their controls to ensure correct setting Spring / Summer / Fall / Winter
60 Pull thermostat cover and check wiring connections Spring / Summer / Fall / Winter
61 Re-install thermostat cover and check operations Spring / Summer / Fall / Winter
Main Air Fan - Motor Assembly Units Unit Cost
62 Inspect blades Spring / Summer / Fall / Winter
63 Inspect bearings for excessive wear Spring / Summer / Fall / Winter
64 Check bearins for excessive temperature and abuse Spring / Summer / Fall / Winter
65 Lubricate bearings Spring / Summer / Fall / Winter
66 Inspect drive couplings, pulleys and belts Spring / Summer / Fall / Winter
67 Adjust drive couplings, pulleys and belts Spring / Summer / Fall / Winter
68 Replace belt as needed Spring / Summer / Fall / Winter
Item No. Percentage of Markup on Assemblies, Components and Parts
69 Percentage of Markup - (Percentage of Markup)
70 Overhead and Profit - (Percentage of Markup)

Item No. Preventive Maintenace Schedule
Furnace System Units Unit Cost
50 Inspect burner condition Fall / Winter
51 Inspect blower Fall / Winter
52 Inspect draft fan Fall / Winter
53 Verify operation of draft fan Fall / Winter
54 Test operating controls Fall / Winter
55 Inspect combustion chamber and clean as required Fall / Winter
56 Check integrity of heat exchanger Fall / Winter
Item No. Preventive Maintenace Schedule
HVAC Cabinet Units Unit Cost
Spring / Summer / Fall /
57 Check the HVAC cabinet for leaks
Winter
Spring / Summer / Fall /
58 Ensure HVAC cabinet door securely closes
Winter
Interior Thermostats Units Unit Cost
Spring / Summer / Fall /
59 Check thermostats and their controls to ensure correct setting
Winter
Spring / Summer / Fall /
60 Pull thermostat cover and check wiring connections
Winter
Spring / Summer / Fall /
61 Re-install thermostat cover and check operations
Winter
Main Air Fan - Motor Assembly Units Unit Cost
Spring / Summer / Fall /
62 Inspect blades
Winter
Spring / Summer / Fall /
63 Inspect bearings for excessive wear
Winter
Spring / Summer / Fall /
64 Check bearins for excessive temperature and abuse
Winter
Spring / Summer / Fall /
65 Lubricate bearings
Winter
Spring / Summer / Fall /
66 Inspect drive couplings, pulleys and belts
Winter
Spring / Summer / Fall /
67 Adjust drive couplings, pulleys and belts
Winter
Spring / Summer / Fall /
68 Replace belt as needed
Winter
Item No. Percentage of Markup on Assemblies, Components and Parts
69 Percentage of Markup - (Percentage of Markup)
70 Overhead and Profit - (Percentage of Markup)
Printed Name and Title of Legally Authorized Representative of Bidder:
Print Name of Of Legally Authorized Representative Preparing Bid
Signature of Legally Authorized Representative of Bidder:
Print Name of Of Legally Authorized Representative Preparing Bid
- Page 3 of 3 -

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow NAWCAD WOLF - BPA Solicitation for Manufacturing Commodity Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 8/26/2026

Follow NAWCAD WOLF - BPA Solicitation for Welding Commodity Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 8/26/2026

Follow Crane Repair Services Active Contract Opportunity Notice ID W91ZLK-26-Q-A010 Related Notice Department/Ind.

DEPT OF DEFENSE

Bid Due: 7/30/2026

Follow NAWCAD WOLF-Intent to Sole Source Range Keysight Annual Maintenance Active Contract Opportunity

DEPT OF DEFENSE

Bid Due: 7/29/2026