Lisa Ln. (141st - Bonnie Brae) Waterline Replacement Project, CIP 4124

Agency: City of Beaverton
State: Oregon
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: May 14, 2025
Due Date: Jun 5, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description


Project ID:

Title: Lisa Ln. (141st - Bonnie Brae) Waterline Replacement Project, CIP 4124

Addenda: 0

Release Date: 5/14/2025

Due Date: 6/5/2025

Post Information
Posted At:Wed, May 14, 2025 1:57 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

This project will replace approximately 1,700 feet of 6-inch cast iron water main, originally installed in 1965, with seismically resilient 6-inch ductile iron pipe. The existing cast iron main has experienced several breaks in recent years, exacerbated by corrosive native soils, leading to a significantly shortened service life of both the pipe and fittings.

Recognized as a top replacement priority by Water Operations staff, this project will also include:

  • Replacement of all water service lines between the main and meter

  • Installation of Advanced Metering Infrastructure (AMI) meters

  • Replacement of all fire hydrants within the project limits

Background

The existing 6-inch cast iron water main, installed in 1965, has deteriorated significantly due to corrosive native soils and has experienced frequent breaks in recent years. These failures have led to costly emergency repairs, water service disruptions, and increased maintenance efforts, impacting both operational efficiency and customer reliability.

Recognizing these challenges, Water Operations staff have designated this main as a top priority for replacement. Upgrading to a seismically resilient 6-inch ductile iron pipe will enhance system durability, reduce the risk of future failures, and improve long-term performance in seismic events or shifting ground conditions.

Beyond replacing the mainline infrastructure, this project will also modernize the system by:

  • Upgrading all water service lines between the main and meter

  • Installing Advanced Metering Infrastructure (AMI) meters for improved data accuracy and efficiency

  • Replacing all fire hydrants within the project limits to strengthen emergency response capabilities

By addressing these issues comprehensively, this project will reduce maintenance costs, improve service reliability, and enhance resilience against seismic activity, ensuring a more sustainable and efficient water system for the community.

Timeline
ITB Released on:
May 14, 2025
Pre-Bid Conference (Non-Mandatory):
Last Day to Submit Questions:
May 29, 2025, 5:00pm
Question Response Deadline:
June 2, 2025, 5:00pm
Bid Due By:
June 5, 2025, 2:00pm
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Bid Title: Project No. 2024-02: Wastewater Treatment Plant Headworks Upgrade Category: Public Works

City of Ashland

Due by 10/08/2026

Follow John Day Dam Powerhouse HVAC Upgrades Active Contract Opportunity Notice ID W9127N26BA006

DEPT OF DEFENSE

Bid Solicitation # S-C03342-00017726 Bid Solicitation # S-C03342-00017726 Organization Name Washington County Blanket

State Government of Oregon

Due by 9/17/2026

Blue Heron Rd Rehabilitation & Drainage Improvements Summary CITY OF LAKE OSWEGO REQUEST

City of Lake Oswego

Due by 10/02/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.