LPSB - 2024 Bond New Classroom Addition for Choudrant Elementary School and New Cheer/Weight Room Building for...
|
Title:
|
|
|
Ends:
|
27-Mar-2025 2:00:00 PM CDT
|
Listing Information/Advertisement:
-
Work at Choudrant Elementary School consists of the construction of a new classroom building connected to the south end of the existing building by a concrete walk and aluminum canopy. Due to the site’s potential for wet conditions during much of the year, the School Board bid a pre-foundation pad and site access drive in September 2024. This work was done by Murphy Brothers of Arcadia. The select fill was tested by a lab in 8” lifts during installation to assure proper compaction. The contours on the plans represent the grades at the time of completion of this work in October 2024. The contractor shall visit the job site and assess This work includes a building pad, dirt work and access road work has been completed (major portion) under a separate bid. The drainage, concrete walks, concrete foundation, aluminum canopy, brick veneer/CMU block walls, Pre-engineered wood trusses, fiberglass shingles, soffit panels, drywall systems, building insulation, finish carpentry, hollow metal doors, finish hardware, glazing, lay-in ceiling, paint, electrical, mechanical, and other systems as described in the contract documents. This building will also include a Tornado Shelter area with rated doors frames, reinforced concrete block walls and reinforced concrete roof on metal deck and steel joists. Coordinate work with the School, so that Owner will have use of adjacent buildings and playgrounds during construction.
-
Work at Choudrant High School consists of the construction of a new spirit/weight room building. This work includes a building pad, dirtwork, concrete walk, concrete foundation, metal building, metal liner panels, drywall systems, aluminum overhangs, hollow metal doors, building insulation, paint, electrical, mechanical, and other systems as described in the contract documents. Coordinate all work with the School.
Additional Notes/Requirements
A Pre-Bid Conference will be held at 8:30 a.m. local time on Thursday, March 13, 2025, in
front of Choudrant Elementary’s main Lobby at 160 Walker Road in Choudrant, Louisiana.
Owner Telephone (318) 255-1430 and Fax (318)255-3203. Representatives from the
OWNER and ARCHITECT will be present to discuss the Project. Bidders are
encouraged to attend and participate in the conference.
SUBMITTAL INFORMATION
|
Creator Username:
|
MWArchitect
|
|
Bidding Privacy:
|
Bid encryption
|
|
Started:
|
19-Feb-2025 1:00:00 PM CST
|
|
Ends:
|
27-Mar-2025 2:00:00 PM CDT ( 35d, 18h+ )
|
|
History:
|
6 Views, 0 Messages
|
|
Event Status:
|
Event open for bids
|
|
Actions:
|
Sign-In to Bid
|
|
Visitors:
|
Visitors/Central Bidding Plan Holders
|
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now
See Also
Bid Number Description Date Issued Bid Open Date/Time 123457-SB1862 ANNA T. JORDAN COMMUNITY
State Government of Louisiana
Bid Due: 6/30/2026
ITB 26-FAC-0076 Roof Replacement at Ellis L. Marsalis Jr. School (6.3.26) New! 370.21
NOLA Public Schools
Bid Due: 7/07/2026
WATER MAIN REPLACEMENTS AND EXTENSIONS AT SCATTERD LOCATIONS THROUGHOUT ORLEANS PARISH Contract #:
Sewerage and Water Board of New Orleans
Bid Due: 7/08/2026
Follow GIWW ? Gulf Intracoastal Waterway, Algiers Lock, New Maintenance Building, Orleans Parish,
DEPT OF DEFENSE
Bid Due: 7/14/2026