Mckinley, Hazelton & Elmwood Playgrounds Project - IFB 26-06
| Agency: | Stockton Unified School District |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| Posted Date: | Sep 24, 2026 |
| Due Date: | Oct 20, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
LLB RFQP - Mckinley, Hazelton & Elmwood Playgrounds
LLB Contract - Mckinley, Hazelton & Elmwood Playgrounds
Drawings - LCAP Hazelton Playground
Drawings - Mckinley Burned Playground
Drawings - LCAP Mckinley Playground
Project Manual - Elmwood Playground
Project Manual - LCAP MCkinley Playground
Project Manual - Mckinley Burned Playground
Project Manual - LCAP Hazelton Playground
Attachment Preview
PROJECT MANUAL
PROJECT/CONTRACT NUMBER:
DSA PTN: 68676-387
DSA File #: 39-69
DSA Application #: 02-123616
DSA Test Mark - EPR Admin
Change to "INCORPORATE"
BURNED PLAYGROUND REPLACEMENT
PROJECT
AT
MCKINLEY ELEMENTARY SCHOOL
30 WEST NINTH STREET
STOCKTON, CA 95206
STOCKTON UNIFIED SCHOOL DISTRICT
October 15, 2025
STOCKTON UNIFIED SCHOOL DISTRICT TITLE PAGE
DOCUMENT 00 01 01-1
| 4 |
|---|
PPLLAAYYGGRROOUUNNDD RREEPPLLAACCEEMMEENNTT PPRROOJJEECCTT -- MMCCKKIINNLLEEYY EESS 22002255--0077
SSTTOOCCKKTTOONN UUNNIIFFIIEEDD SSCCHHOOOOLL DDIISSTTRRIICCTT 0190//2255
PPRROOJJEECCTT/C/COONNTTRRAACCTT N NUUMMBBEERR: :2 625.0.x1x0
LCAP PRE-K PLAYGROUND PROJECT
AT
Mckinley Elementary School
L I C E T N I M O S T E H C Y D - L 2 5 . A 9 D 2 R EA 8 C R H B O R I N T E C T DSA A A p R pl C ic H ati I o T n E #: C 0 H 2-1 N 23 IC 61 A 6
S A
T I 555 WEST BENJAMIN HOLT DRIVE, SUITE 423
A N
T E R 1 E 2 N / E 22 W 0022 A 35 L O R STOCKTON, CALIFORNIA 95207
OF CALI
F
(209) 952-5850 / Fax: (209) 952-2442
E-Mail: tim@architechnica.net
MVE INC.
1117 L. STREET
MODESTO, CALIFORNIA 95354
(866) 536-4214 / Fax: (866) 932-9683
E-Mail: dmartis@mve.net
CONSULTANT
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
DDDDSSSSAAAA
APP:02-123616 INC:
REVIEWED FOR
SS 4 DDDDFIIIIVVVVLIIIISSSSSIIIIOOOONNNN OOOO4FFFF TTTTHHHHEEEE SSSSTTTTAAAAATTTTEEEEC AAAARRRRSCCCCHHHHIIII4TTTTEEEECCCCTTTT
DEPARTMENT OF GENERAL SERVICES
DATE: 11/05/2025
SIGNATURE PAGE
PLAYGROUND REPLACEMENT PROJECT - MCKINLEY ES 2025-07
STOCKTON UNIFIED SCHOOL DISTRICT 09/26
DOCUMENT 00 01 10
TABLE OF CONTENTS
Procurement and Contracting Requirements
Division 0 Section Title
00 01 01 Project Title Page
Signature Page
00 01 10 Table of Contents
Available Information
Division 0 Section Title
00 31 19 Existing Conditions
General Requirements
Division 1 Section Title
01 11 00 Summary of Work
Price and Payment Procedures
Division 1 Section Title
01 21 00 Allowance
01 25 13 Product Options and Substitutions
01 29 00 Application for Payment and Conditional and
Unconditional Waiver and Release Forms
Administrative Requirements
Division 1 Section Title
01 31 19 Project Meetings
01 32 13 Scheduling of Work
01 33 00 Submittals
01 35 13.23 Site Standards
Quality Requirements
Division 1 Section Title
01 41 00 Regulatory Requirements
01 42 00 Definition Standards
01 42 13 Abbreviations and Acronyms
01 42 19 References
01 43 00 Materials and Equipment
01 45 00 Quality Control
103-22 Listing of Structural Tests & Special Inspections
Temporary Facilities and Controls
Division 1 Section Title
01 50 00 Temporary Facilities and Controls
01 50 13 Construction Waste Management and Disposal
Product Requirements
Division 1 Section Title
STOCKTON UNIFIED SCHOOL DISTRICT TABLE OF CONTENTS
DOCUMENT 00 01 10-1
PLAYGROUND REPLACEMENT PROJECT - MCKINLEY ES 2025-07
STOCKTON UNIFIED SCHOOL DISTRICT 09/26
01 64 00 Owner-Furnished Products
01 66 00 Product Delivery, Storage and Handling
Execution and Closeout Requirements
Division 1 Section Title
01 71 23 Field Engineering
01 73 29 Cutting and Patching
01 76 00 Alteration Project Procedures
01 77 00 Contract Closeout and Final Cleaning
01 78 23 Operation and Maintenance Data
01 78 36 Warranties
01 78 39 Record Documents
01 79 00 Demonstration and Training
Existing Conditions
Division 2 Section Title
