| Agency: | East Bay Municipal Utility District |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 18, 2024 |
| Due Date: | Oct 23, 2024 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
|
[Sign In] Current Construction Bid Opportunities |
| Title: | Main Wastewater Treatment Plant Oxygen Plant Rehabilitation |
| Specification Number: | SD428 |
| Bid Walk: |
Tuesday, July 30, 2024, 9:00 AM
The District will conduct a MANDATORY pre-bid jobsite conference/inspection to familiarize prospective bidders with the project site and conditions. Bidders submitting a bid must attend the pre-bid conference for their bid to be responsive. Attendees will be required to sign a waiver prior to entering the plant site. See Appendix A for waiver. The pre-bid meeting will be conducted on July 30, 2024 at 9:00 a.m. Bidders/bid walk attendees (Attendees) shall assemble at 2020 Wake Avenue, Oakland, California 94607. This is the only time that the Oxygen Plant will be open for inspection. The conference/inspection will last approximately 2 hours. No photography by the Attendees will be allowed. The District will take photographs, as requested by the Attendees, restricted to the work zone. The District will release photographs to Attendees after the bid walk, pending review by District. All Attendees are required to have a photo ID and sign a confidentiality agreement not to share, sell, or publish photos. The Prime Contractor and its subcontractors are strongly encouraged to attend the jobsite inspection where a "sign-in" sheet will be provided. Requirements of the District's Contract Equity Program, including the pilot Local Hire component, will be discussed and explained at the pre-bid meeting. |
| Project Engineer: | |
| Bid Opening Date: | Wednesday, October 23, 2024, 1:30 PM |
| Estimated Cost: | $9,000,000 to $10,000,000 |
| Description: | Work includes demolition and replacement of motors, valves, instruments, controls, and other appurtenances associated with the cryogenic oxygen production facility at East Bay Municipal Utility District's Main Wastewater Treatment Plant (MWWTP). Existing pneumatic controls will be replaced with new electronic instruments and controls. The work also includes re-coating of existing steel cold boxes, new controls, integration of controls into the MWWTP's distributed controls system (DCS), fire protection, fall protection, seismic retrofit of panels, and all materials, equipment, services, and construction inherent to the Work. |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow GAOA Housing Facility Upgrades Active Contract Opportunity Notice ID 127EAW26Q0027 Related Notice
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/16/2026
EXT REC | CON26-0001 Marina Dredging - SF First Format : Sell |
City and County of San Francisco
Bid Due: 12/31/2026
Bid Number: 23-206 Addendum No. 1 Bid Title: Sanger HSP Cycle 11 Project
Sanger city
Type Title Deadline Status Notice Berth 24 Backlands Redevelopment Project 06/22/2026 until 12:00
Port of Oakland
Bid Due: 6/22/2026