Lyons - Park Lighting RFP

Agency: State Government of Georgia
State: Georgia
Type of Government: State & Local
Posted Date: Apr 13, 2026
Due Date: May 15, 2026
Solicitation No: PE-73852-NONST-2026-000000018
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-73852-NONST-2026-000000018 Lyons - Park Lighting RFP Lyons, City Of
Apr 13, 2026 @ 04:14 PM
May 15, 2026 @ 12:00 PM
Lyons - Park Lighting RFP

Start Date: Apr 13, 2026 @ 04:14 PM ET

End Date:
May 15, 2026 @ 12:00 PM ET

Event ID: PE-73852-NONST-2026-000000018
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Services / Special Projects
Government Type: city
Fiscal Year: 2026


Description


The City of Lyons is soliciting bid proposals from experienced and qualified Contractors for the furnishing and installation of a comprehensive lighting system for Partin Park and Faison Park. This project includes the replacement of athletic field and court lighting, poles, and controls across multiple areas.

NIGP Codes
Code Description
93153 Lighting Fixtures Maintenance and Repair
98854 Lighting Services for Parks, Athletic Fields, Parking Lots, etc.
80573 Stadium Lighting Equipment and Light Poles (See Class 285 for Lamps)
BuyerContact:

JamieLynn Harris
jamielynn@hofstadter.com

4787571169

Attachment Preview

REQUEST FOR PROPOSAL: ATHLETIC FIELD AND COURT LIGHTING INSTALLATION
The City of Lyons is soliciting bid proposals from experienced and qualified Contractors for the
furnishing and installation of a comprehensive lighting system for Partin Park and Faison Park.
This project includes the replacement of athletic field and court lighting, poles, and controls
across multiple areas.
BID SUBMISSION
* Method: Proposals must be submitted via email only to Hayes Hofstadter at
hayes@hofstadter.com AND jamielynn@hofstadter.com clearly labeled as "RFP for
Lyons Park Lighting"
* Deadline: Proposals must be received by 12:00 PM local time on May 15, 2026.
* Responsibility: The party submitting the bid is solely responsible for ensuring the email
delivery is completed by the time stated.
PROJECT OVERVIEW
Primary Objective: Establish the performance and installation criteria necessary for a lighting
system that is safe for players, enjoyable for spectators, respectful to neighbors, and includes
the security of a long-term performance warranty.
Quality Assurance: The manufacturer shall have a minimum of 10 years of experience in the
design and fabrication of sports lighting systems that meet the required type and performance
criteria. The proposal shall include a list of 10 LED sports lighting installation references located
within the state of Georgia. References shall include the type of LED fixture proposed for this
project.
City of Lyons Lighting Proposal - Faison Park 1 | Pa ge

Max Uniformity
Field / Area of Avg Target
Grid Points Grid Spacing
Lighting Illumination Levels
Ratio
Partin Park - Field 3 30FC Infield 20FC Outfield 2.5:1.0 Infield 3.0:1.0 Outfield 25 Infield 75 Outfield 20' x 20'
Partin Park - Field 4 30FC Infield 20FC Outfield 2.5:1.0 Infield 3.0:1.0 Outfield 25 Infield 49 Outfield 20' x 20'
Faison Park - Soccer Field 1 30FC 2.5:1.0 54 30' x 30'
Faison Park - Soccer Field 2 30FC 2.5:1.0 54 30' x 30'
Faison Park - Soccer Field 3 30FC 2.5:1.0 96 30' x 30'
Faison Park - Pickleball Courts 30FC 2.5:1.0 36 10' x 10'
Faison Park - Basketball Courts 30FC 2.5:1.0 45 10' x 10'