02 41 16 Structure Demolition
Concrete
Division 3 Section Title
03 30 00 Cast-in-Place Concrete
Finishes
Division 9 Section Title
09 29 00 Gypsum Board
09 30 00 Ceramic Tile
Specialties
Division 10 Section Title
10 14 00 Signage and Graphics
10 21 13 Toilet Compartments
10 28 00 Toilet, Bath, and Laundry Accessories
Equipment
Division 11 Section Title
11 68 00 Play Field Equipment and Structures
Earthwork
Division 31 Section Title
31 10 00 Site Clearing
31 20 00 Earth Moving
Exterior Improvements
Division 32 Section Title
32 12 16 Asphalt Paving
STOCKTON UNIFIED SCHOOL DISTRICT TABLE OF CONTENTS
DOCUMENT 00 01 10-2
PLAYGROUND REPLACEMENT PROJECT - MCKINLEY ES 2025-07
STOCKTON UNIFIED SCHOOL DISTRICT 09/26
32 13 13 Concrete Paving
32 13 73 Concrete Paving and Joint Sealants
32 17 23 Pavement Markings
32 17 26 Tactile Warning Surface
32 18 16.13 Playground Surfacing Tiles
32 31 13 Chain Link Fencing and Gates
32 92 23 Sodding
Utilities
Division 33 Section Title
33 41 00 Storm Utility Drainage Piping
STOCKTON UNIFIED SCHOOL DISTRICT TABLE OF CONTENTS
DOCUMENT 00 01 10-3
PLAYGROUND REPLACEMENT PROJECT - MCKINLEY ES 2025-07
STOCKTON UNIFIED SCHOOL DISTRICT 09/25
DOCUMENT 00 31 19 - EXISTING CONDITIONS
1. Summary
This document describes existing conditions at or near the Project, and use of information
available regarding existing conditions. This document is not part of the Contract Documents.
See General Conditions for definition(s) of terms used herein.
2. Reports and Information on Existing Conditions
a. Documents providing a general description of the Site and conditions of the Work may
have been collected by Stockton Unified School District ("District"), its consultants,
contractors, and tenants. These documents may, but are not required to, include
previous contracts, contract specifications, tenant improvement contracts, as-built
drawings, utility drawings, and information regarding underground facilities.
b. Information regarding existing conditions may be inspected at the District offices or the
Construction Manager's offices, if any, and copies may be obtained at cost of
reproduction and handling upon Bidder's agreement to pay for such copies. These
reports, documents, and other information are not part of the Contract Documents.
These reports, documents, and other information do not excuse Contractor from fulfilling
Contractor's obligation to independently investigate any or all existing conditions or from
using reasonable prudent measures to avoid damaging existing improvements.
c. Information regarding existing conditions may also be included in the Project Manual, but
shall not be considered part of the Contract Documents.
d. Prior to commencing this Work, Contractor and the District's representative shall survey
the Site to document the condition of the Site. Contractor will record the survey in digital
videotape format and provide an electronic copy to the District within fourteen (14) days
of the survey.
e. Contractor may also document any pre-existing conditions in writing, provided that both
the Contractor and the District's representative agree on said conditions and sign a
memorandum documenting the same.
f. The reports and other data or information regarding existing conditions and underground
facilities at or contiguous to the Project are the following:
(1) Original Construction Drawings.
(2) Survey of Site.
(3) Geotechnical Report(s).
(4) Hazardous Material Report(s).
3. Use of Information
a. Information regarding existing conditions was obtained only for use of District and its
consultants, contractors, and tenants for planning and design and is not part of the
Contract Documents.
b. District does not warrant, and makes no representation regarding, the accuracy or
thoroughness of any information regarding existing conditions. Bidder represents and
agrees that in submitting a bid it is not relying on any information regarding existing
conditions supplied by District.
