Locker Room Renovation, Westbrook

Agency: Portland Water District
State: Maine
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Jun 23, 2026
Due Date: Jul 13, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Basic Info
Locker Room Renovation, Westbrook

Release Date

June 9, 2026

Categories

Description

The project consists of renovating the locker room at PWD’s Wastewater Treatment Facility in Westbrook.

For questions related to this RFB, please email the District’s Purchasing Agent, Wesley Gilbert: wgilbert@pwd.org.

Attachments Download All Attachments

Attachment Preview

PORTLAND WATER DISTRICT June 9, 2026
225 Douglass Street, P.O. Box 3553, Portland, ME 04104-3553
(207) 774-5961 - FAX (207) 761-8325
REQUEST FOR BID
This is NOT an order.
All Bids must be submitted
By: 2:00 pm, July 13th, 2026
2026 -Westbrook Locker Room
To Potential Contractors
Thank you for your interest in this Portland Water District (PWD) Request for Bid (RFB). The purpose of
this RFB is to establish the vendor who shall perform those services, the rate the PWD shall pay, and the
terms and conditions of those services. Bids are subject to the terms & conditions included in this RFB.
Evaluation will be based on price. The PWD will execute an agreement and issue a purchase order
upon award. Please see Attachment Two for a sample of the agreement. Any exceptions to the
agreement must be stated in the vendor's bid.
Pre-proposal meetings will be held by appointment only. All questions related to this RFB must be
submitted in writing before the deadline listed below. When submitting a question, please include the
name of your organization and contact information. The answers to all questions will be provided to all
bidders.
Bids must be submitted electronically to wgilbert@pwd.org via an email attachment or link to a secure FTP
site. Bids must be received by PWD by deadline listed above and below. Signed copies of Attachment Three
and Attachment Four must be included in the bid. Late or incomplete bids will not be accepted.

RFB SCHEDULE & DETAILS
ATTACHMENTS:
Attachment 1: Scope of Work & Drawings
Attachment 2: Sample Agreement for Services (executed upon award, do not sign)
Attachment 3: Instructions & Conditions sign and submit with bid (RETURN WITH BID)
Attachment 4: Bid sheet sign and submit with bid (RETURN WITH BID)
RFB SCHEDULE:
6/9/26- Email RFB to vendors
6/9/26 to 7/2/26 - Question and answer period, questions sent to wgilbert@pwd.org
Answers to all questions will be shared
7/13/26 by 2:00PM - Bids Due
Project Complete: Dependent upon material lead time.
BID SECURITY:
The successful bidder will be expected to present Performance and Payment Bonds in the amount of one
hundred percent (100%) of the bid price as surety for the performance of the contract. The performance and
Payment bonds will be required prior to the execution of the contract.
POINT OF CONTACT:
All questions and bid must be submitted to contact listed below
Please use email for all questions.
Portland Water District
Wesley Gilbert, Purchasing Agent
225 Douglass Street
Portland, ME 04102
(e)wgilbert@pwd.org
(t) 207.523.5203

Attachment 1
Job Name:WB Locker room renovation.
Attachment 4: Project Objectives and Minimum Scope
PRE-PROPOSAL MEETING
Pre proposal meetings will be held by appointment only.
PROJECT BACKGROUND AND GENERAL OBJECTIVES
Renovation of Westbrook Locker room approximately 350 sf in size.
SCOPE OF WORK
The successful respondent and the District will enter into an Agreement for Construction Services per the
District's standard terms and conditions as provided in the attached sample Agreement. Proposers are
encouraged to ask questions or request clarifications regarding the Agreement during the RFB process; the
District does not intend to negotiate the Agreement's standard terms and conditions after recommendation of
award is made. Any exceptions to the terms of the Agreement must be noted in the proposal.
The bids shall include the minimum requirements stated in this RFB The scope of work shall include, but not
necessarily be limited to, the following.
Westbrook; 285 Park Rd Westbrook, ME 04092
Demo existing cement block walls and all items currently in locker room/ washroom
Install 2 "pods" with a shower stall, toilet and sink in each.
One Pod will be ADA compliant.
Prep and paint floors with 2-part epoxy, walls, miscellaneous piping, doors and trim (all paint must be
approved by PWD).
Replace lockers with similar style and quantity.
Provide paper towel holders, soap dispensers and toilet paper holders to be installed by the
contractor. And approved by PWD.
All miscellanies electrical and plumbing directly associated with the project.
Install an exhaust fan system for each pod and locker areas.
All Plumbing fixtures will be touchless technology.
Frame in small closet where current IT equipment is housed.
Bench Seating in "pod" and locker area.
Washer and Dryer area.
New Mop sink.
Permitting by contractor.
Temporary shower space provided by contractor.

SCHEDULE
Bids Sent: 6/9/2026
Pre-bid site walk: By appointment
Bids due by: 2:00PM, July 13th, 2026.
Work completed by: Dependent upon material lead time
SELECTION
Contract will be awarded to the overall lowest cost option that can complete the work by the schedule date.
Provide one lump sum number with bid outlining the minimum requirements listed above.
PLANS
Attached to this scope are Architect drawings for the renovation.

DRAWING LIST
SHEET NUMBER
PWD WESTBROOK - LOCKER ROOM RENOVATION
G0-0 TITLE SHEET
G0-1 GENERAL NOTES, ABBREVIATIONS, AND LEGENDS
G1-0 AREA OF WORK PLAN
ARCHITECTURAL
AD1-1 DEMOLITION PLANS
285 PARK ROAD
A0-1 ASSEMBLIES AND SCHEDULES
A1-1 NEW WORK PLANS
WESTBROOK, MAINE
A4-0 INTERIOR ELEVATIONS
PERMIT SET
OCTOBER 3, 2023
ARCHITECT
RYAN SENATORE ARCHITECTURE
500 CONGRESS STREET, SUITE 2
PORTLAND, MAINE 04101
O: 207-747-5159
C: 207-650-6414

c 2021 RYAN SENATORE ARCHITECTURE
SNOITAVONER ENIAM DAOR ,KOORBTSEW KOORBTSEW KRAP 582 DWP
RYAN SENATORE ARCHITECTURE 500 CONGRESS STREET, SUITE 2 PORTLAND, MAINE 04101 O: 207-747-5159 C: 207-650-6414 senatorearchitecture.com
CONSULTANTS: Y L N On o 3 Ti t2 Nc 0 u P R I n s t r 3 , 2 S oR
SCE REVISEIONSr : B Ro O f G t T OoC N R O P
DATE:
PROJECT No. 2328
DRAWN BY: RRT, ES
CHECKED BY: RJS
SCALE: AS NOTED
SHEET TITLE: GENERAL NOTES, ABBREVIATIONS, AND LEGENDS
OVERLAP STEEL COLLAR 1" MINIMUM INTUMESCENT SEALANT - PROVIDE IN AND FILL ENTIRE 3/4" DEPTH OF ANNULAR SPACE #8 x 3/4" STEEL WOOD SCREW AT EACH ANCHOR TAB (SEE SPECIFICATIONS THIS SHEET) 3/4" PLYWOOD OR 5/8" TYPE 'X' GWB 1/4" x 1-1/4" FENDER WASHER AT EACH ANCHOR TAB STEEL COLLAR 2 LAYERS OF WRAP STRIP - INSTALL TIGHT TO UNDERSIDE OF PLYWOOD SUBFLOOR 3: #8 x 3/8" SHEET METAL SCREWS PVC PIPE - 2 1/2" OR LARGER NOTE: IN LIEU OF THE WRAP STRIP AND STEEL COLLAR, A FIRESTOP DEVICE MAY BE USED (SEE SPECIFICATIONS THIS SHEET) DETAIL FOR 2 1/2" AND LARGER PVC PIPE PENETRATION 2 SCALE: 3" = 1'-0" SEALANT - SEE "SEALANT SCHEDULE" THIS SHEET FOR TYPE OF SEALANT - PROVIDE IN AND FILL ENTIRE DEPTH OF ANNULAR SPACE 3/4" PLYWOOD SUBFLOOR OR 5/8" GWB MINERAL WOOL PACKING MATERIAL IF/AS REQUIRED PENETRATING ITEM DETAIL LESS THAN 2 1/2" PVC PIPE PENETRATION 1 SCALE: 3" = 1'-0" SPECIFICATIONS
WRAP STRIP: 1/4" THICK x 1 1/2" MINIMUM WIDTH INTUMESCENT MATERIAL WITH PLASTIC FILM FACING BOTH SIDES. TEMPORARILY SECURE WITH MAKSING TAPE. SPECIFIED TECHNOLOGIES INC. (STI) "SpecSeal RED Wrap Strip" OR "SpecSeal BLU Wrap Strip" OR EQUAL. STEEL COLLAR: WRAP STRIP MANUFACTURER'S STEEL COLLAR, FABRICATED FROM .016 INCH THICK GALVANIZED SHEET STEEL, WIDTH TO MATCH WRAP STRIP (1 1/2" MINIMUM), WITH 1 INCH x 2 INCH ANCHOR TABS AND RETAINER TABS. ANCHOR TABS TO BE SYMMETRICALLY OPPOSED AROUND COLLAR; PROVIDE 3 TABS FOR 2 1/2" AND 3" PIPE; PROVIDE 4 TABS FOR 4" PIPE. INTUMESCENT SEALANT: ONE-PART, INTUMESCENT, LATEX ELASTOMER TESTED TO ASTM E 814. MINIMUM EXPANSION OF 3x AT 1000 degreesF. 3M "FIRE BARRIER SEALANT CP 25WB+" OR EQUAL. FIRESTOP SEALANT: SINGLE COMPONENT NONCOMBUSTIBLE FIRE RATED SEALANT TESTED TO ASTM E 814. TESTED TO 3000 degreesF. "BOSS 136 FIRESTOP/DRAFT SEALANT" MANUFACTURED BY ACCUMETRIC, LLC., OR EQUAL. SEALANT SCHEDULE: INTUMESCENT SEALANT: PROVIDE AT ALL PENETRATIONS THROUGH RATED CONSTRUCTION FOR PENETRATING ITEMS INCLUDING BUT NOT
LIMITED TO: PVC PIPE; ROOF LEADER PIPES; GAS PIPES & LINES; SPRINKLER PIPES; ELECTRICAL & COMMUNICATIONS CABLES & WIRES; AND ALARM SYSTEM WIRES. DO NOT USE INTUMESCENT SEALANT AT DOMESTIC HOT WATER OR HYDRONIC HEATING SYSTEM PIPES. FIRESTOP SEALANT: PROVIDE AT ALL PENETRATIONS THROUGH RATED CONSTRUCTION FOR PENETRATING ITEMS INCLUDING DOMESTIC HOT AND COLD WATER PIPES AND HYDRONIC HEATING SYSTEM PIPES. NOTE:

