McFarland Comprehensive Plan Update

Agency: Village of McFarland
State: Wisconsin
Type of Government: State & Local
NAICS Category:
  • 541611 - Administrative Management and General Management Consulting Services
Posted Date: Apr 29, 2026
Due Date: May 29, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: McFarland Comprehensive Plan Update
Category: Village of McFarland RFPs
Status: Open
Description:

The Village of McFarland seeks a multidisciplinary consultant team to complete a 10-year update of the Village’s 2017 Comprehensive Plan meeting all the requirements of Wis. Stat. 66.1001

Publication Date/Time:
4/29/2026 8:00 AM
Closing Date/Time:
5/29/2026 4:00 PM
Related Documents:

Attachment Preview

Request For Proposals
2027 Comprehensive Plan
RFP Issuance Date: April 28, 2026
RFP Due Date: By 4:00 PM on May 29, 2026
Please Submit to:
Village of McFarland
Department of Community & Economic Development
Attn: Andrew Bremer, AICP
Community & Economic Development Director
5915 Milwaukee Street
PO Box 110
McFarland, WI 53558
1
TABLE OF CONTENTS
Contents
SECTION 1 Purpose .................................................................................................................... 3
SECTION 2 Community Background........................................................................................... 3
SECTION 3 Project Background .................................................................................................. 4
SECTION 4 Project and Plan Objectives ..................................................................................... 7
SECTION 5 Scope of Work.......................................................................................................... 8
SECTION 6 Deliverables............................................................................................................ 11
SECTION 7 RFP Submittal Requirements ................................................................................. 11
SECTION 8 Evaluation Criteria.................................................................................................. 14
SECTION 9 Method & Timeline of Selection ............................................................................ 15
SECTION 10 Terms and Conditions ............................................................................................ 16
SECTION 11 RFP Exhibits ............................................................................................................. 17
2
SECTION 1 Purpose
The Village of McFarland seeks a multidisciplinary consultant team to complete a 10-year update
of the Village’s 2017 Comprehensive Plan meeting all the requirements of Wis. Stat. 66.1001.
The planning area consists of all lands within the Village of McFarland boundary and those lands
within the Village’s 1.5-mile extraterritorial plat review jurisdiction. Through this planning
project, the Village seeks to reevaluate the recommendations within the 2023 East Side Plan and
2005 Terminal and Triangle District Plan as part of the incorporation of land use planning
recommendations for those areas within the next Comprehensive Plan. As part of adoption of
the final 2027 Comprehensive Plan, the Village desires to retire the 2023 East Side Plan and 2005
Terminal and Triangle District Plan. In addition to experience completing comprehensive plans
meeting the requirements of Wis. Stat. 66.1001, the most desirable consultant team will possess
a proven track record of community engagement, community consensus building, and public
relations. This includes conducting inclusive and innovative community engagement practices
and working with the Village to bring the community together in the planning process.
The Community & Economic Development Director will serve as the Village’s Project Manager
and point of contact for the consultant. An Ad-hoc Comprehensive Plan Steering Committee will
be formed to oversee the plan’s development. The Ad-hoc Committee will consist of the
members of the Village’s existing Community Development Authority and Plan Commission. The
Committee will meet as needed to discuss the planning project and draft deliverables.
Additionally, the planning process will likely require input from other various Village
committees/commissions/board, Village staff, residents, property, and business owners. The
Village is currently utilizing a hybrid of in-person and Zoom public meetings. The Consultant
should anticipate a combination of in-person, remote, or hybrid meetings throughout the
planning process.
SECTION 2 Community Background
The Village of McFarland is located adjacent to the southeast side of the City of Madison in Dane
County, WI. US Highway 51 serves as the main connection point between the neighboring cities
of Madison and Stoughton. The January 1, 2025 population of McFarland is estimated at 9,737
residents. The Village and some surrounding communities are served by the McFarland School
District. The District includes two elementary schools, a middle school, and one high school. In
the 2024-2025 school year, the District reported 2,389 enrolled students.
The Village is bounded on the west by Lake Waubesa/Upper Mud Lake and to the south by the
Yahara River and Lower Mud Lake. These natural water bodies and the Village’s emphasis on
outdoor park, conservancy, and recreation amenities contribute to the Village’s tagline Naturally
Connected. The Village also places a strong emphasis on connecting Village operations to the
residents and stakeholder which we serve. This includes an internal Communications Manager