STOCKTON UNIFIED SCHOOL DISTRICT EXISTING CONDITIONS
DOCUMENT 00 31 19-1
PLAYGROUND REPLACEMENT PROJECT - MCKINLEY ES 2025-07
STOCKTON UNIFIED SCHOOL DISTRICT 09/25
c. Under no circumstances shall District be deemed to warrant or represent existing above-
ground conditions, as-built conditions, or other actual conditions, verifiable by
independent investigation. These conditions are verifiable by Contractor by the
performance of its own independent investigation that Contractor must perform as a
condition to bidding and Contractor should not and shall not rely on this information or
any other information supplied by District regarding existing conditions.
d. Any information shown or indicated in the reports and other data supplied herein with
respect to existing underground facilities at or contiguous to the Project may be based
upon information and data furnished to District by the District's employees and/or
consultants or builders of such underground facilities or others. District does not assume
responsibility for the completeness of this information, and Bidder is solely responsible for
any interpretation or conclusion drawn from this information.
e. District shall be responsible only for the general accuracy of information regarding
underground facilities, and only for those underground facilities that are owned by
District, and only where Bidder has conducted the independent investigation required of it
pursuant to the Instructions to Bidders, and discrepancies are not apparent.
4. Investigations/Site Examinations
a. Before submitting a Bid, each Bidder is responsible for conducting or obtaining any
additional or supplementary examinations, investigations, explorations, tests, studies,
and data concerning conditions (surface, subsurface, and underground facilities) at or
contiguous to the Site or otherwise, that may affect cost, progress, performance, or
furnishing of Work or that relate to any aspect of the means, methods, techniques,
sequences, or procedures of construction to be employed by Bidder and safety
precautions and programs incident thereto or that Bidder deems necessary to determine
its Bid for performing and furnishing the Work in accordance with the time, price, and
other terms and conditions of Contract Documents.
b. On request, District will provide each Bidder access to the Site to conduct such
examinations, investigations, explorations, tests, and studies, as each Bidder deems
necessary for submission of a Bid. Bidders must fill all holes and clean up and restore
the Site to its former condition upon completion of its explorations, investigations, tests,
and studies. Such investigations and Site examinations may be performed during any
and all Site visits indicated in the Notice to Bidders and only under the provisions of the
Contract Documents, including, but not limited to, proof of insurance and obligation to
indemnify against claims arising from such work, and District's prior approval.
END OF DOCUMENT
STOCKTON UNIFIED SCHOOL DISTRICT EXISTING CONDITIONS
DOCUMENT 00 31 19-2
PLAYGROUND REPLACEMENT PROJECT - MCKINLEY ES 2025-07
STOCKTON UNIFIED SCHOOL DISTRICT 09/25
DOCUMENT 01 11 00
SUMMARY OF WORK
PART 1 - GENERAL
1.01 RELATED DOCUMENTS AND PROVISIONS
All Contract Documents should be reviewed for applicable provisions related to the
provisions in this document, including without limitation:
A. General Conditions, including, without limitation, Site Access Conditions and
Requirements;
B. Special Conditions.
1.02 SUMMARY OF WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of this Contract consists of the following:
REPLACEMENT OF EXISTING PLAY STRUCTURE BURNED IN A FIRE WITH A NEW
PLAY STRUCTURE FOR AGES 5-12 TO BE INSTALLED OVER RECESSED RUBBER
TILE FALL PROTECTION. ONE 30' x 40' SHADE STRUCTURE W/ PC TO BE
INSTALLED OVER NEW PLAY STRUCTURE. MINOR PATH OF TRAVEL UPGRADES
TO THE PLAYGROUND AREA
1.03 CONTRACTS
A. Perform the Work under a single, fixed-price Contract.
1.04 CODES, REGULATIONS, AND STANDARDS
A. The codes, regulations, and standards adopted by the state and federal
agencies having jurisdiction shall govern minimum requirements for this
Project. Where codes, regulations, and standards conflict with the Contract
Documents, these conflicts shall be brought to the immediate attention of the
District and the Architect.
B. Codes, regulations, and standards shall be as published effective as of date of
bid opening, unless otherwise specified or indicated.
1.05 PROJECT RECORD DOCUMENTS
A. Contractor shall maintain on Site one set of the following record documents;
Contractor shall record actual revisions to the Work:
(1) Contract Drawings.
(2) Specifications.
(3) Addenda.
(4) Change Orders and other modifications to the Contract.
STOCKTON UNIFIED SCHOOL DISTRICT SUMMARY OF WORK
DOCUMENT 01 11 00-1
PLAYGROUND REPLACEMENT PROJECT - MCKINLEY ES 2025-07
STOCKTON UNIFIED SCHOOL DISTRICT 09/25
(5) Reviewed shop drawings, product data, and samples.
(6) Field test records.
(7) Inspection certificates.
(8) Manufacturer's certificates.