Playability: The lighting design shall comply with the latest version of ANSI/IES RP-6
Recommended Illuminance Criteria for Sports and Recreational Areas based on the designated
class of play. The following parameters shall be included:
Max Uniformity
Field / Area of Avg Target
Grid Points Grid Spacing
Lighting Illumination Levels
Ratio
30FC Infield 2.5:1.0 Infield 25 Infield
Partin Park -
20' x 20'
Field 3
20FC Outfield 3.0:1.0 Outfield 75 Outfield
30FC Infield 2.5:1.0 Infield 25 Infield
Partin Park -
20' x 20'
Field 4
20FC Outfield 3.0:1.0 Outfield 49 Outfield
Faison Park -
30FC 2.5:1.0 54 30' x 30'
Soccer Field 1
Faison Park -
30FC 2.5:1.0 54 30' x 30'
Soccer Field 2
Faison Park -
30FC 2.5:1.0 96 30' x 30'
Soccer Field 3
Faison Park -
30FC 2.5:1.0 36 10' x 10'
Pickleball Courts
Faison Park -
30FC 2.5:1.0 45 10' x 10'
Basketball Courts
1. Color Temperature: The lighting system shall have a color temperature of 5700K
and minimum CRI of 75.
2. Vertical Illumination: Provide adequate illumination above the field to allow
visibility of the ball in flight on all Baseball/Softball Fields.
3. Pole Heights: Pole height minimum requirements to achieve optimal control of spill
and glare.
City of Lyons Lighting Proposal - Faison Park 2 | Pa ge

Location and # of Pole Designation Pole Height
Poles
Partin Park (4) A5, A6, B7, B8 50'
Partin Park (1) A4 60'
Partin Park (3) B4, B5, B6 70'
Faison Park (6) S1, S2, S3, S4, S5, S6 50'
Faison Park (4) S7, S8, S9, S10 70'
Faison Park (5) P1, P2, BB1, BB2, BB3 40'

Location and # of
Pole Designation Pole Height
Poles
Partin Park (4) A5, A6, B7, B8 50'
Partin Park (1) A4 60'
Partin Park (3) B4, B5, B6 70'
Faison Park (6) S1, S2, S3, S4, S5, S6 50'
Faison Park (4) S7, S8, S9, S10 70'
Faison Park (5) P1, P2, BB1, BB2, BB3 40'
4. Beam Type Restriction: To minimize player glare, NEMA beam types 1-3 shall not
be used on the field of play.
5. Player glare limits (Baseball/Softball Fields):
a. Home plate: Player glare shall not exceed 1,000 cd from any outfield pole
fixture.
b. Outfield positions (LF, CF, RF): Glare shall not exceed 4,500 cd from any A-pole
fixture.
Light Pollution & Glare Control:
1. Lighting Ordinances: Lighting design must meet all local lighting ordinance criteria.
2. Offsite Glare: Maximum candela shall not exceed 6,000 cd measured 150 feet from
perimeter of field 5 feet above grade.
Warranty: 25-year parts and labor warranty is required, covering equipment rental, shipping,
and guaranteed light levels.
Maintenance Design: Drivers, fuses, and other electronic components shall be housed in an
aluminum enclosure no higher than 10 feet above grade, accessible via step ladder.
Control & Monitoring: The system shall provide remote control, monitoring, and scheduling
capabilities. The system shall be accessible 24/7 through a website, phone app, or call center.
Fields must be proactively monitored to detect luminaire outages. All subscription costs during
the warranty period shall be included.
City of Lyons Lighting Proposal - Faison Park 3 | Pa ge

Management Tools: An online dashboard shall be included to report usage metrics and system
health.
Structural Design: Manufacturer shall provide steel poles with pre-stressed concrete base or an
anchor bolt foundation embedded in concrete backfill. Direct bury steel (including concrete
encased), hinged, and wood are not permitted. Manufacturer shall design foundation based on
Geotechnical report parameters. If there is no Geotechnical report, design shall use Class 5 soil
standards per IBC 2024.
Electrical Design: Electrical control shall use contactor switching rather than dimming drivers.
Include 50 kA surge protection per pole per ground line. All wiring shall be fully enclosed. The
system must be UL listed, or internal wiring shall be enclosed in raceway per NEC.
Installation Requirements: Contractor shall provide all labor, materials, and equipment needed
for a complete operational system, including:
1. Contractor furnished materials and labor: The electrical contractor shall provide and
install all equipment necessary to provide a complete operational sports lighting facility.
Items to be provided and installed by the contractor include, but shall not be strictly
limited to the following:
a. Electrical wire (Copper).
b. Electrical conduit shall be provided.
c. All labor and materials necessary to install new electrical service panels and
circuits from utility provided transformer(s).
d. All labor and materials necessary to install contactors and controls.
e. No more than two poles will be on a single lighting circuit.
2. ELECTRICAL DISTRIBUTION SYSTEM
a. Electrical contractor shall provide as-built electrical drawings with final close out
documents.
b. All electrical work shall conform to the current edition of the National Electric
Code.
c. The electrical service shall be rated at least 12% of calculated KA load. Panel
boards shall be rated for service entrance; NEMA 3R (Outdoor) and each shall
include a main breaker. All branch breakers shall be bolt types.
City of Lyons Lighting Proposal - Faison Park 4 | Pa ge

