Lonerider Bid Documents

Agency: Raleigh-Durham Airport Authority
State: North Carolina
Type of Government: State & Local
Posted Date: Jul 29, 2026
Due Date: Sep 8, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Lonerider Bid Documents

Attachment Preview

RALEIGH DURHAM AIRPORT AUTHORITY
PROJECT SPECIFICATION
CONCESSIONS - PHASE 2
LONERIDER
Project No. 331070
JULY 20, 2026
PREPARED BY:
RALEIGH DURHAM AIRPORT AUTHORITY | GENSLER
Raleigh-Durham Airport Authority Project
Management
Office
1000 Trade Drive
PO Box 80001
RDU Airport, NC 27623
Refer All Inquiries to:
Authority's Point of Contact:
Carrie E. Blevins
Director | Buildings and Building Systems
Carrie.Blevins@rdu.com

Gensler July 20, 2026 RDU
090.4000.017 ISSUE FOR BID Concessions - Phase 2
Morrisville, North Carolina
TABLE OF CONTENTS
RALEIGH DURHAM AIRPORT AUTHORITY
REFER TO OWNER PROVIDED DOCUMENT FOR SPECIAL CONDITIONS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 60 00 - PROJECT FORMS (REFER TO EXHIBIT 2 - SPECIAL CONDITIONS)
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 23 00 - ALTERNATES
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
SECTION 01 60 00 - PRODUCT REQUIREMENTS
SECTION 01 73 00 - EXECUTION
SECTION 01 73 29 - CUTTING AND PATCHING
SECTION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 01 77 00 - CLOSEOUT PROCEDURES (REFER TO EXHIBIT 2 - SPECIAL CONDITIONS)
SECTION 01 81 33 - SUSTAINABLE DESIGN REQUIREMENTS - EMBODIED CARBON
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 41 19 - SELECTIVE DEMOLITION
DIVISION 03 - CONCRETE
SECTION 03 54 16 - HYDRAULIC CEMENT UNDERLAYMENT
DIVISION 04 - MASONRY
SECTION 04 26 13 - MASONRY VENEER
DIVISION 05 - METALS
SECTION 05 50 00 - METAL FABRICATIONS
SECTION 05 70 00 - DECORATIVE METAL
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
SECTION 06 10 53 - MISCELLANEOUS ROUGH CARPENTRY
SECTION 06 16 00 - SHEATHING
SECTION 06 40 23 - INTERIOR ARCHITECTURAL WOODWORK
SECTION 06 65 00 - PLASTIC PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 01 80 - RETROFIT FIRE-RESISTIVE MATERIALS
SECTION 07 81 00 - APPLIED FIREPROOFING
SECTION 07 84 13 - PENETRATION FIRESTOPPING
SECTION 07 84 43 - JOINT FIRESTOPPING
Table of Contents TOC - 1
Copyright 2026 Gensler

Gensler July 20, 2026 RDU
090.4000.017 ISSUE FOR BID Concessions - Phase 2
Morrisville, North Carolina
SECTION 07 92 00 - JOINT SEALANTS
DIVISION 08 - OPENINGS
SECTION 08 11 13 - HOLLOW METAL DOORS AND FRAMES
SECTION 08 12 16 - ALUMINUM FRAMES
SECTION 08 31 13 - ACCESS DOORS AND FRAMES
SECTION 08 33 26 - OVERHEAD COILING GRILLES
SECTION 08 71 00 - DOOR HARDWARE
SECTION 08 80 00 - GLAZING
SECTION 08 81 13 - DECORATIVE GLASS GLAZING
SECTION 08 83 00 - MIRRORS
DIVISION 09 - FINISHES
SECTION 09 22 16 - NON-STRUCTURAL METAL FRAMING
SECTION 09 26 13 - GYPSUM VENEER PLASTERING
SECTION 09 29 00 - GYPSUM BOARD
SECTION 09 30 13 - CERAMIC TILING
SECTION 09 30 33 - STONE TILING
SECTION 09 51 13 - ACOUSTICAL PANEL CEILINGS
SECTION 09 60 00 - INTERIOR STONEWORK
SECTION 09 64 00 - WOOD FLOORING
SECTION 09 65 13 - RESILIENT WALL BASE AND ACCESSORIES
SECTION 09 65 16 - RESILIENT SHEET FLOORING
SECTION 09 65 19 - RESILIENT TILE FLOORING
SECTION 09 65 36 - STATIC-CONTROL RESILIENT FLOORING
SECTION 09 67 23 - RESINOUS FLOORING
SECTION 09 72 00 - WALL COVERINGS
SECTION 09 75 00 - STONE FACING
SECTION 09 77 23 - FABRIC-WRAPPED PANELS
SECTION 09 91 23 - INTERIOR PAINTING
SECTION 09 96 11 - HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
SECTION 10 26 00 - WALL AND DOOR PROTECTION
SECTION 10 44 00 - FIRE-PROTECTION SPECIALTIES
DIVISION 11 - EQUIPMENT
SECTION 11 40 00 - FOODSERVICE EQUIPMENT
DIVISION 12 - FURNISHINGS
SECTION 12 22 00 - DRAPERIES
SECTION 12 24 13 - ROLLER WINDOW SHADES
DIVISIONS 13 - 14
Table of Contents TOC - 2
Copyright 2026 Gensler