2328
GENERAL
NOTES,
ABBREVIATIONS,
AND LEGENDS
G0-1
SNOITAVONER
KOORBTSEW
DWP
DAOR
KRAP
582
ENIAM
,KOORBTSEW
GENERAL NOTES ABBREVIATIONS FIRESTOPPING DETAILS
A L
1: DRAWING NOTES: 19: PERMITS: AC AIR CONDITIONING LAB LABORATORY
CONTRACTOR TO FURNISH AND INSTALL ALL NOTED LABOR AND THE GENERAL CONTRACTOR SHALL OBTAIN AND PAY FOR ANY ACT ACOUSTICAL CEILING TILE LAM LAMINATED
MATERIALS UNLESS OTHERWISE NOTED. BUILDING PERMITS REQUIRED AND CARRY ANY INSURANCE AD AREA DRAIN LB POUND
ADAAG AMERICANS WITH DISABILITIES ACT LH LEFT-HAND
COVERAGES REQUIRED.
ACCESSIBILITY'S GUIDELINES LCC LEAD COATED COPPER
2: CODE COMPLIANCE: ADD ADDENDUM
M
ALL WORK SHALL CONFORM TO THE LATEST EDITION OF STATE, 20: INTERIOR FINISHES: AFF ABOVE FINISHED FLOOR
LOCAL AND OTHER CODES WHICH APPLY TO THIS PROJECT OR ALL INTERIOR FINISHES AND FURNISHINGS ARE TO BE CLASS 'A' AHU AIR-HANDLING UNIT M M A A C S H M M A A S C O HI N N R E Y OVERLAP STEEL COLLAR 1" MINIMUM
HAVE JURISDICTION. FIRE-RATED AND ARE TO COMPLY WITH IBC CHAPTER-8 A A R L CH A A R LU C M H I I N TE U C M T/ARCHITECTURAL MATL MATERIAL INTUMESCENT SEALANT - PROVIDE IN AND FILL c 2021 RYAN SENATORE
(INTERIOR FLAME SPREAD). AWP ACOUSTIC WALL PANEL MAX MAXIMUM E #8 N T x I 3 R / E 4" 3 S /4 T " E D E E L P W TH O O O D F S A C N R N E U W LA A R T S E P A A C C H E ANCHOR ARCHITECTURE
3: COORDINATION: B M M E D C O H M M E E C D H IU A M N - I D C E A N L SITY OVERLAY 3 T / A 4 B " P (S L E Y E W S O P O E D C O IF R IC 5 A /8 T " I O T N YP S E T H 'X I ' S G S W H B EET)
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE 21: ELECTRICAL DESIGN: B TO BLS BACK-TO-BACK ANGLES MEMB MEMBRANE
ALL DISCIPLINES AND TRADES SO THAT ALL BUILDING SYSTEMS REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS B.B.G.C. BASE BUILDING GENERAL CONTRACTOR MET METAL
AND COMPONENTS CAN BE ASSEMBLED WITHOUT CONFLICTS. IN BL BUILDING LINE MEZZ MEZZANINE
BLDG BUILDING MFR MANUFACTURER 1/4" x 1-1/4" FENDER WASHER AT EACH ANCHOR TAB
THE EVENT THAT THE CONSTRUCTION DOCUMENTS DEFINE 22: WASTE REMOVAL: BLKG BLOCKING MIN MINIMUM STEEL COLLAR
CONDITIONS WHICH PROHIBIT, OR MAY PROHIBIT, SUCH THE GENERAL CONTRACTOR SHALL DISPOSE OF ALL WASTE BSMT BASEMENT MISC MISCELLANEOUS 2 LAYERS OF WRAP STRIP - INSTALL TIGHT TO
ASSEMBLY, THE CONTRACTOR SHALL BRING TO THE ARCHITECTS AND DEBRIS OFF THE PREMISES. BTWN BETWEEN MO MASONRY OPENING UNDERSIDE OF PLYWOOD SUBFLOOR
BO BY OTHERS MTD MOUNTED 3: #8 x 3/8" SHEET METAL SCREWS
ATTENTION, IN WRITING AND IN A TIMELY FASHION, SUCH
C MTL METAL PVC PIPE - 2 1/2" OR LARGER
CONDITION. THE CONTRACTOR SHALL NOT PROCEED WITH 23: LANDLORD COORDINATION: C COURSE (MASONRY) MB MARKER BOARD NOTE: IN LIEU OF THE WRAP STRIP AND STEEL COLLAR, A FIRESTOP
RELATED WORK WITHOUT A WRITTEN RESOLUTION THE GENERAL CONTRACTOR MUST COORDINATE WITH THE CER CERAMIC DEVICE MAY BE USED (SEE SPECIFICATIONS THIS SHEET)
N
CLARIFICATION FROM THE ARCHITECT. BUILDING OWNER ALL ACTIVITIES INCLUDING BUT NOT LIMITED CG CORNER GUARD N NORTH
CH COAT HOOK
THE CONTRACTOR AND HIS/HER SUBCONTRACTORS SHALL BE TO WORK WHICH WILL GENERATE EXCESSIVE NOISE AND CJ CONTROL JOINT # NUMBER 2 DETAIL FOR 2 1/2" AND LARGER PVC PIPE PENETRATION
RESPONSIBLE FOR PROVIDING MATERIALS AND SYSTEMS SHOWN MODIFICATION TO UTILITIES. WORK MUST NOT INTERFERE CL CENTER LINE NIC NOT IN CONTACT SCALE: 3" = 1'-0"
IN THE CONSTRUCTION DOCUMENTS REGARDLESS OF WHERE WITH EXISTING SMOKE DETECTORS, ALARMS OR BUILDING CLG CEILING NOM NOMINAL DIMENSION
THE INFORMATION IS LOCATED. WHERE COMPONENTS OF A SYSTEM MANAGEMENT. CMU CONCRETE MASONRY UNIT NTS NOT TO SCALE
CO CLEAN OUT O
SYSTEM ARE INDICATED THE CONTRACTOR SHALL BE COL COLUMN o/ ON/OVER
RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS 24: TEMPORARY FACILITIES: CONC CONCRETE OC ON CENTER
NECESSARY TO COMPLETE THE SYSTEM. PROVIDE ALL TEMPORARY FACILITIES AND SERVICES, COND CONDITION OD OUTSIDE DIAMETER/OUTSIDE DIMENSION SEALANT - SEE "SEALANT SCHEDULE" THIS
CONSTRUCTION AND SUPPORT FACILITIES, AND SECURITY AND CONN CONNECT/CONNECTION OFF OFFICE SHEET FOR TYPE OF SEALANT - PROVIDE IN
CONST CONSTRUCTION OPNG OPENING AND FILL ENTIRE DEPTH OF ANNULAR SPACE
4: DISCREPANCIES & CLARIFICATIONS: PROTECTION AS NEEDED TO PROTECT NEW AND EXISTING CONT CONTINUOUS OPP OPPOSITE 3/4" PLYWOOD SUBFLOOR OR 5/8" GWB THIS PROJECT INVOLVES THE FIT-UP OF AN EXISTING BUILDING. CONSTRUCTION FOR THE DURATION OF A COMPLETE CORR CORRIDOR OPP H OPPOSITE HAND
EXISTING DIMENSIONS SHOWN ON THE DRAWINGS ARE BELIEVED INSTALLATION. CT CERAMIC TILE OSB ORIENTED STRAND BOARD
CCUUH CABINET UNIT HEATER
TO BE ACCURATE, BUT CANNOT BE GUARANTEED, MEASURE AND OZ OUNCE
VERIFY DIMENSIONS IN FIELD PRIOR TO FABRICATION AND 25: FINAL CLEANING: D P
CONSTRUCTION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR EMPLOY EXPERIENCED WORKERS FOR FINAL CLEANING. D D B F L D D R O I U N B K L IN E G FOUNTAIN PBOIBC PURCHASED BY OWNER INSTALLED BY M RE IN Q E U R IR AL E D WOOL PACKING MATERIAL IF/AS
TO BRING TO THE ARCHITECTS ATTENTION, IN WRITING, ANY CLEAN EACH SURFACE TO THE CONDITION EXPECTED IN A DIA DIAMETER PC C PR O E N C T A R S A T CTOR PENETRATING ITEM DISCREPANCIES OR AMBIGUITIES IN THE DRAWINGS AND/OR COMMERCIAL BUILDING CLEANING PROGRAM. D D I I M FF D D I I M FF E U N S S E IO R N PL PLATE
SPECIFICATIONS. THE CONTRACTOR SHALL NOT PROCEED WITH DN DOWN PLAM PLASTIC LAMINATE
RELATED WORK WITHOUT A WRITTEN RESOLUTION OR 26: MANUFACTURERS INSTRUCTIONS: DR DOOR PR PAIR
CLARIFICATION FROM THE ARCHITECT. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED DSP DRY STAND PIPE PRE FAB PREFABRICATE
ACCORDING TO MANUFACTURER'S SPECIFICATIONS. DWG DRAWING PRIV PRIVACY
PRIM PRIMED
5: LAYOUT: E PSF POUNDS PER SQUARE FOOT 1 DETAIL LESS THAN 2 1/2" PVC PIPE PENETRATION
UNLESS INDICATED OTHERWISE, CENTER WALL FRAMING AND 27: GUARANTEE: E EAST PSI POUNDS PER SQUARE INCH SCALE: 3" = 1'-0"
PARTITION FRAMING ON COLUMN LINES. FLOOR PLAN GUARANTEE: ALL MATERIALS AND WORKMANSHIP SHALL BE E E L A E E L A E C V H ATION P P T T N D P P A A R IN T T IT E I D ON
