| Agency: | City of Wheaton |
|---|---|
| State: | Illinois |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 25, 2026 |
| Due Date: | Apr 15, 2026 |
| Solicitation No: | 26-63 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Number: |
26-63
|
| Bid Title: |
Manchester Road Bridge & Retaining Wall Rehabilitation, Painting & Staining
|
| Category: | City of Wheaton Bids - Building & Construction Improvements |
| Status: | Open |
|
CITY OF WHEATON PUBLIC WORKS
STRUCTURE REHABILITATION, PAINTING AND STAINING
S.N. 022-7204 AND ADJACENT RETAINING WALLS
SPECIFICATIONS FOR FINAL CONTRACT PACKAGE
* Cleaning and Painting Railing
o References IDOT Guide Bridge Special Provision #25 - Cleaning and Painting Existing
Steel Structures as appropriate.
o General surface assessment, preparation, and paint system information. Spec focuses on
overcoating existing system on galvanized steel and provides provisions for other
methods if the existing paint system is determined to be insufficient for an overcoating.
* Selective Clearing
o Vegetation removal as needed for workspace along retaining walls
* Silicone Joint Sealer
o Provided for concrete joint seal replacement and new applications as indicated in the
Plans.
* Staining Concrete Structures
o Product and color definition
o Surface preparation including mortar repairs is included in the Staining specification.
* Structural Repair of Concrete
o IDOT BDE Special Provision 80480
o Provided for concrete repairs on structural elements as indicated on the plans.
* Traffic Control Specifications
o Traffic Control & Protection, (Special)
o Public Convenience and Safety (IDOT District 1)
o Keeping Arterial Roadways Open to Traffic (Lane Closures Only) (IDOT District 1)
o Vehicle and Equipment Warning Lights (IDOT BDE)
o Work Zone Traffic Control Devices (IDOT BDE)
CLEANING AND PAINTING RAILING
Description: This work shall consist of cleaning and preparation of the existing galvanized steel surfaces,
and the furnishing, application, and protection of the coatings according to the applicable portions of
IDOT Guide Bridge Special Provision (GBSP) 25 for Cleaning and Painting Existing Steel Structures, except
as modified herein. The intent is to match the color and overcoat the existing paint to the satisfaction of
the City of Wheaton (Owner).
Materials: Materials shall be per GBSP 25 and as indicated herein.
Submittals: Submittals to the Owner shall be per GBSP 25. The Surface Preparation / Painting Plan shall
address the existing paint system condition, surface preparation, painting, and touch up/repair of the
galvanized surfaces.
Determining Condition of Existing Paint System: The condition of the existing paint system shall be
evaluated by a certified Coating Application Specialist (CAS) or Engineer-approved equivalent to
determine if overcoating is the appropriate methodology for repainting of the existing railing and to
advise on the appropriate methodology to employ for the overcoating. The surface preparation and
application of the overcoating system as indicated herein shall be followed.
If the CAS determines that overcoating the existing system is not the appropriate repainting method, the
Owner will select a surface preparation and paint system application per the applicable provisions of
GBSP 25.
Surface Preparation: Surface preparation of the previously coated galvanized surfaces shall be per the
applicable provisions in GBSP 25, or as directed by the paint manufacturer.
Paint Systems: The designated areas shall be painted according to the requirements of Paint System 2 -
PS/EM/U for overcoating the existing paint system. System 2 shall consist of the application of a full coat
of epoxy penetrating sealer, a spot intermediate coat of aluminum epoxy mastic and a stripe and full
finish coat of aliphatic urethane per GBSP 25.
For reference, the following paint system is typical of the type and quality of paint system that was
specified for the original coating of the galvanized steel railings:
* Primer and Intermediate Coat: Tnemec - 66/161 High Build Epoxoline - 2.5 mil dry film thickness
* Top Coat: Tnemec - Series 75 Endura-Shield - 3.5 mil dry film thickness
Basis of Payment: This work will be paid for at the contract lump sum price for CLEANING AND PAINTING
BRIDGE FENCE RAILING and CLEANING AND PAINTING PARAPET RAILING, at the designated locations.
