Lisa Ln. (141st - Bonnie Brae) Waterline Replacement Project, CIP 4124
| Agency: | City of Beaverton |
|---|---|
| State: | Oregon |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 14, 2025 |
| Due Date: | Jun 5, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Lisa Ln. (141st - Bonnie Brae) Waterline Replacement Project, CIP 4124
Addenda: 0
Release Date: 5/14/2025
Due Date: 6/5/2025
This project will replace approximately 1,700 feet of 6-inch cast iron water main, originally installed in 1965, with seismically resilient 6-inch ductile iron pipe. The existing cast iron main has experienced several breaks in recent years, exacerbated by corrosive native soils, leading to a significantly shortened service life of both the pipe and fittings.
Recognized as a top replacement priority by Water Operations staff, this project will also include:
-
Replacement of all water service lines between the main and meter
-
Installation of Advanced Metering Infrastructure (AMI) meters
-
Replacement of all fire hydrants within the project limits
The existing 6-inch cast iron water main, installed in 1965, has deteriorated significantly due to corrosive native soils and has experienced frequent breaks in recent years. These failures have led to costly emergency repairs, water service disruptions, and increased maintenance efforts, impacting both operational efficiency and customer reliability.
Recognizing these challenges, Water Operations staff have designated this main as a top priority for replacement. Upgrading to a seismically resilient 6-inch ductile iron pipe will enhance system durability, reduce the risk of future failures, and improve long-term performance in seismic events or shifting ground conditions.
Beyond replacing the mainline infrastructure, this project will also modernize the system by:
-
Upgrading all water service lines between the main and meter
-
Installing Advanced Metering Infrastructure (AMI) meters for improved data accuracy and efficiency
-
Replacing all fire hydrants within the project limits to strengthen emergency response capabilities
By addressing these issues comprehensively, this project will reduce maintenance costs, improve service reliability, and enhance resilience against seismic activity, ensuring a more sustainable and efficient water system for the community.
See Also
Follow JOHN DAY DAM UNIT 10 PACKING BOX REPLACEMENT Active Contract Opportunity Notice
DEPT OF DEFENSE
Due by 12/04/2026
Follow W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning Active Contract Opportunity Notice
DEPT OF DEFENSE
Due by 11/05/2026
Follow JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
DEPT OF DEFENSE
Due by 11/19/2026
Bid Solicitation # S-KS0043-00018294 Bid Solicitation # S-KS0043-00018294 Organization Name City of Salem
State Government of Oregon
Due by 12/01/2026