Gensler July 20, 2026 RDU
090.4000.017 ISSUE FOR BID Concessions - Phase 2
Morrisville, North Carolina
NOT APPLICABLE
DIVISION 21 - FIRE SUPPRESSION (ENGINEERING DESIGN INC.
SECTION 21 05 00 - COMMON WORK RESULTS FOR FIRE SUPPRESSION
SECTION 21 05 23 - GENERAL DUTY VALVES FOR WATER BASED FIRE SUPPRESSION
SECTION 21 05 29 - HANGERS AND SUPPORTS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
SECTION 21 05 53 - IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT
SECTION 21 13 13 - WET-PIPE SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING (ENGINEERING DESIGN INC.)
SECTION 22 05 00 - COMMON WORK RESULTS FOR PLUMBING
SECTION 22 05 23.12 - BALL VALVES FOR PLUMBING PIPING
SECTION 22 05 23.14 - CHECK VALVES FOR PLUMBING PIPING
SECTION 22 05 29 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 22 05 53 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 22 07 19 - PLUMBING PIPING INSULATION
SECTION 22 11 16 - DOMESTIC WATER PIPING
SECTION 22 11 19 - DOMESTIC WATER PIPING SPECIALTIES
SECTION 22 11 23 - DOMESTIC WATER PUMPS
SECTION 22 13 16 - SANITARY WASTE AND VENT PIPING
SECTION 22 13 19 - SANITARY WASTE PIPING SPECIALTIES
SECTION 22 13 19.13 - SANITARY DRAINS
SECTION 22 33 00 - ELECTRIC, DOMESTIC-WATER HEATERS
SECTION 22 42 16.16 - COMMERCIAL SINKS
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING(HVAC)
[ENGINEERING DESIGN, INC.]
SECTION 23 05 13 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
SECTION 23 05 17 - SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
SECTION 23 05 23 - GENERAL-DUTY VALVES FOR HVAC PIPING
SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 48.13 - VIBRATION CONTROLS FOR HVAC
SECTION 23 05 53 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
SECTION 23 07 13 - DUCT INSULATION
SECTION 23 07 19 - HVAC PIPING INSULATION
SECTION 23 09 00 - INSTRUMENTATION AND CONTROL FOR HVAC
SECTION 23 21 13 - HYDRONIC PIPING
SECTION 23 21 16 - HYDRONIC PIPING SPECIALTIES
SECTION 23 23 00 - REFRIGERANT PIPING
SECTION 23 31 13 - METAL DUCTS
SECTION 23 33 00 - AIR DUCT ACCESSORIES
SECTION 23 36 00 - AIR TERMINAL UNITS
SECTION 23 38 13 - COMMERCIAL-KITCHEN HOODS
DIVISIONS 24 - 25
NOT APPLICABLE
Table of Contents TOC - 3
Copyright 2026 Gensler