Payment will not be authorized until all requirements for surface preparation and painting have been
fulfilled. Payment will also not be authorized for non-conforming work until the discrepancy is resolved
in writing.
CLEANING AND PAINTING EXISTING STEEL STRUCTURES
Effective: October 2, 2001
Revised: October 17, 2025
Description. This work shall consist of the preparation of all designated metal surfaces by the
method(s) specified on the plans. This work also includes the painting of those designated
surfaces. This work also includes caulking locations designated on the plans and painting with
the paint system(s) specified on the plans. The Contractor shall furnish all materials,
equipment, labor, and other essentials necessary to accomplish this work and all other work
described herein and as directed by the Engineer.
Materials. All materials to be used on an individual structure shall be produced by the same
manufacturer.
The Bureau of Materials and Physical Research has established a list of all products that have
met preliminary requirements. Each batch of material, except for the penetrating sealer, shall
be tested and assigned a CMMS approval number before use. The specified colors shall be
produced in the coating manufacturer's facility. Tinting of the coating after it leaves the
manufacturer's facility is not allowed.
The paint materials shall meet the following requirements of the Standard Specification and as
noted below:
Item Article
(a) Waterborne Acrylic 1008.04
(b) Aluminum Epoxy Mastic 1008.03
(c) Organic Zinc Rich Primer 1008.05
(d) Epoxy/ Aliphatic Urethane 1008.05
(e) Penetrating Sealer (Note 1)
(f) Moisture Cured Zinc Rich Urethane Primer (Note 2)
(g) Moisture Cured Aromatic/Aliphatic Urethane (Note 2)
(h) Moisture Cured Penetrating Sealer (Note 3)
(i) Caulk (Polyurethane Joint Sealant) 1050.04
Note 1: The Epoxy Penetrating Sealer shall be a cross-linked multi component sealer. The
sealer shall have the following properties:
(a) The volume solids shall be 98 percent (plus or minus 2 percent).
(b) Shall be clear or slightly tinted color.
Note 2: These material requirements shall be according to the Special Provision for the Moisture
Cured Urethane Paint System.
Note 3: The Moisture Cured Penetrating Sealer manufacturer's certification will be required.
1
Submittals. The Contractor shall submit for Engineer review and acceptance, the following
plans and information for completing the work. The submittals shall be provided within 30 days
of execution of the contract unless given written permission by the Engineer to submit them at a
later date. Work cannot proceed until the submittals are accepted by the Engineer. Details for
each of the plans are presented within the body of this specification.
a) Contractor/Personnel Qualifications. Evidence of Contractor qualifications and the
names and qualifications/experience/training of the personnel managing and
implementing the Quality Control program and conducting the quality control tests, and
certifications for the CAS (Coating Application Specialists) on SSPC-QP1 and QP2
projects.
b) Quality Control (QC) Program. The QC Program shall identify the following: the
instrumentation that will be used, a schedule of required measurements and
observations, procedures for correcting unacceptable work, and procedures for
improving surface preparation and painting quality as a result of quality control findings.
The program shall incorporate at a minimum, the IDOT Quality Control Daily Report
form, or a Contractor form (paper or electronic) that provides equivalent information.
c) Inspection Access Plan. The inspection access plan for use by Contractor QC
personnel for ongoing inspections and by the Engineer during Quality Assurance (QA)
observations.
d) Surface Preparation/Painting Plan. The surface preparation/painting plan shall include
the methods of surface preparation and type of equipment to be utilized for washing,
hand/power tool cleaning, removal of rust, mill scale, paint or foreign matter, abrasive
blast or water jetting, and remediation of chloride. If detergents, additives, or inhibitors
are incorporated into the water, the Contractor shall include the names of the materials
and Safety Data Sheets (SDS). The Contractor shall identify the solvents proposed for
solvent cleaning together with SDS.
If cleaning and painting over existing galvanized surfaces are specified, the plan shall
address surface preparation, painting, and touch up/repair of the galvanized surfaces.
The plan shall also include the methods of coating application and equipment to be
utilized.
