LTUY242011 Repair West Base Backflow Preventer
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Missouri |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Feb 26, 2025 |
| Due Date: | Mar 6, 2025 |
| Solicitation No: | W50S8K25QA002 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Feb 26, 2025 04:42 pm CST
- Original Published Date: Jan 31, 2025 02:48 pm CST
- Updated Date Offers Due: Mar 06, 2025 04:30 pm CST
- Original Date Offers Due: Mar 06, 2025 04:30 pm CST
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Mar 21, 2025
- Original Inactive Date: Mar 21, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2NZ - REPAIR OR ALTERATION OF OTHER UTILITIES
-
NAICS Code:
- 237110 - Water and Sewer Line and Related Structures Construction
-
Place of Performance:
Saint Louis , MO 63125USA
The contractor shall furnish all labor, equipment, and tools necessary to perform the repair work for the replacement of the existing backflow preventer assembly. The backflow preventer assembly has failed the St. Louis County annual testing and needs to be replaced. The existing backflow preventer is in a below ground level valve pit/vault and is located in the West Parade Field of Jefferson Barracks Air National Guard Station (JB ANGS). This is one of two (2) backflow prevention assembly systems for the domestic water service at JB ANGS. See attached Statement of Work for details.
An organized site visit has been scheduled for 20 February 2025 at 1:00 PM local. Interested contractors MUST register no later than 13 February 2025 at 5:00 PM local time in order to be cleared through Base Security. See Section L starting on page 35 for more information.
In accordance with FAR 36.211(b), the following information is provided:
(1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
(2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor’s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see “History” section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update 9 February 2025: Amendment 1 correcting solicitation administrative errors added to attachments.
Update 21 February 2025: Pre-quote site visit sign-in sheet added to attachments.
Update 26 February 2025: Amendment 2 with revised SOW and updated wage determination along with responses to pre-award Requests for Information added to attachments.
- KO FOR MOANG DO NOT DELETE 29 SHERMAN AVENUE
- SAINT LOUIS , MO 63125-4117
- USA
- MSgt Joe Bernier
- joseph.bernier.1@us.af.mil
- Phone Number 3145278033
- Feb 26, 2025 04:42 pm CSTSolicitation (Updated)
- Feb 21, 2025 10:02 am CST Solicitation (Updated)
- Feb 09, 2025 04:40 pm CST Solicitation (Updated)
- Jan 31, 2025 02:48 pm CST Solicitation (Original)
- Jan 16, 2025 03:02 pm CST Presolicitation (Original)
Related Document
| Jan 16, 2025 | [Presolicitation (Original)] LTUY242011 Repair West Base Backflow Preventer |
| Jan 31, 2025 | [Solicitation (Original)] LTUY242011 Repair West Base Backflow Preventer |
| Feb 9, 2025 | [Solicitation (Updated)] LTUY242011 Repair West Base Backflow Preventer |
| Feb 21, 2025 | [Solicitation (Updated)] LTUY242011 Repair West Base Backflow Preventer |
See Also
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded
State Government of Missouri
Due by 9/29/2026
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded
State Government of Missouri
Due by 10/13/2026
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded
State Government of Missouri
Due by 10/08/2026
Rotary Park Connectivity Project Posted: Aug 27 The City of Kirksville will accept
City of Kirksville
Due by 10/01/2026