LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Missouri |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Feb 23, 2026 |
| Due Date: | Apr 24, 2026 |
| Solicitation No: | W912P926RA001 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Feb 23, 2026 05:36 pm CST
- Original Date Offers Due: Apr 24, 2026 10:00 am CDT
- Inactive Policy: Manual
- Original Inactive Date: Dec 31, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Winfield , MO 63389USA
***Proposal will be submitted via EMAIL Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.
- KO CONTRACTING DIVISION 1222 SPRUCE STREET
- SAINT LOUIS , MO 63103-2833
- USA
- Angie Grimes
- angie.l.grimes@usace.army.mil
- Phone Number 314-331-8965
- Whitney Dee
- whitney.r.dee@usace.army.mil
- Phone Number 314-332-8621
- Feb 23, 2026 05:36 pm CSTSolicitation (Original)
- Feb 23, 2026 03:35 pm CST Presolicitation (Updated)
Related Document
See Also
Follow LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY
DEPT OF DEFENSE
Due by 11/16/2026
Bid # Title Ad Specs Addendum Plan Holder 26-044 Tom Ginnever Avenue and
City of Ofallon
Due by 9/22/2026
Caseyville Township Wastewater Paving Improvements 8788 StatusAccepting Bids Prebid Date 9/1/26 10:00am Bid
Drexel Technologies
Due by 9/17/2026
Status Bid Advertisement Post Date Revision Date Letting Date NEW KC District, City
Missouri Department of Transportation(MDOT)
Due by 9/23/2026