McBurney Road Culvert Remediation

Agency: PennBid
State: Pennsylvania
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238910 - Site Preparation Contractors
Posted Date: Jul 30, 2025
Due Date: Aug 25, 2025
Solicitation No: Canonsburg Borough, Washington County
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Project: McBurney Road Culvert Remediation
Ref. #: Canonsburg Borough, Washington County
Type: IFB
Status:
Open
Open Date: Jul 28th 2025, 8:00 AM EDT
Questions Due Date: Aug 18th 2025, 10:00 AM EDT
Close Date: Aug 25th 2025, 10:00 AM EDT
Contract Type:
Fixed Fee Contract
County, State:
Washington County, PA
Design Firm:
Remington and Vernick Engineers

Project Description: Canonsburg Borough is proposing to perform storm culvert maintenance to alleviate flooding along McBurney Road and the private properties in the area. In general, the Base Bid work consists of, but is not limited to heavy jet spraying or bucketed removal to clean sediment and debris from existing culverts at several strategic collection sites along the drainageway, removal and hauling of debris to designated location, CCTV inspection of culverts, installation of a new precast concrete trench drain across McBurney Road to capture and redirect runoff to the existing culverts and drainageway, and installation of a rip rap apron at the trench drain outlet. Added optional items to be determined by the Owner include extension of existing culverts, backfill, installation of new headwalls with trash racks, and rebuilding existing inlet grates and risers. Work will also include asphalt roadway restoration, asphalt wedge curb installation, temporary erosion and sediment controls, mobilization, maintenance and protection of traffic as necessary to perform the work. For all cleaning of culverts, Contractor shall assume 115-120 lb/ft3 debris will be cleaned out from the culverts. The McBurney Road Culvert Remediation consists of Two (2) Contracts. Contract One (1) requires the Heavy Jet Cleaning of sediments from the existing culverts. Contract Two (2) requires the installation of a twenty-four-inch sloped precast concrete trench drain in the roadway. Contract Two (2) Add Option Bid pricing is to include all elements of the Base Bid, and the installation of two contractor adjusted and measured headwalls at the culvert openings within the project worksite. Both Contracts require a 10% Bid Bond. Both contracts require 100% Performance and Payment Bonds. Contract 1 is maintenance only and does not require prevailing wage rates or a warranty bond. Contract 2 for structures requires a 100% warranty bond and state prevailing wage rates.


Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Project: Clem Macrone Park Rectangular Rapid Flashing Beacon (RRFB) Project (Contract #B-26-002) Ref.

PennBid

Due by 9/30/2026

Facility: David L. Lawrence Convention Center Project: Exterior Loading Dock Roll Door Replacement

Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)

Due by 9/22/2026

Project: MUNICIPAL BUILDING HVAC REPLACEMENT Ref. #: Lower Nazareth Township, Northampton County Type:

PennBid

Due by 9/17/2026

ABK Daycare (Envision Center) Emergency Egress Project IFB#600-22-26 OPEN The Housing Authority of

Housing Authority of the City of Pittsburgh

Due by 9/30/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.