Maintenance Dredging, Kennebec River, Kennebec Maine
| Agency: |
DEPT OF DEFENSE |
| State: |
Maine |
| Type of Government: |
Federal |
| FSC Category: |
- Y - Construction of Structures and Facilities
|
| NAICS Category: |
- 237990 - Other Heavy and Civil Engineering Construction
|
| Posted Date: |
Jul 29, 2026 |
| Due Date: |
Jul 28, 2026 |
| Solicitation No: |
W912WJ26BA015 |
| Original Source: |
Please Login to View Page |
| Contact information: |
Please Login to View Page |
| Bid Documents: |
Please Login to View Page |
Maintenance Dredging, Kennebec River, Kennebec Maine
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION NORTH ATLANTIC
Sub Command 2
ENDIST NEW ENGLAND
Office
W2SD ENDIST NEW ENGLAND
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Jul 29, 2026 07:20 am EDT
-
Original Published Date: Jun 15, 2026 10:15 am EDT
-
Updated Date Offers Due: Jul 28, 2026 01:00 pm EDT
-
Original Date Offers Due: Jul 28, 2026 01:00 pm EDT
-
Inactive Policy: Manual
-
Updated Inactive Date: Jul 22, 2027
-
Original Inactive Date:
Jun 15, 2027
-
Initiative:
Classification
Description
Maintenance Dredging, Kennebec River, Kennebec Maine. The work involves maintenance dredging for the USN of three portions of the authorized, 27-foot deep, 500-foot wide FNP in the Lower Kennebec River. Dredging is required to meet the navigational requirements of newly constructed surface combatants being built and tested at Bath Iron Works (BIW). The proposed work consists of dredging approximately 80,000 cubic yards (cy) of clean sand (approximately 30,000 cy of required material and 50,000 cy of overdepth (OD) material). Approximately 61,000 cy of material will be removed from the Doubling Point area (i.e., just below Bath), and approximately 10,000 cy of material will be removed from the Popham Beach area (at the river mouth). In addition to the historically dredged sites, this proposed maintenance dredging includes dredging approximately 9,000 cy of material will be removed from Bath Reach (just below the Carlton Bridge and adjacent to BIW). As part of this proposal, maintenance dredging will be performed to remove the sand-waves in the vicinity of Doubling Point to an elevation of -32 feet MLLW +2 feet overdepth (OD) to improve the chance that adequate depths will endure. The 61,000 cy to be removed from the channel at Doubling Point includes dredging to an elevation of -32 feet MLLW +2 feet OD. Material dredged from the Bath Reach area and the Doubling Point area will be placed in the previously used in-river disposal area north of Bluff Head in about 45-90 feet of water. Material dredged from the Popham Beach area will be placed at a newly established nearshore placement site called Jackknife Ledge West Disposal Site, in about 45-30 feet of water. This site is just northwest of the previously used Jackknife Ledge placement site. The dredging and dredged material placement work is expected to take 3-4 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 December 2026 to 15 February 2027.
Attachments/Links
Contact Information
Contracting Office Address
-
KO CONTRACTING DIVISION 696 VIRGINIA ROAD
-
CONCORD , MA 01742-2751
-
USA
Secondary Point of Contact
History
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now
See Also
RFP 052027 Description Location: Pine Point Co-op, Scarborough River, Scarborough, Maine Environment: Saltwater,
Town of Scarborough, Maine
Bid Due: 8/20/2026
Bid Number: 04-27 Bid Title: Mahoney City Center Project Category: All Bids Status:
City of South Portland
Bid Due: 8/17/2026
Bid Number: 02-27 Bid Title: Broadway Pedestrian Improvements WIN 027356.00 Category: All Bids
City of South Portland
Bid Due: 8/20/2026
Bid Number: P26-20 Bid Title: Cumberland St, Sewer Separation and Water Main Replacement
City of Bangor
Bid Due: 5/13/2027