MACH1_AOI_Muns_Igloos at Dyess AFB - LOE 1 and LOE 2
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Texas |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Aug 21, 2026 |
| Due Date: | Sep 9, 2026 |
| Solicitation No: | FA8903-26-OT003 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
- Contract Opportunity Type: Special Notice (Original)
- Original Published Date: Aug 21, 2026 04:26 pm CDT
- Original Response Date: Sep 09, 2026 10:00 am CDT
- Inactive Policy: Manual
- Original Inactive Date: Sep 10, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code:
- NAICS Code:
-
Place of Performance:
Dyess AFB , TXUSA
This Area of Interest (AOI) is published under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice. All submissions must adhere to the procedures and guidelines outlined in the parent MACH1 framework document unless otherwise tailored herein. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the statutory authority of 10 U.S.C. § 2808a.
The 772nd Enterprise Sourcing Squadron (772 ESS) is seeking innovative commercial design and engineering partners to develop a comprehensive, site-specific design package for rapidly deployable Earth-Covered Munitions (ECM) storage facilities at Dyess AFB, Texas.
The Government requires rapidly deployable Class V munitions storage facilities to support evolving global threats and warfighter readiness. Traditional MILCON processes and standard ECM build face structural and procedural bottlenecks—ranging from slow curing times to complex bespoke formwork—that prevent rapid deployment. This AOI seeks architectural and engineering innovations that bypass these traditional bottlenecks.
The Government is looking for design concepts incorporating advanced formwork, rapid-curing materials, modular structural arches, or other commercial methodologies that accelerate the timeline while fully maintaining all required blast resistance, structural integrity, and environmental controls.
There are (2) two lines of effort (LOEs) for this requirement: LOE 1 - Design & Planning (Design) and LOE 2 - Physical Construction.
See attachment PDF: MACH1_AOI_FA890326OT003_Muns_Igloos_Dyess_ 21 Aug 26.pdf
- CP 210 395 8776 2261 HUGHES AVE BLDG 171 STE 163
- JBSA LACKLAND , TX 78236-9861
- USA
- 772 ESS/PKA
- 772ESS.PKA.MACH1@us.af.mil
- Aug 21, 2026 04:26 pm CDTSpecial Notice (Original)
Related Document
| Aug 25, 2026 | [Presolicitation (Original)] MACH1_AOI_Muns_Igloos at Dyess AFB - LOE 1 and LOE 2_Amend 1 |
| Sep 2, 2026 | [Presolicitation (Updated)] MACH1_AOI_Muns_Igloos at Dyess AFB - LOE 1 and LOE 2_Amend 1 |
See Also
Project: Rebuild Miscellaneous Electronic Rail Propulsion Components Ref. #: 2092448 Type: IFB Status:
Dallas Area Rapid Transit
Due by 10/29/2026