If the Contractor proposes to heat or dehumidify the containment, the methods and
equipment proposed for use shall be included in the Plan for the Engineer's
consideration.
e) Paint Manufacturer Certifications and Letters. When a sealer is used, the Contractor
shall provide the manufacturer's certification of compliance with IDOT testing
requirements listed under "Materials" above. A certification regarding the compatibility of
the sealer with the specified paint system shall also be included.
2
When rust inhibitors are used, the Contractor shall provide a letter from the coating
manufacturer indicating that the inhibitor is compatible with and will not adversely affect
the performance of the coating system.
If the use of a chemical soluble salt remover is proposed by the Contractor, provide a
letter from the coating manufacturer indicating that the material will not adversely affect
the performance of the coating system.
The paint manufacturer's most recent application and thinning instructions, SDS and
product data sheets shall be provided, with specific attention drawn to storage
temperatures, and the temperatures of the material, surface and ambient air at the time
of application.
A letter or written instructions from the coating manufacturer shall be provided indicating
the length of time that each coat must be protected from cold or inclement weather (e.g.,
exposure to rain) during its drying period, the maximum recoat time for each coat, and
the steps necessary to prepare each coat for overcoating if the maximum recoat time is
exceeded.
f) Abrasives. Abrasives to be used for abrasive blast cleaning, including SDS. For
expendable abrasives, the Contractor shall provide certification from the abrasive
supplier that the abrasive meets the requirements of SSPC-AB1. For steel grit
abrasives, the certification shall indicate that the abrasive meets the requirements of
SSPC-AB3.
g) Protective Coverings. Plan for containing or controlling paint debris (droplets, spills,
overspray, etc.). Any tarpaulins or protective coverings proposed for use shall be fire
retardant. For submittal requirements involving the containment used to remove lead
paint, the Contractor shall refer to Special Provision for Containment and Disposal of
Lead Paint Cleaning Residues.
h) Progress Schedule. Progress schedule shall be submitted per Article 108.02 and shall
identify all major work items (e.g., installation of rigging/containment, surface
preparation, and coating application).
When the Engineer accepts the submittals, the Contractor will receive written notification. The
Contractor shall not begin any paint removal work until the Engineer has accepted the
submittals. The Contractor shall not construe Engineer acceptance of the submittals to imply
approval of any particular method or sequence for conducting the work, or for addressing health
and safety concerns. Acceptance of the programs does not relieve the Contractor from the
responsibility to conduct the work according to the requirements of Federal, State, or Local
regulations and this specification, or to adequately protect the health and safety of all workers
involved in the project and any members of the public who may be affected by the project. The
Contractor remains solely responsible for the adequacy and completeness of the programs and
work practices, and adherence to them.
3
Contractor Qualifications. Unless indicated otherwise on the contract plans, for non lead
abatement projects, the painting Contractor shall possess current SSPC-QP1 certification.
Unless indicated otherwise on the plans, for lead abatement projects the Contractor shall also
possess current SSPC-QP2 certification. The Contractor shall maintain certified status
throughout the duration of the painting work under the contract. The Department reserves the
right to accept Contractors documented to be currently enrolled in the SSPC-QP7, Painting
Contractor Introductory Program, Category 2, in lieu of the QP certifications noted above.
Quality Control (QC) Inspections. The Contractor shall perform first line, in process QC
inspections. The Contractor shall implement the submitted and accepted QC Program to ensure
that the work accomplished complies with these specifications. The designated Quality Control
inspector shall be onsite full time during any operations that affect the quality of the coating
system (e.g., surface preparation and chloride remediation, coating mixing and application, and
evaluations between coats and upon project completion). The Contractor shall use the IDOT
Quality Control Daily Report form to record the results of quality control tests. Alternative forms
(paper or electronic) will be allowed provided they furnish equivalent documentation as the
IDOT form, and they are accepted as part of the QC Program submittal. The completed reports
shall be turned into the Engineer before work resumes the following day. The Engineer or
designated representative will sign the report. The signature is an acknowledgment that the
report has been received but should not be construed as an agreement that any of the
information documented therein is accurate.
Contractor QC inspections shall include, but not be limited to the following:
* Suitability of protective coverings and the means employed to control project debris and
paint spills, overspray, etc.