d. All wiring shall remain underground before entering the base of the pole and no
wiring shall be exposed to sun or weather as it transitions through the pole and
to the electrical enclosure.
e. No trench line or branch circuit shall cross the playing area. Branch circuits shall
be all copper wires in conduit. Wiring in conduit shall be THHN or THWN copper
wire.
f. All wiring shall be new.
g. All conduits above grade shall be rigid galvanized steel.
h. Each branch circuit will have a dedicated contactor.
i. Electrical switch gear installed outdoors will be housed on a frame constructed
from 3" galvanized angle iron with hardware that is either stainless steel or hot
dipped galvanized.
j. The installing contractor shall be responsible for locating all underground utilities
including, but not limited to, natural gas, electric, water, sewer, cable TV and
telephone.
k. The Owner shall be responsible for locating and staking any underground
facilities that are not utility related.
l. Trenching depth and width shall be adequate to install appropriately sized
conduit and to meet local and National Electrical Codes.
m. Trenches shall be back-filled with excavated soil and compacted to approximately
the same density of the surrounding soil to minimize settlement.
n. The contractor shall obtain and pay for all permits and inspections required by
the building and safety code and ordinances and the rules and regulations of any
legal body having jurisdiction.
Site Visit: All contractors must visit the site prior to submission. Site familiarity is required.
Submittals: Proposals must include a photometric lighting design reflecting all specified values.
The Owner / engineer will review bid submittals from all the manufacturers to ensure
compliance to the specification. Proposals that do not include all necessary information to
support specified values will be disqualified.
City of Lyons Lighting Proposal - Faison Park 5 | Pa ge

Evaluation Criteria: Max Score
Proposed Approach & Timeline 30
Experience & Qualifications 20
References 20
Cost Proposal 30
Total 100

EVALUATION CRITERIA: The proposal evaluation will be made on the following criteria:
Evaluation Criteria: Max Score
Proposed Approach & Timeline 30
Experience & Qualifications 20
References 20
Cost Proposal 30
Total 100
Proposed Approach & Timeline - Evidence of thorough understanding of the project, quality
and detail of the proposed approaches to the completion of the required tasks. Evidence of
consultant team's capacity and availability to perform the services outlined in the scope of work
Experience & Qualifications - Experience and qualifications of the team personnel, as
demonstrated by resumes, organizational chart, and other information provided. Experience of
the team in executing successful and relevant projects including other city-wide safety action
plans.
References - Quality and relevance of references, as well as responsiveness of references
contacted by City staff
Cost Proposal- The cost proposal will not factor into the committee's evaluation of the
technical proposal. Scores will be determined by weights assigned based on proposed cost.
Item Unit Total
No. Qty. Unit Description Price Price
1005 1LS Partin Park Field 1 $ $
1010 1LS Partin Park Field 2 $ $
1015 1LS Faison Field 1 Soccer $ $
1020 1LS Faison Field 2 Soccer $ $
1025 1LS Faison Field 3 Basketball $ $
1030 1LS Faison Field 4 Pickleball $ $
Total Construction Section 1000 $
City of Lyons Lighting Proposal - Faison Park 6 | Pa ge

This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Event ID Event Title Government Entity Start Date (ET) End Date (ET) 53900-eRFP-002004-2027

State Government of Georgia

Due by 10/06/2026

27-104 Light Fleet Parts & Supplies Available Date: 9/11/2026 Due Date: 10/1/2026 no

https://www.augustaga.gov/

Due by 10/01/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.