M--TRAIL BRIDGE BLACKLAND PRAIRIE
| Agency: | INTERIOR, DEPARTMENT OF THE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Jul 16, 2025 |
| Due Date: | Jul 17, 2025 |
| Solicitation No: | 140P5225R0018 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Jul 16, 2025 11:28 am CDT
- Original Published Date: Jul 01, 2025 11:51 am CDT
- Updated Date Offers Due: Jul 17, 2025 02:00 pm CDT
- Original Date Offers Due: Jul 15, 2025 02:00 pm CDT
- Inactive Policy: Manual
- Updated Inactive Date: Jul 16, 2026
- Original Inactive Date: Jul 07, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: M1LB - OPERATION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
One question, I noticed the highlighted area regarding delegated design on pdf page 2. Does this mean that minor design details can be delegated to the contractor? The delegated design would be for the pre-fabricated bridges. Those are the only elements that are not ¿designed¿ since they will be built by a manufacturer.
Can the diaphragms be bolted instead of welded to the girders? Yes they can.
Does the diaphragm connection bracket need to be on both sides of the diaphragm in addition to each end of the diaphragm? Yes
Do the bearing plates need to be welded to the girders? Yes they do.
Do the hardware, girders, bearing plates, diaphragms, nailer angle need to be coated in any way? It would be best if they were to minimize corrosion over time. They can be galvanization (zinc coated), epoxy coated, or powder coated
Do we need to include the steel angle nailer bracket if so please provide the spacing? The nailers are spaced a maximum of 5¿ oc along the length of the bridge. They can be less than 5¿ to allow for them to be evenly spaced along the length.
Would these minor design alterations fall within that delegated design? Or should we maintain no deviation from the design we have now? Typically, not. It would be best to maintain no deviation from the plans
- 2680 NATCHEZ TRACE PARKWAY
- TUPELO , MS 38804
- USA
- Clark, Tara
- Tara_Clark@nps.gov
- Phone Number 6623720363
- Jul 16, 2025 11:28 am CDTCombined Synopsis/Solicitation (Updated)
- Jul 02, 2025 05:39 pm CDT Combined Synopsis/Solicitation (Updated)
- Jul 01, 2025 11:51 am CDT Combined Synopsis/Solicitation (Original)
Related Document
| Jul 1, 2025 | [Combined Synopsis/Solicitation (Original)] TRAIL BRIDGE BLACKLAND PRAIRIE |
| Jul 2, 2025 | [Combined Synopsis/Solicitation (Updated)] M--TRAIL BRIDGE BLACKLAND PRAIRIE |
See Also
Follow M--HAFC HAFE OUTDOOR TACTILE MAPS Active Contract Opportunity Notice ID 140P2126R0028 Related
INTERIOR, DEPARTMENT OF THE
Due by 9/17/2026
Follow Two (2) Line Handlers for NOAA Ship Fairweather Active Contract Opportunity Notice
COMMERCE, DEPARTMENT OF
Due by 9/21/2026
Follow Caesar Creek Lake Overhead Crane Wheel Bearing Repair and Replace Active Contract
DEPT OF DEFENSE
Due by 9/17/2026
Follow OPERATION AND MAINTENANCE OF YDP, IDIQ Active Contract Opportunity Notice ID 140R3026R0012
INTERIOR, DEPARTMENT OF THE
Due by 10/07/2026