DIMENSIONS ARE TO CENTER OF FRAMING, FACE OF CONCRETE, GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF ELEC ELECTRICAL PVC POLYVINYL CHLORIDE
FACE OF CMU, OR FROM COLUMN CENTERLINES, UNLESS FINAL ACCEPTANCE UNLESS OTHERWISE SPECIFIED FOR A ELEV ELEVATOR PWD PLYWOOD
INDICATED OTHERWISE. DOORS AND WINDOWS ARE LONGER PERIOD OF TIME ON A CERTAIN ITEM. ENTR ENTRANCE PT PRESSURE TREATED SPECIFICATIONS
EQ EQUAL
PERF PERFORATED
DIMENSIONED TO CENTERLINES UNLESS INDICATED OTHERWISE. EQUIP EQUIPMENT
28: ASBESTOS: EXP EXPANSION Q WRAP STRIP: 1/4" THICK x 1 1/2" MINIMUM WIDTH INTUMESCENT
6: CENTERING: ALL MATERIAL USED FOR THE CONSTRUCTION OF THIS EXPB EXPANSION BOLT QT QUARRY TILE MATERIAL WITH PLASTIC FILM FACING BOTH SIDES. TEMPORARILY
EXPJ EXPANSION JOINT QTR QUARTER SECURE WITH MAKSING TAPE. SPECIFIED TECHNOLOGIES INC. (STI)
UNLESS INDICATED OTHERWISE, CENTER BUILDING ELEMENTS PROJECT, WHETHER BUILDING MATERIALS OR EXT EXTERIOR
"SpecSeal RED Wrap Strip" OR "SpecSeal BLU Wrap Strip" OR EQUAL.
WITHIN OR BETWEEN OTHER BUILDING ELEMENTS WHEN APPURTENANCES, SHALL BE NON-ASBESTOS CONTAINING EPDM ETHYLENE PROPYLENE DIENE MONOMER R
CONDITIONS OR THE DRAWINGS INDICATE OR IMPLY THAT SUCH IS MATERIAL. EWC ELECTRIC WATER COOLER R RISER/RADIUS
RAD RADIUS STEEL COLLAR: WRAP STRIP MANUFACTURER'S STEEL COLLAR,
THE INTENT, WHETHER OR NOT DIMENSIONS ARE INCLUDED F
RB RUBBER BASE FABRICATED FROM .016 INCH THICK GALVANIZED SHEET STEEL,
29: HAZARDOUS FUMES: F FAHRENHEIT
FB FLAT BAR RCP REFLECTED CEILING PLAN WIDTH TO MATCH WRAP STRIP (1 1/2" MINIMUM), WITH 1 INCH x 2 INCH
7: SYMMETRY: THE GENERAL CONTRACTOR SHALL CONFIRM THAT ALL FC FIRE EXTINGUISHER AND CABINET RD ROOF DRAIN ANCHOR TABS AND RETAINER TABS. ANCHOR TABS TO BE
WHERE CONDITIONS OR THE DRAWINGS INDICATE OR IMPLY THAT MATERIAL AND FINISHES SPECIFIED AND THEIR FABRICATION FD FLOOR DRAIN REBAR REINFORCING BAR SYMMETRICALLY OPPOSED AROUND COLLAR; PROVIDE 3 TABS FOR 2
S A Y P M PL M IE E S T R E Y Q U IS A I L N L T Y E T N O D E B D O , T I H N F S O ID R E M S A , T U IO NL N E P S R S O C V O ID N E D D IT A IO T N O S N C E L S E I A D R E LY D O U R R IN IN S G T A C L O L N A S T T IO R N U C W T IL IO L N N O W T H R IC E H L E M A A S Y E B F E U A M H ES A Z O A R R D AR O O R MAS F F F T E E W C D F F F I I I R R R E E E T E E R X X E T T I I A N N T G G E U U D I I S S W H H O E E O R R D CABINET R R R E E E Q I F NF R R R E E E Q I F N R U F I I O G R R E E R C D A E T D OR 1/2" AND 3" PIPE; PROVIDE 4 TABS FOR 4" PIPE.
PRECLUDE SUCH APPLICATION. NUISANCE TO PERSONNEL. FIN FINISH RES RESILIENT INTUMESCENT SEALANT: ONE-PART, INTUMESCENT, LATEX
FL FLOOR REV REVERSE ELASTOMER TESTED TO ASTM E 814. MINIMUM EXPANSION OF 3x AT
8: ACCESSIBILITY: 30: PEST CONTROL: FOB FACE OF BRICK RM ROOM 1000 degreesF. 3M "FIRE BARRIER SEALANT CP 25WB+" OR EQUAL.
D 9 A 4 O L - L 3 O 4 H R 8 A , O N C P D H E I A C N P A IN T P E G P R S E D 5 S H O A A C F L C T L E H M S E S E M I E B A T L I E N T H E B E A H T R U H E M R Q A O U N O I R R M E IG S M , H E G T N R S T A C S B O O B M F A M T R I I S S T , I L O A E N ND I C S N E R S A E E L V C I A T C N S E D / S R C O A A N D U D E L N A K T N S A Y . R O O P U E N N D I N A G LL S P C E A N P E A T B R L A E T O IO F N H S A , R C B R O A R C I K N S G AND F F F F O O O O W S F C F F F F A A A A C C C C E E E E O O O O F F F F C W S FI T O N A U N L IS D L C H S RETE S R R S O OW R R SO O IG U U H T G T H H O O F P W E A N Y ING F R I A R T E E S D T O S P E A S L E A A N L T A T N E T S : T S E IN D G T L O E A C S O T M M P E O N 81 E 4 N . T T E N S O T N E C D O T M O B U 30 S 0 T 0 I degrees B F L . E "B F O IR S E S
TITLE LATEST EDITION & THE DEPARTMENT OF JUSTICE ADA FSS FIRE SUPPRESSION SYSTEM SCHED SCHEDULE 136 FIRESTOP/DRAFT SEALANT" MANUFACTURED BY ACCUMETRIC,
STANDARDS FOR ACCESSIBLE DESIGN. 31. EXPOSED UTILITIES: FT FOOT SF SQUARE FEET LLC., OR EQUAL.
FTG FOOTING SIM SIMILAR
ALL EXPOSED UTILITY WIRES AND PIPES (ELECTRICAL, FRG FIBER REINFORCED GYPSUM SPEC SPECIFICATION
9: DRAWING SCALES: PLUMBING, ETC.) SHALL BE INSTALLED IN A WAY THAT DOES FTR FIN TUBE RADIATION SQ SQUARE SEALANT SCHEDULE:
WORK FROM THE GIVEN DIMENSIONS ONLY. SCALE IS INDICATED NOT OBSTRUCT OR PREVENT THE CLEANING OF FLOORS, FH FUME HOOD SST STAINLESS STEEL
ON THE DRAWINGS FOR CONVENIENCE ONLY. IT IS NOT INTENDED WALLS, AND CEILING AREAS. THEY SHALL BE INSTALLED A G STC SOUND TRANSMISSION CLASS INTUMESCENT SEALANT: PROVIDE AT ALL PENETRATIONS THROUGH
THAT INFORMATION BE DETERMINED BY SCALING THE DRAWINGS MINIMUM OF 6" OFF FLOORS AND 1" OFF WALLS, CEILINGS AND G G A A LV G G A A L U V G A E NIZED S S T T D L S S T T A E N EL DARD RATED CONSTRUCTION FOR PENETRATING ITEMS INCLUDING BUT NOT
SINCE SOME ITEMS MAY NOT BE TO SCALE. ADJACENT PIPES. GB GRAB BAR STOR STORAGE LIMITED TO: PVC PIPE; ROOF LEADER PIPES; GAS PIPES & LINES;
GC GENERAL CONTRACTOR STRUCT STRUCTURE/STRUCTURAL SPRINKLER PIPES; ELECTRICAL & COMMUNICATIONS CABLES & WIRES;
10: WATER-RESISTANT GWB: 32. OWNER SUPPLIED EQUIPMENT: GFI GROUND-FAULT INTERRUPTER SUSP SUSPENSION AND ALARM SYSTEM WIRES. DO NOT USE INTUMESCENT SEALANT AT
INSTALL WATER-RESISTANT GYPSUM WALL BOARD IN ALL REST EQUIPMENT SUPPLIED BY THE OWNER AND INSTALLED BY THE GL GLASS/GLAZING/GLAZED T DOMESTIC HOT WATER OR HYDRONIC HEATING SYSTEM PIPES.
ROOMS & TOILET ROOMS OR AT ANY WALL WITH PLUMBING GENERAL CONTRACTOR:I GLAM GLUE-LAMINATED WOOD T&G TONGUE&GROOVE RYAN SENATORE
FIXTURES. EQUIPMENT INFORMATION AND SPECIFICATIONS ARE TO BE G G W ND B G G R YP O S U U N M D WALL BOARD T T E H L K T T E H L IC E K PHONE FIRESTOP SEALANT: PROVIDE AT ALL PENETRATIONS THROUGH ARCHITECTURE
THE MOST CURRENT AVAILABLE AT THE TIME OF H TOD TOP OF DECK RATED CONSTRUCTION FOR PENETRATING ITEMS INCLUDING 500 CONGRESS STREET, SUITE 2
10A: HIGH IMPACT GWB: DOCUMENTATION PREPARATION. THE GENERAL CONTRACTOR HB HOSE BIB TOS TOP OF STEEL DOMESTIC HOT AND COLD WATER PIPES AND HYDRONIC HEATING PORTLAND, MAINE 04101
INSTALL HIGH IMPACT GYPSUM WALL BOARD IN ALL STAIRWELLS SHALL BE RESPONSIBLE FOR VERIFYING WITH THE OWNER THE HC HANDICAP TYP TYPICAL SYSTEM PIPES. O: 207-747-5159
