Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027) - CIP No. 60177
| Agency: | City of Tustin |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 9, 2026 |
| Due Date: | Sep 15, 2026 |
| Solicitation No: | CIP No. 60177 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: CIP No. 60177
Title: Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027) - CIP No. 60177
Addenda: 0
Release Date: 8/7/2026
Due Date: 9/15/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
NOTICE IS HEREBY GIVEN that the CITY OF TUSTIN, hereinafter referred to as City or AGENCY invites sealed bids for the above stated project and will receive sealed bids for the construction, materials, supplies, equipment and/or services set forth herein, subject to all conditions outlined in the Bid Package.
Scope of Work: The Work encompassed by the Project is more specifically defined in the Contract Documents, but in general consists of, but is not limited to the following Work:
Main Street Well #3:
- Perform pre-removal testing and document existing pump and motor operating conditions.
- Remove, transport, inspect, test, and evaluate the existing pump and motor; submit condition-assessment reports.
- Perform downhole video inspection and submit well-condition assessment report.
- Convert the existing oil-lubricated lineshaft system to a continuous water-lubricated configuration, where indicated and authorized.
- Perform brushing, bailing, chemical treatment, dual-swab airlifting, redevelopment, and related well rehabilitation only when authorized by the City based on inspection results.
- Rehabilitate, rewind, reinstall, or replace the existing pump and/or motor as authorized by the City.
- Reinstall the approved rehabilitated or replacement pump and motor and provide a complete operational pumping system.
- Perform startup, performance, vibration, electrical, operational testing, flushing, disinfection, and post-rehabilitation inspection where required.
- Restore disturbed areas and complete closeout requirements.
Newport Well #3:
- Perform pre-removal testing and document existing pump and motor operating conditions.
- Remove, transport, inspect, test, and evaluate the existing pump and motor; submit condition-assessment reports.
- Perform downhole video inspection and noninvasive electromagnetic casing-thickness/integrity analysis; submit well-condition assessment report.
- Because Newport Well No. 3 is considered fragile, perform well cleaning, redevelopment, casing repair, or other downhole rehabilitation only when specifically authorized by the City.
- Rehabilitate, rewind, reinstall, or replace the existing pump and/or motor as authorized by the City.
- Install new magnetic flow meter and MOV on the waste-discharge piping.
- Remove and replace the existing magnetic flow meter and MOV on the system-discharge piping.
- Remove existing electrical equipment as needed and furnish/install new electrical, controls, instrumentation, PLC, and SCADA work where required.
- Reinstall the approved rehabilitated or replacement pump and motor and provide a complete operational pumping system.
- Perform startup, performance, vibration, electrical, operational testing, flushing, disinfection, meter/MOV testing, and post-work inspection where required.
- Restore disturbed areas and complete closeout requirements.
Background
Project Schedule (contract days): 150 Days
Engineer’s Estimate: $ 775,000
Liquidated Damages: $ 1,000 Per Day
Bid Valid (calendar days): 60 Days
Contractor's License(s): Class A
Timeline
See Also
Post Date 11/02/2026 Quest Number 10426124 Category Code Commercial Entrances Storefront Steel/Aluminum,Concrete/Formed/Flatwork/Foundation,Construction,Lamp/Lighting Interior/Exterior,Lighting
City of Atascadero
Due by 11/19/2026
Project ID: Title: Katella Ave & State College Blvd Rehabilitation Project Addenda: 1
City of Anaheim
Due by 11/12/2026
Joint Outfall A Unit 3C Trunk Sewer Protection Between Manholes A38 and A39
Los Angeles County Sanitation Districts
Due by 12/01/2026
Project Summary Project ID: TDS0001709 Federal No: HSIPL 5953(759) Project Name: San Gabriel
La County
Due by 11/24/2026