* Ambient conditions
* Surface preparation (solvent cleaning, pressure washing including chalk tests,
hand/power tool or abrasive blast cleaning, etc.)
* Chloride remediation
* Coating application (specified materials, mixing, thinning, and wet/dry film thickness)
* Recoat times and cleanliness between coats
* Coating continuity and coverage (freedom from runs, sags, overspray, dryspray,
pinholes, shadow-through, skips, misses, etc.)
The personnel managing the Contractor's QC Program shall possess a minimum classification
of Society of Protective Coatings (SSPC) BCI certified, National Association of Corrosion
Engineers (NACE) Coating Inspector Level 2 - Certified and shall provide evidence of
successful inspection of 3 bridge projects of similar or greater complexity and scope that have
been completed in the last 2 years. Copies of the certification and experience shall be provided.
References for experience shall be provided and shall include the name, address, and
telephone number of a contact person employed by the bridge owner.
4
The personnel performing the QC tests shall be trained in coatings inspection and the use of the
testing instruments. Documentation of training shall be provided. The QC personnel shall not
perform hands on surface preparation or painting activities. Painters shall perform wet film
thickness measurements, with QC personnel conducting random spot checks of the wet film.
The Contractor shall not replace the QC personnel assigned to the project without advance
notice to the Engineer, and acceptance of the replacement(s), by the Engineer.
The Contractor shall supply all necessary equipment with current calibration certifications to
perform the QC inspections. Equipment shall include the following at a minimum:
* Sling psychrometer or digital psychrometer for the measurement of dew point and
relative humidity, together with all necessary weather bureau tables or psychrometric
charts. In the event of a conflict between readings with the sling psychrometer and the
digital psychrometer, the readings with the sling psychrometer shall prevail.
* Surface temperature thermometer
* SSPC Visual Standards VIS 1, Guide and Reference Photographs for Steel Surfaces
Prepared by Dry Abrasive Blast Cleaning; SSPC-VIS 3, Visual Standard for Power and
Hand-Tool Cleaned Steel; SSPC-VIS 4, Guide and Reference Photographs for Steel
Prepared by Water Jetting, and/or SSPC-VIS 5, Guide and Reference Photographs for
Steel Prepared by Wet Abrasive Blast Cleaning, as applicable.
* Test equipment for determining abrasive cleanliness (oil content and water-soluble
contaminants) according to SSPC abrasive specifications AB1, AB2, and AB3.
* Commercially available putty knife of a minimum thickness of 40 mils (1mm) and a width
between 1 and 3 in. (25 and 75 mm). Note that the putty knife is only required for
projects in which the existing coating is being feathered and tested with a dull putty knife.
* Testex Press-O-Film Replica Tape and Micrometer compliant with Method C of ASTM
D4417, Standard Test Methods for Field Measurement of Surface Profile of Blast
Cleaned Steel, or digital profile depth micrometer compliant with ASTM D4417, Method
B. In the event of a conflict between measurements with the two instruments on
abrasive blast cleaned steel, the results with the Testex Tape shall prevail. Note that for
measuring the profile of steel power tool cleaned to SSPC-SP15, Commercial Grade
Power Tool Cleaning, the digital profile depth micrometer shall be used.
* Bresle Cell Kits or CHLOR*TEST kits for chloride determinations, or equivalent
* Wet Film Thickness Gage
* Blotter paper for compressed air cleanliness checks
* Type 2 Electronic Dry Film Thickness Gage per SSPC - PA2, Procedure for Determining
Conformance to Dry Coating Thickness Requirements
* Standards for verifying the accuracy of the dry film thickness gage
* Light meter for measuring light intensity during paint removal, painting, and inspection
activities
* All applicable ASTM and SSPC Standards used for the work (reference list attached)
The accuracy of the instruments shall be verified by the Contractor's personnel according to the
equipment manufacturer's recommendations and the Contractor's QC Program. All inspection
equipment shall be made available to the Engineer for QA observations on an as needed basis.
5
Hold Point Notification. Specific inspection items throughout this specification are designated as
Hold Points. Unless other arrangements are made at the project site, the Contractor shall
provide the Engineer with a minimum 4-hour notification before a Hold Point inspection will be
reached. If the 4-hour notification is provided and the Work is ready for inspection at that time,
the Engineer will conduct the necessary observations. If the Work is not ready at the appointed
time, unless other arrangements are made, an additional 4-hour notification is required.