EXACT DIMENSIONS AND EQUIPMENT CONNECTION HM HOLLOW METAL TV TELEVISION C: 207-650-6414
HORIZ HORIZONTAL TB TACK BOARD
11: INTERIOR ELEVATIONS: REQUIREMENTS (INCLUDING ELECTRICAL CIRCUIT HP HORSE POWER/HIGH POINT/HEAT PUMP TOC TOP OF CONCRETE NOTE: senatorearchitecture.com
INTERIOR ELEVATIONS MAY BE REVERSED FROM AND/OR SIMILAR REQUIREMENTS) OF EQUIPMENT TO BE SUPPLIED. THE HR HOUR U
TO ACTUAL CONDITIONS. SEE FLOOR PLANS FOR WINDOW AND GENERAL CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS HW HOT WATER UL UNDERWRITERS LABORATORIES, INC. FOR LOCATIONS OF RATED CONSTRUCTION, SEE ARCHITECTURAL CONSULTANTS:
DOOR QUANTITIES AND LOCATIONS, FOR CASEWORK LAYOUTS, AS NOTED ON THE DRAWINGS, INSTALL THE SET UP IN HVAC HEATING VENTILATION AIR CONDITIONING UV UNIT VENTILATOR FLOOR PLANS AND SECTIONS
AND FOR MONITOR LOCATIONS. WORKING ORDER, CHECK WARRANTIES, TEST AND NOT VOID I V
WARRANTIES. THE GENERAL CONTRACTOR SHALL ID INSIDE DIMENSION/INSIDE DIAMETER VCT VINYL COMPOSITION TILE
12: BUILDING INSULATION: COORDINATE WITH THE OWNER DELIVERY, STORAGE AND I I N N FO I I N N F C O H R E M S ATION V V E IF RT V V E E R R T IF IC Y A IN L FIELD L Y
PROVIDE AS INDICATED IN WALL SECTIONS AND IN ACCORDANCE INSTALLATION OF ALL OWNER SUPPLIED EQUIPMENT. THE INSUL INSULATION VOL VOLUME N
WITH PARTITION TYPES, WHETHER OR NOT SHOWN IN DETAILS GENERAL CONTRACTOR SHALL STORE EQUIPMENT IF J W On
AND OTHER DRAWINGS. FOR CLARITY, INSULATION MAY NOT BE REQUESTED BY THE OWNER UNTIL INSTALLATION. SEE JST JOIST W WEST o 3
SHOWN IN SOME CASES, EVEN IF IT IS TO BE PROVIDED. DRAWINGS FOR OTHER OWNER SUPPLIED/GENERAL JT JOINT W/O WITHOUT T t i 2
I 1 N 3 S : T B A L L O L C B K LO IN C G K : ING BEHIND ALL SURFACE-APPLIED FIXTURES C 33 O : N F T I R R A E C P T R O O R T I E N C S T T I A O L N L E N D O T IT E E : MS. K K K I D P 1 K 0 IL 0 N 0 - P D O R U IE N D DS W W W W F P / D W W W W I O I O T D O R H E K D F P LA O N IN G T E P R I N n s t r u c 3 , 2 0
TRIM, CASEWORK, SHELVES, BRACKETS, TOILET ACCESSORIES, EXISTING SPRINKLERHEADS, ALARM SYSTEM AND DETECTORS WT WEIGHT S oR
CHAIR RAILS, PICTURE RAILS, GRAB BARS, BASE MOLDINGS, AND ARE TO BE MODIFIED TO CONFORM. WITH THE PROPOSED SCE
AS OTHERWISE REQUIRED, WHEN SUCH ITEMS ARE APPLIED ON PLAN. COORDINATE WITH THE ARCHITECT, ANY MODIFICATION REVISEIONSr : B
STUD WALLS. OR LOCATIONS WHERE EXISTING SYSTEMS ARE AFFECTED BY R f o O
THE NEW DESIGN. G t T
DRAWING LEGEND OoC
14: PENETRATIONS AT STRUCTURAL MEMBERS: N
R O
BEFORE PENETRATING JOISTS, BEAMS OR OTHER STRUCTURAL 34: SOILS AT FOOTINGS:
P
MEMBERS, CONSULT WITH THE ARCHITECT. REPORT THE LOCATION OF ALL UNSUITABLE SOILS AND
A
MATERIALS BELOW ANTICIPATED LEVEL OF FOOTING TO THE
15: DAMAGED WORK: ARCHITECT PRIOR TO THE SETTING OF FORMS. EARTH BEDRROM ROOM NAME ELEVATION COMPASS LETTER
100 AND NUMBER 3 ELEVATION NUMBER
BUILDING OR SITE COMPONENTS WHICH ARE AFFECTED BY NEW
D B INTERIOR ELEVATION SYMBOL
WORK, DEMOLITION, OR WHICH MAY BE DAMAGED BY THE 35: ACCESS PANELS: POROUS FILL A4-5
GENERAL CONTRACTOR OR ANY SUB-CONTRACTOR SHALL BE CONTRACTOR IS RESPONSIBLE FOR COORDINATING QUANTITY 401.1 DOOR NUMBER
SHEET WHERE ELEVATION LOCATED
REPLACED OR RESTORED TO ORIGINAL CONDITION AND COLOR AND LOCATION OF ALL REQUIRED ACCESS PANELS FOR ALL C
TO MEET THE APPROVAL OF THE ARCHITECT. MEP CONTROLS, CLEANOUTS, DAMPERS, PULL BOXES, ETC. CONCRETE 1 WINDOW NUMBER
16: UTILITIES: 36: EXISTING HAZARDOUS MATERIALS CONCRETE SECTION NUMBER DATE:
VERIFY THE SIZE AND LOCATION OF ALL UNDERGROUND UTILITIES ALL HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO MASONRY UNIT REVISION NUMBER 3 SECTION MARK
1
AND REPORT ANY DISCREPANCIES TO THE ARCHITECT IN ASBESTOS AND LEAD PAINT ARE TO BE HANDLED, A3-0 PROJECT No.
WRITING. DO NOT PROCEED WITH WORK UNTIL THE ENCAPSULATED, ABATED AND DISPOSED OF IN ACCORDANCE BRICK SHEET WHERE SECTION LOCATED
DISCREPANCY HAS BEEN RESOLVED TO THE SATISFACTION OF WITH ANY AND ALL FEDERAL, STATE AND LOCAL F1 FLOOR-CEILING TYPE
DRAWN BY: RRT, ES
THE ARCHITECT. REQUIREMENTS AND REGULATIONS. STEEL DETAIL NUMBER
R1 ROOF SYSTEM TYPE
7 DETAIL MARK CHECKED BY: RJS
17: RATED CONSTRUCTION: 37: INDUSTRY STANDARDS:
PROVIDE RATED CONSTRUCTION AS REQUIRED BY CODE, AS ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH WOOD - ROUGH S1 SLAB TYPE A5-9
SPECIFIED, AND AS INDICATED ON DRAWINGS. IT IS THE INDUSTRY STANDARDS. STANDARDS INCLUDE BUT ARE NOT SHT WHERE DETAIL LOCATED SCALE: AS NOTED
RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE AND INSTALL LIMITED TO THE FOLLOWING:
GYPSUM BOARD LINWD FLOORING TYPE TRANSITION
ALL COMPONENTS REQUIRED TO CREATE SUCH RATED PARTITION TYPE SHEET TITLE:
CONSTRUCTION, REGARDLESS OF WHETHER OR NOT SUCH AAMA AMERICAN ARCHITECTURAL MANUFACTURERS
COMPONENTS ARE INDICATED. PROVIDE CONTINUITY OF SUCH ASSOCATION RIGID INSULATION NB B PARTITION TYPE TAG
RATED CONSTRUCTION AROUND AND BETWEEN SPACES, ACI AMERICAN CONCRETE INSTITUTE
PARTITION HEIGHT DESIGNATION INCLUDING AT CHASES AND AT FLOORS, TO MAINTAIN COMPLETE ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
SEPARATIONS, EVEN IF NOT SPECIFICALLY INDICATED. ASTM AMERICAN SOCIETY FOR TESTS AND MATERIALS BATT INSULATION
1HR FIRE RATED WALL AWI ARCHITECTURAL WOODWORK INSTITUTE
18: SHOP DRAWINGS: "CUSTOM GRADE" 2HR FIRE RATED WALL
CELLULOSE INSULATION
SUBMIT SHOP DRAWINGS TO THE ARCHITECT FOR REVIEW PRIOR AWS AMERICAN WELDING SOCIETY
TO FABRICATIONS. SUBMITTALS REQUIRED INCLUDE, BUT ARE IGMA INSULATING GLASS MANUFACTURERS ALLIANCE
NOT LIMITED TO, SHOP DRAWINGS FOR ALL PREFABRICATED NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL
CONCRETE, STEEL, MILLWORK & SIGNAGE, SAMPLES OF ALL MANUFACTURERS
PROPOSED PAINTS, METALS, WALL COVERINGS, LAMINATES, NRCA NATIONAL ROOFING CONTRACTORS ASSOCIATION
SOLID SURFACE MATERIALS, CERAMIC TILE, AND HARDWARE. NTCA NATIONAL TILE CONTRACTORS ASSOCIATION
SUBMIT MANUFACTURERS' DATA FOR ALL LIGHTING SYSTEMS, SMACNA SHEET METAL AND AIR CONDITIONING NATIONAL
AND HARDWARE. ASSOCIATION
WDMA WINDOW AND DOOR MANUFACTURERS ASSOCIATION