B. Contractor shall store Record Documents separate from documents used for
construction. Provide files, racks, and secure storage for Record Documents
and samples.
C. Contractor shall record information concurrent with construction progress.
D. Specifications: Contractor shall legibly mark and record at each product
section of the Specifications the description of the actual product(s) installed,
including the following:
(1) Manufacturer's name and product model and number.
(2) Product substitutions or alternates utilized.
(3) Changes made by Addenda and Change Orders and written directives.
1.06 EXAMINATION OF EXISTING CONDITIONS
A. Contractor shall be held to have examined the Project Site and acquainted
itself with the conditions of the Site and of the streets or roads approaching
the Site.
B. Prior to commencement of Work, Contractor shall survey the Site and existing
buildings and improvements to observe existing damage and defects such as
cracks, sags, broken, missing or damaged glazing, other building elements
and Site improvements, and other damage.
C. Should Contractor observe cracks, sags, and other damage to and defects of
the Site and adjacent buildings, paving, and other items not indicated in the
Contract Documents, Contractor shall immediately report same to the District
and the Architect.
1.07 CONTRACTOR'S USE OF PREMISES
A. If unoccupied and only with District's prior written approval, Contractor may
use the building(s) at the Project Site without limitation for its operations,
storage, and office facilities for the performance of the Work. If the District
chooses to beneficially occupy any building(s), Contractor must obtain the
District's written approval for Contractor's use of spaces and types of
operations to be performed within the building(s) while so occupied.
Contractor's access to the building(s) shall be limited to the areas indicated.
B. If the space at the Project Site is not sufficient for Contractor's operations,
storage, office facilities and/or parking, Contractor shall arrange and pay for
any additional facilities needed by Contractor.
STOCKTON UNIFIED SCHOOL DISTRICT SUMMARY OF WORK
DOCUMENT 01 11 00-2
PLAYGROUND REPLACEMENT PROJECT - MCKINLEY ES 2025-07
STOCKTON UNIFIED SCHOOL DISTRICT 09/25
C. Contractor shall not interfere with use of or access to occupied portions of the
building(s) or adjacent property.
D. Contractor shall maintain corridors, stairs, halls, and other exit-ways of
building clear and free of debris and obstructions at all times.
E. No one other than those directly involved in the demolition and construction,
or specifically designated by the District or the Architect shall be permitted in
the areas of work during demolition and construction activities.
F. The Contractor shall install the construction fence and maintain that it will be
locked when not in use. Keys to this fencing will be provided to the District.
1.08 PROTECTION OF EXISTING STRUCTURES AND UTILITIES
A. The Drawings show above-grade and below-grade structures, utility lines, and
other installations that are known or believed to exist in the area of the Work.
Contractor shall locate these existing installations before proceeding with
excavation and other operations that could damage same; maintain them in
service, where appropriate; and repair damage to them caused by the
performance of the Work. Should damage occur to these existing
installations, the costs of repair shall be at the Contractor's expense and
made to the District's satisfaction.
B. Contractor shall be alert to the possibility of the existence of additional
structures and utilities. If Contractor encounters additional structures and
utilities, Contractor will immediately report to the District for disposition of
same as indicated in the General Conditions.
1.09 UTILITY SHUTDOWNS AND INTERRUPTIONS
A. Contractor shall give the District a minimum of three (3) days written notice
in advance of any need to shut off existing utility services or to effect
equipment interruptions. The District will set exact time and duration for
shutdown, and will assist Contractor with shutdown. Work required to re-
establish utility services shall be performed by the Contractor.
B. Contractor shall obtain District's written approval as indicated in the General
Conditions in advance of deliveries of material or equipment or other activities
that may conflict with District's use of the building(s) or adjacent facilities.
1.10 STRUCTURAL INTEGRITY
A. Contractor shall be responsible for and supervise each operation and work
that could affect structural integrity of various building elements, both
permanent and temporary.
B. Contractor shall include structural connections and fastenings as indicated or
required for complete performance of the Work.
STOCKTON UNIFIED SCHOOL DISTRICT SUMMARY OF WORK
DOCUMENT 01 11 00-3
See Also
Project ID: Title: J-141 (RFI), Public Address System Replacement Addenda: 0 Release Date:
Orange County Sanitation District
Due by 9/30/2026
Follow Egyptian Navy Autonomous INTelligence System (AINTS) Platform Integration Active Contract Opportunity Notice
DEPT OF DEFENSE
Due by 10/20/2026
Bid Solicitation # CAO127-CAO4-6490 Bid Solicitation # CAO127-CAO4-6490 Organization Name County Administrative Office
County of San Bernardino
Due by 10/02/2026
[Event Title] Events Search Event :
City and County of San Francisco
Due by 9/28/2026