LIT ATCT, HVAC, Replace Boiler, Controls System
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | Arkansas |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Apr 15, 2025 |
| Due Date: | May 28, 2025 |
| Solicitation No: | 6973GH-25-R-00125 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Apr 15, 2025 08:35 am CDT
- Original Date Offers Due: May 28, 2025 04:00 pm CDT
- Inactive Policy: Manual
- Original Inactive Date: May 29, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z1BA - MAINTENANCE OF AIR TRAFFIC CONTROL TOWERS
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Little Rock , AR 72202USA
BRAND NAME: Schneider Electric Ecostruxure System
******This requirement will be a Competed Small Business Setaside.*****
The Federal Aviation Administration’s, Bill and Hillary Clinton National Airport, Little Rock Air Traffic Control Tower (LIT ATCT) has three (3), 15-ton split computer room system HVACs that shall be replaced. The two 5 ton split computer room HVACs for the Power Conditioning System (PCS) in the Environmental Support Unit Building (ESU) shall also be replaced. The boiler for the facility shall be removed and replaced. Additionally, all controls shall be replaced. The system, controls, and computer shall replace all existing controls on the current HVAC equipment, and have the capacity to manage and expand to control all HVAC systems throughout the facility. The initial installation shall replace all field components and sensors associated with the Liebert Units that provide the equipment room cooling in the main building and the two Liebert units in the detached Environmental Support Building. The new system shall include all components and field wiring to make the new system fully operational when complete, including a new computer interface/control work station, with Enterprise Server software installed. Contractor shall create new EBO graphic page, and create new control schematic layout. Contractor shall provide and install all new CAT6 cable and ring topology network as required for a fully operational system. Contractor shall remove and replace the under floor leak detection system. The contractor shall furnish necessary equipment, materials, labor and supervision to perform the following work at the LIT ATCT located at 2601 David Grundfest Jr. Dr, Little Rock, AR 72202. Work within this area requires escort, and might include background checks for all onsite personnel, and must be coordinated with the FAA Contracting Officer’s Representative (COR) in advance. Adequate cooling must be maintained within the facility during the construction. Only one unit may be worked on at a time. The Contractor must submit a written plan/sequence of construction detailing the methods, equipment, points of connection, etc. that will be utilized to provide an operational air conditioning system at all times and adhere to the sequence of work proposed for removal and replacement of the HVAC units and controls.
- AAQ-700, MULTI-PURPOSE BLDG (MPB) 6500 S MACARTHUR BLVD
- OKLAHOMA CITY , OK 73125
- USA
- Jason Perry
- jason.m.perry@faa.gov
- Apr 15, 2025 08:35 am CDTSolicitation (Original)
Related Document
| May 20, 2025 | [Solicitation (Updated)] Q&As - LIT ATCT, HVAC, Replace Boiler, Controls System |
| May 27, 2025 | [Solicitation (Updated)] Amend 001 - IIJA LIT ATCT, HVAC, Replace Boiler, Controls System |
| Jun 4, 2025 | [Solicitation (Updated)] Amend 002 - IIJA LIT ATCT, HVAC, Replace Boiler, Controls System |
See Also
Project Name: CMTC DFAC 1549 Reroof Agency: Arkansas Department of Military Bid Date
State Government of Arkansas
Due by 9/24/2026
Follow CAS Education Heat Pump Active Contract Opportunity Notice ID 12441926Q0047 Related Notice
AGRICULTURE, DEPARTMENT OF
Due by 10/20/2026
Project Name: MAC 4th Floor Module D Renovations Agency: Division of Building Authority
State Government of Arkansas
Due by 10/08/2026
NOTICE TO BIDDERS OF THE INTENTION OF THE SEVIER COUNTY PUBLIC WATER AUTHORITY
Arkansas Democrat-Gazette
Due by 9/29/2026