c 2021 RYAN SENATORE ARCHITECTURE
SNOITAVONER ENIAM DAOR ,KOORBTSEW KOORBTSEW KRAP 582 DWP
RYAN SENATORE ARCHITECTURE 500 CONGRESS STREET, SUITE 2 PORTLAND, MAINE 04101 O: 207-747-5159 C: 207-650-6414 senatorearchitecture.com
CONSULTANTS: Y L N On o 3 Ti t2 Nc 0 u P R I n s t r 3 , 2 S oR
SCE REVISEIONSr : B Ro O f G t T OoC N R O P
DATE:
PROJECT No. 2328
DRAWN BY: RRT, ES
CHECKED BY: RJS
SCALE: AS NOTED
SHEET TITLE: AREA OF WORK PLAN

1, 2
AD1-1
1, 2
A1-1
AREA OF WORK -
SHOWN IN PINK
AREA NOT IN CONTRACT -
SHOWN HATCHED
0 4' 8' 16' 32'
TCEJORP
HTRON
2328
AREA OF WORK
PLAN
T R
UE
RT H
O N
AREA OF WORK PLAN
1 G1-0
1/8" = 1'-0"
SNOITAVONER
KOORBTSEW
DWP
DAOR
KRAP
582
ENIAM
,KOORBTSEW
c 2021 RYAN SENATORE
ARCHITECTURE
RYAN SENATORE
ARCHITECTURE
500 CONGRESS STREET, SUITE 2
PORTLAND, MAINE 04101
O: 207-747-5159
C: 207-650-6414
senatorearchitecture.com
CONSULTANTS:
Y
L
N
On
o
3
Ti
t2
Nc
0
u
P R I n s t r 3 , 2
S oR
SCE
REVISEIONSr : B
Ro
O
f
G t T
OoC
N
R O
P
DATE:
PROJECT No.
DRAWN BY: RRT, ES
CHECKED BY: RJS
SCALE: AS NOTED
SHEET TITLE:

c 2021 RYAN SENATORE ARCHITECTURE
SNOITAVONER ENIAM DAOR ,KOORBTSEW KOORBTSEW KRAP 582 DWP
RYAN SENATORE ARCHITECTURE 500 CONGRESS STREET, SUITE 2 PORTLAND, MAINE 04101 O: 207-747-5159 C: 207-650-6414 senatorearchitecture.com
CONSULTANTS: Y L N On o 3 Ti t2 Nc 0 u P R I n s t r 3 , 2 S oR
SCE REVISEIONSr : B Ro O f G t T OoC N R O P
DATE:
PROJECT No. 2328
DRAWN BY: RRT, ES
CHECKED BY: RJS
SCALE: AS NOTED
SHEET TITLE: DEMOLITION PLANS

"4
"4-'3
REMOVE TOILET
REMOVE EXISTING FIRE PARTITIONS
ALARM STROBE/HORN
REMOVE EXISTING
RETURN AIR GRILLE
REMOVE EXISTING
RETURN AIR GRILLE
REMOVE MASONRY
WALLS BETWEEN
EXISTING DOOR AND
BATHROOMS
FRAME TO REMAIN
REMOVE ACT SYSTEM
COMPLETELY WITHIN
EXISTING IT EQUIPMENT REMOVE ALL
AREA OF WORK
WALL TO REMAIN PLUMBING FIXTURES
IN AREA OF WORK -
CAP ALL LINES NOT
TO BE REUSED
REMOVE TOILET
AS REQD TO ALIGN PARTITIONS
NEW OPENING TO
EXISTING COURSING REMOVE MASONRY
MAINTAIN STRUCTURAL WALLS WITHIN
INTEGRITY OF BEARING SHOWER ROOM
WALL WHERE OPENING
IS CREATED DURING
DEMOLITION, TYP.
REMOVE ALL FLOOR TILE
REMOVE PORTION
AND ACT CEILING ABOVE
OF WALL AS REQD IN AREA OF WORK
FOR NEW DOOR
REMOVE SHOWERS
NOTE WELL: BUILDING
REMOVE EXISTING FIRE
STRUCTURE BEARS REMOVE MASONRY
ALARM STROBE/HORN REMOVE BENCH
ON CMU THIS WALL - WALLS BETWEEN
DEMO ACCORDINGLY SHOWER ROOM AND
REMOVE LOCKERS
JANITOR CLOSET
REMOVE MASONRY
ABOVE LOCATIONS REMOVE DOORS
WHERE DOOR TO BE AND FRAMES REMOVE MOP
DEMOLISHED, TYP. SINK AND
SHELVING
2328
DEMOLITION
EXISTING PLUMBING, REMOVE PORTION
PLANS
MILLWORK, AND EQUIPMENT OF WALL AS REQD
IN BREAK ROOM TO REMAIN FOR NEW DOOR
AD1-1
DEMOLITION FLOOR PLAN
1
1/2" = 1'-0"
SNOITAVONER
KOORBTSEW
DWP
DAOR
KRAP
582
ENIAM
,KOORBTSEW
c 2021 RYAN SENATORE
ARCHITECTURE
KEY PLAN
RYAN SENATORE
ARCHITECTURE
500 CONGRESS STREET, SUITE 2
PORTLAND, MAINE 04101
O: 207-747-5159
C: 207-650-6414
senatorearchitecture.com
CONSULTANTS:
Y
L
N
On
o
3
Ti
t2
Nc
0
u
P R I n s t r 3 , 2
S oR
SCE
REVISEIONSr : B
Ro
O
f
G t T
OoC
N
R O
P
DATE:
PROJECT No.
DRAWN BY: RRT, ES
CHECKED BY: RJS
SCALE: AS NOTED
SHEET TITLE:
DEMOLITION REFLECTED CEILING PLAN
2
1/2" = 1'-0"

c 2021 RYAN SENATORE ARCHITECTURE
SNOITAVONER ENIAM DAOR ,KOORBTSEW KOORBTSEW KRAP 582 DWP
RYAN SENATORE ARCHITECTURE 500 CONGRESS STREET, SUITE 2 PORTLAND, MAINE 04101 O: 207-747-5159 C: 207-650-6414 senatorearchitecture.com
CONSULTANTS: Y L N On o 3 Ti t2 Nc 0 u P R I n s t r 3 , 2 S oR
SCE REVISEIONSr : B Ro O f G t T OoC N R O P
DATE:
PROJECT No. 2328
DRAWN BY: RRT, ES
CHECKED BY: RJS
SCALE: AS NOTED
SHEET TITLE: ASSEMBLIES AND SCHEDULES
FINISH SCHEDULE KEY
WALLS NOTES
EX EXISTING CMU - PAINTED PROVIDE EPOXY FINISH IN DAMP AREAS
1 GWB - PA 2 MOISTUR INTED E RESISTANT GWB - EPOXY PAINTE D
BASE
11 4" VINYL C OVE BASE
12 4" EPOXY SYSTEM INTEGRAL BASE
FLOORS
EX EXISTING 21 LVT "LUXU FLOOR RY VINYL TILE" RESILIENT FLOORI NG
22 EPOXY FL OOR SYSTEM
CEILINGS 31 MOISTURE RESISTANT GWB - PAINTED
DOOR SCHEDULE KEY
SUB-FLOOR ELEVATION A - FLUSH DOOR
FRAME SCHEDULE KEY
2" 2" 2" 2" "2 "4 1 2 STEEL STEEL - MASONRY OPENIN
R GENERAL NOTES
ME ALL OPENINGS WITH ATIONS DOOR HARDWARE TO BE ER' TYPE DOORS TO HAVE SOLID CORES
GRAPHIC DEPICTION DESCRIPTION
- LAYER OF 5/8" GWB - 6" LIGHT GAUGE METAL STUDS AT 24" O.C. - 1" AIR GAP 2 - EXISTING WALL TYPE
DOOR FRAME GENERAL
.ON ROOD EPYT SIZE SS LAIRETAM HSINIF DETALUSNI EPYT LAIRETAM DLOHSERHT DETAILS RESOLC GNITAR )SETUNIM( ERIF SSECCA .B.O.F MATERIALS KEY FINISH KEY STL - STEEL PTD - PAINTED WD - WOOD CLR - CLEAR GRADE WOOD
HTDIW THGIEH ENKCIHT DAEH BMAJ LLIS AL - ALUMINUM REMARKS
10A.1 11A.1 11B.1 A A A 3'-0" 3'-0" 3'-0" 7'-0" 7'-0" 7'-0" 1 3/ 1 3/ 1 3/ 4" WD 4" WD 4" WD CLR CLR CLR - - - 2 1 1 STL STL STL AL - - - - - - - - - - - Y Y Y - - - - - - LATCHING HARDWARE LATCHING HARDWARE LATCHING HARDWARE
# MOOR ROOM NAME WALLS HTRON HTUOS TSAE TSEW ESAB CEILINGS ROOLF THGIEH GNITAR .LTAM REMARKS
9A IT 10A LOC 11A SHO KER WER POD 1 2/EX 2 1 2/EX 2 EX 2 2/EX EX 2/EX 2 11 12 12 EX 31 22 32 22 32 8'- 8'- 8'- 0" - 0" - 0" - - EXPOSED MASONRY TO RECEIVE EPOXY FINISH W/ INTEGRAL BASE SIM. NEW EXPOSED MASONRY TO RECEIVE EPOXY FINISH W/ INTEGRAL BASE SIM. NEW
11B ADA SHOWER POD 2 2/EX 2/EX 2 12 22 32 8'- 0" - EXPOSED MASONRY TO RECEIVE EPOXY FINISH W/ INTEGRAL BASE SIM. NEW
12A JC EX 2 2 EX 12 22 32 8'- 0" - EXPOSED MASONRY TO RECEIVE EPOXY FINISH W/ INTEGRAL BASE SIM. NEW
13A STO RAGE 1 EX EX EX 11 21 31 8'- 0" - -
- LAYER OF 5/8" GWB - 3-5/8" LIGHT GAUGE METAL STUDS AT 24" O.C. - 1" AIR GAP 2 - EXISTING WALL
TYPE
FIRE RATING UL NUMBER STC RATING IIC RATING
TYPE
NA FIRE RATING UL NUMBER STC RATING IIC RATING
N/A N/A N/A
WALL TYPE NOTES
1.) REFER TO STRUCTURAL DRAWINGS FOR STUD SIZE AND SPACING 2.) FIRE RATED WALLS TO EXTEND UP TO DECKING ABOVE THROUGH THE FLOOR / CEILING ASSEMBLY. 3.) AT INTERIOR WALLS OF UNITS, FIRE RATED CEILING GWB MEMBRANE TO RUN CONTINUOUSLY OVER TOP OF WALLS, WHERE INTERIOR UNIT WALLS INTERSECT FIRE WALLS THE FIREWALL GWB WALL MEMBRANE TO RUN CONTINUOUSLY PAST THE INTERIOR UNIT WALL 4.) INSTALL WATER RESISTANT GYPSUM WALLBOARD IN ALL RESTROOMS AND TOILET ROOM WALLS AND CEILINGS, AND AT ANY WALL WITH PLUMBING FIXTURES 5.) PROVIDE 5" GWB BEHIND ALL TUBS AND SHOWERS AT EXTERIOR WALLS AND FIRE RATED 8 ASSEMBLIES. PROVIDE ADDITIONAL LAYER OF GWB TO COVER TUB AND SHOWER FLANGE. EXTEND ADDED LAYER ALONG ADJACENT WALLS AND ADJUST DOOR JAMB WIDTHS AS REQUIRED. 6.) WHEN TWO ADJACENT WALL TYPES HAVE DIFFERING NUMBERS OF LAYERS OF GWB, THE FINISHED FACE OF GWB MUST FORM ONE CONTIUOUS PLANE, ADJUST STUD PLANE LOCATION AS REQUIRED TO ACHIEVE THE CONTINUOUS PLANE 7.) HOLD BOTTOM OF GWB UP 1/2" FROM CONCRETE, PROVIDE SEALANT AT JOINT. 8.) ALL WALL TYPES WITH AN INSULATION COMPONENT TO BE ACOUSTICALLY SEALED 9.) PROVIDE ACOUSTICAL SEALANT AROUND ALL PENETRATING ELEMENTS IN WALLS AND CEILINGS (ELECTRICAL BOXES, DUCTS, PIPES, ETC) 10.) PROVIDE DIAGONAL BRACING UP TO DECK ABOVE AT ALL INTERIOR PARTITIONS THAT DO NOT GO UP TO DECK ABOVE FOR STIFFNESS AS REQUIRED