Permission to proceed beyond a Hold Point without a QA inspection will be granted solely at the
discretion of the Engineer, and only on a case by case basis.
Quality Assurance (QA) Observations. The Engineer will conduct QA observations of any or all
phases of the work. The presence or activity of Engineer observations in no way relieves the
Contractor of the responsibility to provide all necessary daily QC inspections of his/her own and
to comply with all requirements of this Specification.
The Engineer has the right to reject any work that was performed without adequate provision for
QA observations.
Inspection Access and Lighting. The Contractor shall facilitate the Engineer's observations as
required, including allowing ample time to view the work. The Contractor shall furnish, erect and
move scaffolding or other mechanical equipment to permit close observation of all surfaces to
be cleaned and painted. This equipment shall be provided during all phases of the work.
Examples of acceptable access structures include:
* Mechanical lifting equipment, such as, scissor trucks, hydraulic booms, etc.
* Platforms suspended from the structure comprised of trusses or other stiff supporting
members and including rails and kick boards.
* Simple catenary supports are permitted only if independent lifelines for attaching a fall
arrest system according to Occupational Safety and Health Administration (OSHA)
regulations are provided.
When the surface to be inspected is more than 6 ft. (1.8 m) above the ground or water surface,
and fall prevention is not provided (e.g., guardrails are not provided), the Contractor shall
provide the Engineer with a safety harness and a lifeline according to OSHA regulations. The
lifeline and attachment shall not direct the fall into oncoming traffic. The Contractor shall
provide a method of attaching the lifeline to the structure independent of the inspection facility or
any support of the platform. When the inspection facility (e.g., platform) is more than 2 1/2 ft.
(800 mm) above the ground, the Contractor shall provide an approved means of access onto
the platform.
The Contractor shall provide artificial lighting in areas both inside and outside the containment
where natural light is inadequate, as determined by the Engineer, to allow proper cleaning,
inspection, and painting. Illumination for inspection shall be at least 30 foot-candles (325 LUX).
Illumination for cleaning and painting, including the working platforms, access and entryways
shall be at least 20 foot-candles (215 LUX). General work area illumination outside the
containment shall be employed at the discretion of the Engineer and shall be at least 5 foot-
6
candles. The exterior lighting system shall be designed and operated so as to avoid glare that
interferes with traffic, workers, and inspection personnel.
Surface Preparation and Painting Equipment. All cleaning and painting equipment shall include
gages capable of accurately measuring fluid and air pressures and shall have valves capable of
regulating the flow of air, water or paint as recommended by the equipment manufacturer. The
equipment shall be maintained in proper working order.
Diesel or gasoline powered equipment shall be positioned or vented in a manner to prevent
deposition of combustion contaminants on any part of the structure.
Hand tools, power tools, pressure washing, water jetting, abrasive blast cleaning equipment,
brushes, rollers, and spray equipment shall be of suitable size and capacity to perform the work
required by this specification. All power tools shall be equipped with vacuums and High
Efficiency Particulate Air (HEPA) filtration. Appropriate filters, traps and dryers shall be provided
for the compressed air used for abrasive blast cleaning and conventional spray application.
Paint pots shall be equipped with air operated continuous mixing devices unless prohibited by
the coating manufacturer.
Test Sections. Prior to surface preparation, the Contractor shall prepare a test section(s) on
each structure to be painted in a location(s) which the Engineer considers to be representative
of the existing surface condition and steel type for the structure as a whole. More than one test
section may be needed to represent the various design configurations of the structure. The
purpose of the test section(s) is to demonstrate the use of the tools and degree of cleaning
required (cleanliness and profile) for each method of surface preparation that will be used on the
project. Each test section shall be approximately 10 sq. ft. (0.93 sq m). The test section(s) shall
be prepared using the same equipment, materials and procedures as the production operations.