and supportive staff that work collectively with Village Department Heads and the Village Board,
3
Committees, and Commissions to utilize a number of tools to inform and engage the community
regarding Village operations and projects.
In August of 2025 the Village updated its vision and mission statements:
Vision Statement
McFarland strives to be a community that works for everyone. With smart planning, responsible
leadership, and strong local services, McFarland is a great place to live, work, and belong.
Mission Statement
We serve McFarland by providing everyday services that support community well-being by
leading with care, planning with purpose and acting with accountability. We work to earn trust
and make decisions that reflect shared values.
Our Values
Trust: We seek to build a foundation on transparency and honesty.
Care: We serve with empathy, kindness, and respect.
Responsibility: We act with accountability to our community.
Balance: We grow in ways that are thoughtful and protect what makes us unique.
Engagement: We work together to strengthen relationships and belonging.
Action: We focus on real, practical outcomes that serve our residents.
More information about the Village is available at www.mcfarland.wi.us.
SECTION 3 Project Background
The Village last updated its Comprehensive Plan in 2017. The existing plan has served the
community well and there have only been four amendments to the plan since its original
adoption. The Village has a number of other existing plans and studies that support community
planning including:
2026-2030 Capital Improvement
Plan
2025 Siggelkow Road Traffic Study
2025 Comprehensive Outdoor
Recreation Plan
2025 Town of Dunn Boundary
Agreement
2024 TID #6 Project Plan
2023 Municipal Center Campus
Master Plan
2023 East Side Plan
2023 Economic Strategic Plan
2023 Housing Needs Assessment
Study
2022 Dane County Hazard
Mitigation Plan
2020 Strategic Plan, Amended 2025
2021 Sustainability Plan
2017 TID #5 Project Plan
2015 TIF #3 Amended Project Plan
2015 TIF #4 Amended Project Plan
2010 Downtown Strategic Market
Analysis and Opportunities
Assessment
2008 TIF District #4 Project Plan
4
2007 TIF District #3 Amended
Project Plan
2005 Terminal & Triangle District
Plan
2005 Highway 51 Corridor Concept
Plan
2004 TIF District #3 Project Plan
1999 Village Center Master Plan
Copies of these plans are available on the Community & Economic Development website under
the Community Development Plans tab.
Due to existing natural features, municipal boundaries, and existing and potential municipal
boundary agreements, the Village’s growth opportunities over the next 10-years are primarily
limited to infill redevelopment and eastern greenfield expansion.
Current Projects Relevant to the Comprehensive Plan Project
Madison-McFarland Intergovernmental Agreement. The Village and City recently wrapped up
several public information meetings regarding potential concepts for a new intergovernmental
agreement, including short and long-term boundary amendments and annexation policies. The
Village and City previously had an agreement that was adopted in 1997 and expired in 2018, a
year after the 2017 Comprehensive Plan was adopted. This project is currently on hold pending
the likely submittal of an annexation petition from residents within the Town of Blooming Grove
April Hills subdivisions. The Village anticipates receiving the annexation petition within the next
several months. Village Board decisions regarding the annexation petition and whether to
proceed with an IGA with the City will likely be concluded by the end of 2026. If the Village Board
decides to continue with the IGA project, official adoption is not anticipated until 2027.
Siggelkow Road Traffic Study and 30% Design Plans. In response to community concerns
regarding existing and future traffic conditions along Siggelkow Road, the Village completed a
traffic study of Siggelkow Road from Erling Avenue to CTH AB in the Fall of 2025. The Traffic
Study is being utilized by the Village Engineer as part of the development of 30% design plans for
future reconstruction of the portion of Siggelkow Road from Catalina Parkway to CTH AB. The
Village anticipates completing the 30% design plans by the end of this Spring.
USH 51 Reconstruction. While not a specific Village led project, the WisDOT is currently
reconstruction USH 51 from Stoughton to Siggelkow Road. The Siggelkow Road portion of this
project has been completed. Portions from the Yahara River bridge to Larson Beach Road will be
reconstructed in 2026-2028. The WisDOT is also completing a study of USH 51 from Voges
Road/Terminal Drive to WIS 30.
Recent Projects Relevant to the Comprehensive Plan Project
2023 East Side Plan. In 2023 the Village adopted the 2023 East Side Plan which replaced the 2008
East Side Neighborhood Growth Area Plan. This plan was unanimously adopted by the CDA, Plan
Commission and Village Board after a multi-year planning and community engagement process.
5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Solicitation Reference #: 2612 Title: Operational Study for Corrections Available Date: 5/1/2026 Due

State Government of Wisconsin

Bid Due: 6/17/2026

2026-42 Old Town Hall Road Design Services Proposals due 6/18/2026 at 2:00pm CT.

City of Eau Claire

Bid Due: 6/18/2026

Due 6/10/2026 10:00 am US/Central Open TS-2754 - On-Call Construction Services for District

Milwaukee Metropolitan Sewerage District (MMSD)

Bid Due: 6/10/2026

Bid Title: Evaluation and Preliminary Design Engineering Services Category: Bid Postings Status: Open

Oconomowoc city

Bid Due: 6/19/2026