GRAPHIC DEPICTION DESCRIPTION
- LAYER OF 5/8" GWB
- 6" LIGHT GAUGE METAL STUDS AT 24" O.C.
- 1" AIR GAP
2 - EXISTING WALL
TYPE
FIRE RATING UL NUMBER STC RATING IIC RATING NC
N/A N/A N/A N/A
GRAPHIC DEPICTION DESCRIPTION
- LAYER OF 5/8" GWB
- 3-5/8" LIGHT GAUGE METAL STUDS AT 24" O.C.
- 1" AIR GAP
2
- EXISTING WALL
TYPE
FIRE RATING UL NUMBER STC RATING IIC RATING
NB
N/A N/A N/A N/A
GGRRAAPPHHIICC DDEEPPIICCTTIIOONN DDEESSCCRRIIPPTTIIOONN
- LAYER OF 5/8" GWB
- 3 5/8" LIGHT GAUGE METAL STUDS AT 16" O.C.
- 3 1/2" SOUND BATT INSULATION
- LAYER OF 5/8" GWB
TYPE
FIRE RATING UL NUMBER STC RATING IIC RATING
NA
N/A N/A N/A
WALL TYPE NOTES
1.) REFER TO STRUCTURAL DRAWINGS FOR STUD SIZE AND SPACING
2.) FIRE RATED WALLS TO EXTEND UP TO DECKING ABOVE THROUGH THE FLOOR / CEILING
ASSEMBLY.
3.) AT INTERIOR WALLS OF UNITS, FIRE RATED CEILING GWB MEMBRANE TO RUN CONTINUOUSLY
OVER TOP OF WALLS, WHERE INTERIOR UNIT WALLS INTERSECT FIRE WALLS THE FIREWALL
GWB WALL MEMBRANE TO RUN CONTINUOUSLY PAST THE INTERIOR UNIT WALL
4.) INSTALL WATER RESISTANT GYPSUM WALLBOARD IN ALL RESTROOMS AND TOILET ROOM
WALLS AND CEILINGS, AND AT ANY WALL WITH PLUMBING FIXTURES
5.) PROVIDE 5" GWB BEHIND ALL TUBS AND SHOWERS AT EXTERIOR WALLS AND FIRE RATED
8
ASSEMBLIES. PROVIDE ADDITIONAL LAYER OF GWB TO COVER TUB AND SHOWER FLANGE.
EXTEND ADDED LAYER ALONG ADJACENT WALLS AND ADJUST DOOR JAMB WIDTHS AS
REQUIRED.
6.) WHEN TWO ADJACENT WALL TYPES HAVE DIFFERING NUMBERS OF LAYERS OF
GWB, THE FINISHED FACE OF GWB MUST FORM ONE CONTIUOUS PLANE, ADJUST
STUD PLANE LOCATION AS REQUIRED TO ACHIEVE THE CONTINUOUS PLANE
7.) HOLD BOTTOM OF GWB UP 1/2" FROM CONCRETE, PROVIDE SEALANT AT JOINT.
8.) ALL WALL TYPES WITH AN INSULATION COMPONENT TO BE ACOUSTICALLY SEALED
9.) PROVIDE ACOUSTICAL SEALANT AROUND ALL PENETRATING ELEMENTS IN WALLS AND
CEILINGS (ELECTRICAL BOXES, DUCTS, PIPES, ETC)
10.) PROVIDE DIAGONAL BRACING UP TO DECK ABOVE AT ALL INTERIOR PARTITIONS THAT
DO NOT GO UP TO DECK ABOVE FOR STIFFNESS AS REQUIRED
HTDIW THGIEH
SSENKCIHT LAIRETAM
HSINIF
SIZE
DAEH BMAJ LLIS
GENERAL
DETAILS
.ON
ROOD EPYT
DETALUSNI
DOOR
EPYT
LAIRETAM DLOHSERHT
FRAME
RESOLC
GNITAR
ERIF
)SETUNIM(
SSECCA
.B.O.F
1
"2
2" 2"
SUB-FLOOR
ELEVATION
2
A - FLUSH DOOR
STEEL
MATERIALS KEY FINISH KEY
STL - STEEL PTD - PAINTED
WD - WOOD CLR - CLEAR GRADE WOOD AL - ALUMINUM
REMARKS
10A.1 A 3'-0" 7'-0" 1 3/4" WD CLR - 2 STL AL - - - Y - - LATCHING HARDWARE
"4
2" 2"
STEEL - MASONRY OPENING
11A.1 A 3'-0" 7'-0" 1 3/4" WD CLR - 1 STL - - - - Y - - LATCHING HARDWARE
11B.1 A 3'-0" 7'-0" 1 3/4" WD CLR - 1 STL - - - - Y - - LATCHING HARDWARE
12A.1 A 2'-6" 7'-0" 1 3/4" WD CLR - 1 STL - - - - Y - - LATCHING HARDWARE
13A.1 A 1'-8" 7'-0" 1 3/4" WD CLR - 2 STL AL - - - Y - - LATCHING HARDWARE
#
MOOR HTRON
TSAE
HTUOS
TSEW ESAB
ROOLF
WALLS
ROOM NAME
.LTAM
THGIEH
ROOM FINISH SCHEDULE
CEILINGS
REMARKS GNITAR
FINISH NOTES DOOR NOTES WALL TYPE NOTES
FINISH SCHEDULE KEY ROOM FINISH GENERAL NOTES DOOR SCHEDULE KEY FRAME SCHEDULE KEY DOOR GENERAL NOTES
1) ALSO SEE INTERIOR ELEVATIONS FOR GRAPHIC DEPICTION'S OF 1) FRAME ALL OPENINGS WITH
EXTENT OF FINISHES ELEVATIONS
WALLS NOTES
EX EXISTING CMU - PAINTED PROVIDE EPOXY FINISH IN DAMP AREAS 2) INSTALL MOISTURE RESISTANT (MOLD AND MILDEW RESISTANT) 2) ALL DOOR HARDWARE TO BE
GWB IN ALL AREAS WHERE PLUMBING FIXTURES EXIST (CEILING 'LEVER' TYPE
1 GWB - PAINTED
AND WALLS IN BATHROOMS)
2 MOISTURE RESISTANT GWB - EPOXY PAINTED 3) ALL DOORS TO HAVE SOLID CORES
3) CLOSETS SHALL BE FINISHED AS THE ROOMS THEY SERVICE
BASE
4) ALL SPACES DESIGNATED AS CLOSET OR 'CL.' ARE TO RECEIVE
11 4" VINYL COVE BASE ONE CLOTHING ROD 5'-2" AFF AND ONE 12" WIRE SHELF ABOVE
THE ROD ALONG THE WALL OPPOSITE THE DOOR UNLESS
12 4" EPOXY SYSTEM INTEGRAL BASE
NOTED OTHERWISE.
FLOORS 5) PROVIDE APPROPRIATE BLOCKING IN WALLS OF ALL BATHROOMS
BEHIND FIXTURES, PARTITIONS AND ACCESSORIES. PROVIDE
EX EXISTING FLOOR
BLOCKING FOR GRAB BARS IN WALLS OF BATHROOMS
21 LVT "LUXURY VINYL TILE" RESILIENT FLOORING
6) PROVIDE APPROPRIATE BLOCKING IN WALLS FOR DOOR STOPS
22 EPOXY FLOOR SYSTEM
7) BOTTOM EDGE OF GWB ON WALL SURFACES TO BE HELD UP 1/2"
CEILINGS
FROMC ONCRETE FLOOR SURFACES
ROOM FINISH SCHEDULE
31 MOISTURE RESISTANT GWB - PAINTED
8) UNLESS OTHERWISE NOTED IN DRAWINGS THE TYPICAL WALL
32 24" x 24" ACT HUNG CEILING AND GRID TYPE IS 'NA'. ALL OTHER PARTITION TYPES WILL BE INDICATED.
9) VERIFY UNDERLAYMENT MEETS MANUFACTURERS
ALL FINISHES TO MEET OR EXCEED NFPA 101 SECTION 39.3.3 SPECIFICATION AT RESILIENT FLOORING
9A IT 1 1 EX EX 11 EX 31 8'-0" - -
10A LOCKER 2/EX 2/EX 2 2/EX 12 22 32 8'-0" - EXPOSED MASONRY TO RECEIVE EPOXY FINISH W/ INTEGRAL BASE SIM. NEW WORK
11A SHOWER POD 2 2 2/EX 2 12 22 32 8'-0" - EXPOSED MASONRY TO RECEIVE EPOXY FINISH W/ INTEGRAL BASE SIM. NEW WORK
11B ADA SHOWER POD 2 2/EX 2/EX 2 12 22 32 8'-0" - EXPOSED MASONRY TO RECEIVE EPOXY FINISH W/ INTEGRAL BASE SIM. NEW WORK
12A JC EX 2 2 EX 12 22 32 8'-0" - EXPOSED MASONRY TO RECEIVE EPOXY FINISH W/ INTEGRAL BASE SIM. NEW WORK
13A STORAGE 1 EX EX EX 11 21 31 8'-0" - -
2328
ASSEMBLIES
AND
SCHEDULES
A0-1
SNOITAVONER
KOORBTSEW
DWP
DAOR
KRAP
582
ENIAM
,KOORBTSEW
c 2021 RYAN SENATORE
ARCHITECTURE
RYAN SENATORE
ARCHITECTURE
500 CONGRESS STREET, SUITE 2
PORTLAND, MAINE 04101
O: 207-747-5159
C: 207-650-6414
senatorearchitecture.com
CONSULTANTS:
Y
L
N
On
o
3
Ti
t2
Nc
0
u
P R I n s t r 3 , 2
S oR
SCE
REVISEIONSr : B
Ro
O
f
G t T
OoC
N
R O
P
DATE:
PROJECT No.
DRAWN BY: RRT, ES
CHECKED BY: RJS
SCALE: AS NOTED
SHEET TITLE:

c 2021 RYAN SENATORE ARCHITECTURE
SNOITAVONER ENIAM DAOR ,KOORBTSEW KOORBTSEW KRAP 582 DWP
RYAN SENATORE ARCHITECTURE 500 CONGRESS STREET, SUITE 2 PORTLAND, MAINE 04101 O: 207-747-5159 C: 207-650-6414 senatorearchitecture.com
CONSULTANTS: Y L N On o 3 Ti t2 Nc 0 u P R I n s t r 3 , 2 S oR
SCE REVISEIONSr : B Ro O f G t T OoC N R O P
DATE:
PROJECT No. 2328
DRAWN BY: RRT, ES
CHECKED BY: RJS
SCALE: AS NOTED
SHEET TITLE: NEW WORK PLANS
3'-5"
"9-'1
W NB 2'-0" MAX 1'-6"
2'-0" MAX 1'-6"
D NA
2'-11"
NA
B NC
NA ADA SHOWER POD 11B 6'-11"
ALIGN
NEW 2' WHOLE FINISH MOISTU LOCATI M, TYP. K - SEE
NEW FIRE A STROBE/HO COORDINA LOCATION LARM RN - TE FINAL WITH FD
NEW 2' WHOLE FINISH MOISTU LOCATI X 4' ACT SYSTE AREA OF WOR SCHEDULE FOR RE RESISTANT ONS M, TYP. K - SEE
NEW FIRE A STROBE/HO COORDINA LOCATION LARM RN - TE FINAL WITH FD
NEW FI STROB COORDIN LOCATION EXIT SIGN DOOR TO
NEW FI STRO COORDIN LOCATIO RE ALARM BE/HORN - ATE FINAL N WITH FD
NEW FI STRO COORDIN LOCATIO RE ALARM BE/HORN - ATE FINAL N WITH FD
NEW FIRE STROBE/H COORDINA LOCATION ALARM ORN - TE FINAL WITH FD
NIM RAELC "6-'2

W
D
NEW MOP SINK
42" X 20" ADA BENCH
W/ EASED CORNER
JC
12A
(4) LOCKERS -
NA SIM. EXISTING
IT
9A
30" SIDE-BY-SIDE
WASHER AND DRYER
LOCKER
10A
A
NEW DOOR AND
FRAME - PROVIDE 1 (4) LOCKERS - D B SIM. EXISTING
STEEL LINTEL ABOVE, A4-0
MATCH DOOR FINISH
LOBBY
N.I.C.
A
3
D B
BENCH A4-0
C
A
2
D B
A4-0
C ADA
SHOWER
SHOWER
POD
POD
11B
11A
6'-11"
MASONRY INFILL WALL -
MATCH COMPOSITION AND
FINISH OF AND TOOTH INTO
EXISTING MASONRY WALLS
42" X 20" ADA BENCH
W/ EASED CORNER
BREAK
N.I.C.
.NIM "6-'2 RAELC
ADA TRANSFER-TYPE
SHOWER UNIT - SEE
CUT SHEETS FOR R.O.
DIMENSIONS
SHOWER UNIT - SEE
CUT SHEETS FOR
R.O. DIMENSIONS
"7-'4
"2-'01
CENTER
DOOR
ALIGN
"9-'1
2'-11"
9'-4"
7'-4"
"5-'5
3'-5"
5'-0"
ALIGN
5"
"11-'3
12A.1 NA
FROM EDGE
OF SHELF
TO FACE OF
WASHER/
NB
DRYER
STORAGE SHELF
NEW 2' X 4' ACT SYSTEM, TYP. 2'-0" ABOVE @ 3'-10" A.F.F.
WHOLE AREA OF WORK - SEE MAX 1'-6"
FINISH SCHEDULE FOR
MOISTURE RESISTANT
LOCATIONS
NEW FIRE ALARM NA
STROBE/HORN -
COORDINATE FINAL
LOCATION WITH FD
NEW FIRE ALARM
STROBE/HORN -
COORDINATE FINAL
LOCATION WITH FD
10A.1
EXIT SIGNAGE ABOVE
DOOR TO LOBBY
NA
11B.1
NEW FIRE ALARM
STROBE/HORN -
11A.1
COORDINATE FINAL
NA
LOCATION WITH FD
NA
NEW FIRE ALARM
STROBE/HORN - COORDINATE FINAL NC LOCATION WITH FD
NA
NC
NA
2328
STORAGE
13A
13A.1
NEW WORK
PLANS
OWNER TO COORDINATE FINAL LOCATION, NEW DOOR AND
COUNT, AND SPEC OF HVAC IN AREA OF WORK FRAME - PROVIDE
WITH MECHANICAL DESIGNER IN ACCORDANCE STEEL LINTEL ABOVE,
WITH IBC 2015 AND MUBEC STANDARDS MATCH DOOR FINISH
A1-1
NEW WORK REFLECTED CEILING PLAN NEW WORK FLOOR PLAN
1 1
1/2" = 1'-0" 1/2" = 1'-0"
SNOITAVONER
KOORBTSEW
DWP
DAOR
KRAP
582
ENIAM
,KOORBTSEW
c 2021 RYAN SENATORE
ARCHITECTURE
KEY PLAN
RYAN SENATORE
ARCHITECTURE
500 CONGRESS STREET, SUITE 2
PORTLAND, MAINE 04101
O: 207-747-5159
C: 207-650-6414
senatorearchitecture.com
CONSULTANTS:
Y
L
N
On
o
3
Ti
t2
Nc 0 u P R I n s t r 3 , 2
S oR
SCE
REVISEIONSr : B
Ro
O
f
G t T OoC
N
R O
P
DATE:
PROJECT No.
DRAWN BY: RRT, ES
CHECKED BY: RJS
SCALE: AS NOTED
SHEET TITLE:

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number: P26-20 Bid Title: Cumberland St, Sewer Separation and Water Main Replacement

City of Bangor

Bid Due: 5/13/2027

Bid Number: P26-20 Bid Title: Cumberland St. Sewer Separation and Water Main Replacement

City of Bangor

Bid Due: 5/13/2027

Bid Number: P27-05 Bid Title: Partial Roof Replacement Category: Construction Status: Open Description:

City of Bangor

Bid Due: 8/05/2026

ITB 072026 Description Scarborough Public Schools (SPS) is soliciting bids to replace the

Town of Scarborough, Maine

Bid Due: 8/10/2026