Gensler July 20, 2026 RDU
090.4000.017 ISSUE FOR BID Concessions - Phase 2
Morrisville, North Carolina
DIVISION 26 - ELECTRICAL (ENGINEERING DESIGN INC.)
SECTION 26 05 00 - COMMON WORK RESULTS FOR ELECTRICAL
SECTION 26 05 19 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
SECTION 26 05 SECTION 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
SECTION 26 05 29 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
SECTION 26 05 44 - SLEEVES FOR ELECTRICAL RACEWAYS
SECTION 26 05 53 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 26 05 73 - ARC FLASH HAZARD ANALYSIS AND SHORT-CIRCUIT COORDINATION
STUDY
SECTION 26 09 23 - LIGHTING CONTROL DEVICES
SECTION 26 24 16 - PANELBOARDS
SECTION 26 28 13 - FUSES
SECTION 26 28 16 - ENCLOSED SWITCHES
SECTION 26 29 23 - VARIABLE-FREQUENCY MOTOR CONTROLLERS
SECTION 26 51 00 - INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS (FAITH GROUP)
SECTION 27 00 00 - COMMUNICATIONS GENERAL REQUIREMENTS
SECTION 27 05 SECTION 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
SECTION 27 05 SECTION 28 - PATHWAYS FOR COMMUNICATIONS SYSTEMS
SECTION 27 05 29 - HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS
SECTION 27 05 44 - SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS AND
CABLING
SECTION 27 05 53 - IDENTIFICATION FOR COMMUNICATIONS SYSTEMS
SECTION 27 11 00 - COMMUNICATIONS ROOM EQUIPMENT
SECTION 27 11 26 - COMMUNICATIONS POWER DISTRIBUTION UNITS
SECTION 27 15 13 - COMMUNICATIONS COPPER HORIZONTAL CABLING
SECTION 27 41 00 - AUDIO VISUAL SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY (ENGINEERING DESIGN INC.)
SECTION 28 31 11 - EXISTING, DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM
DIVISIONS 31 - 48
NOT APPLICABLE
APPENDIX
NOT APPLICABLE
END OF TABLE ON CONTENTS
Table of Contents TOC - 4
Copyright 2026 Gensler

Gensler 2026-07-20 RDU
090.4000.017 ISSUE FOR BID Concessions - Phase 2
Morrisville, North Carolina
SECTION 01 23 00 - ALTERNATES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.2 DEFINITIONS
A. Alternate: An amount proposed for certain work that may be added to or deducted from the
Base Bid amount if Owner decides to accept a corresponding change either in the amount of
construction to be completed or in the products, materials, equipment, systems, or installation
methods described in the Contract Documents.
1. The cost or credit for each alternate is the net addition to or deduction from the Contract
Sum to incorporate alternate into the Work. No other adjustments are made to the
Contract Sum.
1.3 PROCEDURES
A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate
work of the alternate into Project. Amount of alternate prices shall include cost of
coordination, cost of overhead and profit, and cost of modifications or adjustments to adjacent
work due to integration of alternate.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar
items incidental to or required for a complete installation whether or not indicated as part
of alternate.
B. Notification: Immediately following award of the Contract, notify each party involved, in
writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or
deferred for later consideration. Include a complete description of negotiated modifications to
alternates.
C. Execute accepted alternates under the same conditions as other work of the Contract.
D. Schedule: A Schedule of Alternates is included in Part 3 below. Specification Sections
contain requirements for materials necessary to achieve the work described under each
alternate.
ALTERNATES 01 23 00 - 1
Copyright 2026 Gensler

Gensler 2026-07-20 RDU
090.4000.017 ISSUE FOR BID Concessions - Phase 2
Morrisville, North Carolina
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. Alternate No. M1: Remove/Replace (5) Existing Terminal Units
END OF SECTION
ALTERNATES 01 23 00 - 2
Copyright 2026 Gensler

Gensler 2026-07-20 RDU
090.4000.017 ISSUE FOR BID Concessions - Phase 2
Morrisville, North Carolina
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project.
1.2 COORDINATION
A. Coordination: Coordinate construction operations to ensure efficient and orderly installation of
each part of the Work. Coordinate construction operations, included in different Sections that
depend on each other for proper installation, connection, and operation.
1.
B.
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
8. Coordination and management of required Environmental Product Declaration form
submittals.
9. Coordination and management of required LEED-related submittals as required of all
subcontractors and contractors working on the Project.
1.3 ADMINISTRATIVE AND SUPERVISORY PERSONNEL
A. General: In addition to Project superintendent, provide other administrative and supervisory
personnel as required for proper performance of the Work.
1.4 PROJECT MEETINGS
A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise
indicated.
1. Attendees: Inform participants and others involved, and individuals whose presence is
required, of date and time of each meeting. Notify Owner and Architect of scheduled
meeting dates and times.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 1
Copyright 2026 Gensler