The Contractor shall prepare the test section(s) to the specified level of cleaning according to
the appropriate SSPC visual standards, modified as necessary to comply with the requirements
of this specification. The written requirements of the specification prevail in the event of a
conflict with the SSPC visual standards. Only after the test section(s) have been approved shall
the Contractor proceed with surface preparation operations. Additional compensation will not
be allowed the Contractor for preparation of the test section(s).
For the production cleaning operations, the specifications and written definitions, the test
section(s), and the SSPC visual standards shall be used in that order for determining
compliance with the contractual requirements.
Protective Coverings and Damage. All portions of the structure that could be damaged by the
surface preparation and painting operations (e.g., utilities), including any sound paint that is
allowed to remain according to the contract documents, shall be protected by covering or
shielding. Tarpaulins drop cloths, or other approved materials shall be employed. The
Contractor shall comply with the provisions of the Illinois Environmental Protection Act. Paint
drips, spills, and overspray are not permitted to escape into the air or onto any other surfaces or
surrounding property not intended to be painted. Containment shall be used to control paint
drips, spills, and overspray, and shall be dropped and all equipment secured when sustained
7
wind speeds of 40 mph (64 kph) or greater occur, unless the containment design necessitates
action at lower wind speeds. The contractor shall evaluate project-specific conditions to
determine the specific type and extent of containment needed to control the paint emissions and
shall submit a plan for containing or controlling paint debris (droplets, spills, overspray, etc.) to
the Engineer for acceptance prior to starting the work. Acceptance by the Engineer shall not
relieve the Contractor of their ultimate responsibility for controlling paint debris from escaping
the work zone.
When the protective coverings need to be attached to the structure, they shall be attached by
bolting, clamping, or similar means. Welding or drilling into the structure is prohibited unless
approved by the Engineer in writing. When removing coatings containing lead the containment
and disposal of the residues shall be as specified in the Special Provision for Containment and
Disposal of Lead Paint Cleaning Residues contained elsewhere in this Contract. When
removing coatings not containing lead the containment and disposal of the residues shall be as
specified in the Special Provision for Containment and Disposal of Non-Lead Paint Cleaning
Residues contained elsewhere in this Contract.
The Contractor shall be responsible for any damage caused to persons, vehicles, or property,
except as indemnified by the Response Action Contractor Indemnification Act. Whenever the
intended purposes of the controls or protective devices used by the Contractor are not being
accomplished, work shall be immediately suspended until corrections are made. Damage to
vehicles or property shall be repaired by the Contractor at the Contractor's expense. Painted
surfaces damaged by any Contractor's operation shall be repaired, removed and/or repainted,
as directed by the Engineer, at the Contractor's expense.
Weather Conditions. Surfaces to be painted after cleaning shall remain free of moisture and
other contaminants. The Contractor shall control his/her operations to ensure that dust, dirt, or
moisture do not come in contact with surfaces cleaned or painted that day.
a) The surface temperature shall be at least 5F (3C) above the dew point during final
surface preparation operations. The manufacturers' published literature shall be followed
for specific temperature, dew point, and humidity restrictions during the application of each
coat.
b) If the Contractor proposes to control the weather conditions inside containment, proposed
methods and equipment for heating and/or dehumidification shall be included in the work
plans for the Engineer's consideration. Only indirect fired heating equipment shall be used
to prevent the introduction of moisture and carbon monoxide into the containment. The
heating unit(s) shall be ventilated to the outside of the containment. Any
heating/dehumidification proposals accepted by the Engineer shall be implemented at no
additional cost to the department.
c) Cleaning and painting shall be done between April 15 and October 31 unless authorized
otherwise by the Engineer in writing.
8
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
ITB #26-054 - 151st Street & Regent Drive Traffic Signal Improvements, Construction Date:
Orland Park village
Bid Due: 8/03/2026
Project: C26FI103338505 - RFQ - Mid-Level Construction Work Order Contracting Services (MID-CON) Ref.
Chicago Transit Authority
Bid Due: 8/13/2026
Bid Title: Wastewater Plant Grit Classifier Replacement Category: Requests For Bids and Proposals
City of Geneva
Bid Due: 8/10/2026
Opens August 11 - Effingham Eiche & Kreke Water Main Replacement - Specifications
Effingham city
Bid Due: 8/11/2026