| Agency: | UCLA Capital Programs |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 25, 2024 |
| Due Date: | Nov 22, 2024 |
| Solicitation No: | 907084.01 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Project Name | Macgowan 1300 Theater Renovation |
| Project Number | 907084.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited from Prequalified Bidders for the following work:
The project consists of the renovation of existing theater room 1330, adjacent offices room 1306, restrooms room 1316 and 1318 and corridor totaling 3,500 assignable square feet (asf) located on the 1st floor, west wing, of Macgowan Hall. The remodeled spaces will provide a newly designed theater space that will include a larger stage platform, a backstage area adjacent to the stage, and a full refresh of both the men’s and women’s restrooms. In addition, a new sprinkler main will be brought in to the building, a corridor shall be refreshed, and an existing HVAC mechanical unit shall be replaced. Theater scope includes the provision of new ductwork, lighting and controls, fire sprinklers, fire alarm devices, A/V and theatrical lighting equipment, stage curtains, new wall and ceiling finishes including acoustical treatment, new flooring, and a technical booth. Restroom scope includes the provision of new floor and wall tile, ceiling finishes, lighting and controls, new plumbing fixtures, partitions, fire sprinkler and fire alarm. Corridor scope includes the provision of T-bar ceiling finishes, lighting and controls, new fire sprinkler main, fire sprinklers, fire alarm devices, and all new flooring and base as an add alternate. HVAC unit scope will include the provision of a new roof-top HVAC unit, including controls and supporting duct work connections to the theater and Restrooms and surrounding performances spaces. Fire Sprinkler scope includes bringing sprinkler service to the building from the street and the connection to the new fire sprinkler main and sprinkler systems included in the corridor, theater and restroom scopes of work. Hazardous materials abatement will be required per contract documents. The project will be divided into two phases. Phase 2 shall begin on March 17, 2025, to correspond to the start of Spring Break. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $5,100,000.00 |
| 943984.01 |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow SLAC Sector 30 Erosion Mitigation Project Active Contract Opportunity Notice ID SLAC_RFP_365203
ENERGY, DEPARTMENT OF
Bid Due: 6/18/2026
Follow Sources Sought - Paintings & Coatings IDIQ - Edwards AFB Active Contract
DEPT OF DEFENSE
Bid Due: 6/26/2026
Project ID: Title: HCTP Cleanout and Clarifier Beach Repairs Project (MI 2646) Addenda:
City of Thousand Oaks
Bid Due: 6/24/2026
C5613245-D, Rebid 1 Synthetic Turf InstallationDetails Event ID 0000039519 Format/Type: Sell Event /
State Government of California
Bid Due: 7/14/2026