Maintenance Dredging of New Haven Harbor in New Haven, CT
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Connecticut |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Apr 29, 2025 |
| Due Date: | May 29, 2025 |
| Solicitation No: | W912WJ25BA002 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Apr 29, 2025 09:36 am EDT
- Original Response Date: May 29, 2025 01:00 pm EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jun 13, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
New Haven , CTUSA
The U.S. Army Corps of Engineers, New England District will be issuing an unrestricted Invitation for Bids (IFB) solicitation for maintenance dredging of the New Haven Harbor Federal Navigation Project (FNP) located in New Haven, CT. The NAICS code for the work is 237990. The estimated construction cost is between $10,000,000.00 and $25,000,000.00.
The New Haven Harbor O&M dredging project consists of dredging the 35-foot deep navigation channel and 35-foot deep turning basin below mean lower low water (MLLW) from Long Island Sound to the confluence at the Quinnipiac River. Approximately 770,000 cubic yards of predominantly silt and fine grain sand material shall be dredged from the 35-foot main channel and 35-foot turning basin during execution of this project. It is expected that a mechanical dredge will remove material from the shoaled portions of New Haven Harbor channel and place it into scows before being delivered to the Central Long Island Sound Disposal Site. Dredging and disposal operations are anticipated to take 4 to 5 months, and will be performed during the period from October 1, 2025 to 15 February, 2026 to meet environmental time of year (ToY) restrictions.
In order to accomplish all dredging requirements within the specified dredging window it is expected that the Contractor will need to meet a production rate of 200,000 CY per 30 calendar days. Environmental coordination and permitting has been completed by the U.S. Army of Engineers, New England District.
This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about May 13, 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online. In order to view the solicitation offerors must access the System for Award Management website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the USACE New England District. Additional questions may be emailed to the Contract Specialist at tyler.s.maryak@usace.army.mil.
- KO CONTRACTING DIVISION 696 VIRGINIA ROAD
- CONCORD , MA 01742-2751
- USA
- Tyler Maryak
- tyler.s.maryak@usace.army.mil
- Phone Number 9783188049
- Erin E. Bradley
- erin.e.bradley@usace.army.mil
- Apr 29, 2025 09:36 am EDTPresolicitation (Original)
Related Document
See Also
Follow Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT Active Contract
DEPT OF DEFENSE
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
City of Stamford
Due by 12/10/2026
Construction Manager-at-Risk for the Water Street Parking Garage Expansion The existing Water Street
State Government of Connecticut
Due by 12/01/2026
Follow Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical
DEPT OF DEFENSE
Due by 11/20/2026