| Agency: | City of Duluth |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| Posted Date: | Mar 18, 2026 |
| Due Date: | Mar 31, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Description | Opening Date/Time | Closing Date/Time |
|
2026 LMIG project Addendum 1. |
March 18, 2026 10:00 AM |
March 31, 2026 10:00 AM |
| No. | QUESTION | RESPONSE | |
|---|---|---|---|
| 1 | Will the city allow night work on non-residential | Yes | |
| project roads? | |||
| 2 | Can you please add a pay item for Traffic loops | The intent is to stop the work at the PIB right of way and not disturb the traffic loops. | |
| that will be cut during the milling operation? | |||
| 3 | If the contractor has posted adequate signage | Yes | |
| and notice 72 hours prior to the start of work, | |||
| will the city assist in removing vehicles from | |||
| project roads? | |||
| 4 | Is it the intention of the city to mill 1.5" and | The scope varies by road. Refer to the legend on each plan sheet. | |
| pave 1.5" of 9.5 mm tp2 on project roads? | |||
| 5 | When is the anticipated Notice To Proceed on | No firm date has been set, but likely mid-May. | |
| this project? | |||
| 6 | Will the contractor be required to mill to the | This varies by road, please refer to the plan sheets. | |
| end of the radiuses on the side roads of the | |||
| project roads? | |||
| 7 | Will the city award the contract on the base bid | Base bid plus selected alternates. | |
| or the base bid plus the alternate bid as a | |||
| combined total dollar amount? |
ADDENDUM NO. 1
TO
CONTRACT DOCUMENTS
2026 LMIG PAVING PROJECT
DULUTH, GEORGIA
BIDS DUE MARCH 31, 2026
No. QUESTION RESPONSE
1 Will the city allow night work on non-residential Yes
project roads?
2 Can you please add a pay item for Traffic loops The intent is to stop the work at the PIB right
that will be cut during the milling operation? of way and not disturb the traffic loops.
3 If the contractor has posted adequate signage Yes
and notice 72 hours prior to the start of work,
will the city assist in removing vehicles from
project roads?
4 Is it the intention of the city to mill 1.5" and The scope varies by road. Refer to the legend
pave 1.5" of 9.5 mm tp2 on project roads? on each plan sheet.
5 When is the anticipated Notice To Proceed on No firm date has been set, but likely mid-May.
this project?
6 Will the contractor be required to mill to the This varies by road, please refer to the plan
end of the radiuses on the side roads of the sheets.
project roads?
7 Will the city award the contract on the base bid, Base bid plus selected alternates.
or the base bid plus the alternate bid as a
combined total dollar amount?
The following modifications are hereby introduced as a part of the Contract Documents:
1. Howell Springs Drive has been removed from the project bid documents and plans.
Addendum Prepared By
KECK & WOOD, INC.
March 17, 2026
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-55964-NONST-2026-000000040
State Government of Georgia
Bid Due: 8/13/2026
Project ID: 2026-002-RFP Title: Safe Streets for All (SS4A): Planning and Demonstration (Three
DeKalb County
Bid Due: 7/29/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-62350-NONST-2026-000000014
State Government of Georgia
Bid Due: 7/30/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-64400-NONST-2026-000000244
State Government of Georgia
Bid Due: 7/29/2026