Gensler 2026-07-20 RDU
090.4000.017 ISSUE FOR BID Concessions - Phase 2
Morrisville, North Carolina
3. Minutes: Record minutes in writing. Distribute the meeting minutes to everyone
concerned, including Owner and Architect, within 3 days of the meeting.
4. Notification: Inform participants 3 days prior to meetings not regularly scheduled.
B. Preconstruction Conference: Schedule a preconstruction conference before starting
construction, at a time convenient to Owner and Architect. Hold the conference at a
convenient location. Conduct the meeting to review responsibilities and personnel
assignments.
1. Agenda: Discuss items of significance that could affect progress, including the
following:
a. Tentative construction schedule.
b. Critical work sequencing.
c. Designation of responsible personnel/
d. Procedures for preparing and processing.
1) Distribution of Contract Documents.
2) Requests for Information (RFIs).
3) Submittal of Shop Drawings, Product Data, and Samples.
4) Substitution Requests: inclusive of changes that impact GPS, LEED or other
sustainability program requirements.
5) Field Orders.
6) Proposed Change Orders (PCOs).
7) Change Orders.
8) Applications for Payment.
9) Preparation and maintenance of record documents.
e. Project Coordination.
f. Use of Premises.
g. Parking availability.
h. Office, work, and storage areas.
i. Construction facilities, controls and construction aids.
j. Temporary utilities.
k. Equipment deliveries and priorities.
l. First aid.
m. Security.
n. Housekeeping.
o. Working hours.
p. Construction Waste and indoor air quality management. LEED requirements need
ongoing coordination and reporting to ensure subcontractor participation.
Contractor shall either conduct separate construction waste and indoor air quality
management meetings or discuss goals and issues as part of the following regular
meetings.
1) Pre-bid meeting.
2) Pre-construction meeting.
3) Subcontractor initial meetings.
4) Pre-fabrication meeting.
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 2
Copyright 2026 Gensler

Gensler 2026-07-20 RDU
090.4000.017 ISSUE FOR BID Concessions - Phase 2
Morrisville, North Carolina
5) Regular job-site meetings.
6) Job safety meetings.
7) Special Construction Waste and Indoor Air Quality Management meetings.
8) Punchlist meetings.
C. Preinstallation Conferences and Meetings: Conduct a preinstallation conferences and meetings
at Project site before each construction activity that requires coordination with other
construction.
1. Attendees: The Installer and representatives of manufacturers and fabricators involved
in or affected by the installation, and its coordination or integration with other materials
and installations that have preceded or will follow, shall attend the meeting. Advise the
Architect of scheduled meeting dates.
2. Review the progress of other construction activities and preparations for the particular
activity under consideration at each preinstallation conference, including requirements
for the following:
a. Contract Documents.
b. Related Product Substitutions.
c. Related Change Orders.
d. Purchases, including those that impact the quality of the work or product
requirements.
e. Deliveries.
f. Shop Drawings, Product Data, and quality-control samples.
g. Review of mockups.
h. Possible conflicts.
i. Compatibility problems.
j. Time schedules.
k. Weather limitations.
l. Manufacturer's recommendations.
m. Warranty requirements.
n. Compatibility of materials.
o. Compliance of materials with GPS, LEED, or other sustainability requirements.
p. Acceptability of substrates.
q. Temporary facilities.
r. Space and access limitations.
s. Governing regulations.
t. Safety.
u. Inspecting and testing requirements.
v. Required performance results.
w. Recording requirements.
x. Protection.
y. Construction Waste.
3. Record significant discussions and agreements and disagreements of each conference,
and the approved schedule. Promptly distribute the record of the meeting to everyone
concerned, including the Owner and the Architect.
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 3
Copyright 2026 Gensler

This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Solicitation Number: 332-2022-CDBG-NR-Jackson-Heights - 21-C-4032 Project Title: Sanford NC - Jackson Heights CDBG-NR

State Government of North Carolina

Due by 10/08/2026

ATTENTION ALL BIDDERS POC DIVISION 12 BID OPENING CONFERENCE LINE 092226_ATTENTIONTOBIDDERS.pdf Doc. Type:

Division of Highways

Due by 9/22/2026

Bid Title: Bid 4003-100726 Eastside Final Clarifier 4 Category: Bid Opportunities Status: Open

City of High Point

Due by 10/07/2026

Bid Number: 27-002 Bid Title: Pender County US 421 CFPUA Interconnect Category: General

County of Pender

Due by 10/22/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.