Liquid Flow Calibrators
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Alabama |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Jun 18, 2025 |
| Due Date: | Jul 3, 2025 |
| Solicitation No: | PANRSA-25-P-0000-014828 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Jun 18, 2025 10:43 am CDT
- Original Response Date: Jul 03, 2025 12:00 pm CDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jul 18, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 6680 - LIQUID AND GAS FLOW, LIQUID LEVEL, AND MECHANICAL MOTION MEASURING INSTRUMENTS
-
NAICS Code:
- 334514 - Totalizing Fluid Meter and Counting Device Manufacturing
-
Place of Performance:
Redstone Arsenal , AL 35898USA
The US Army Contracting Command-Redstone Services & IT Solution Branch, plans to obtain information to serve as market research to help identify potential sources that can provide two
(2) Primary Standard Liquid Flow Calibrators or equivalent for a life-cycle replacement for an older similar calibrator that is becoming inoperable due to repair parts being unavailable. The equipment shall be delivered to APSL, located at Building 5435, Fowler Road Redstone Arsenal. The Liquid Flow Calibrators module shall include the following specifications or equivalent (if not brand name):
• Maximum measurement capability of 60 GPM
• Utilize CFlow+ software
• Provide temperature control of fluids (heating and cooling)
• Manual and automatic operation
• Access to temperature probes and other components to provide for easy calibration
• Fluid draw plumbing attachment
• Flow calibrators must have an uncertainty of 0.05% or better at k=2
• Flow meter calibrators must be compatible with all turbine meters and flowmeters (rotameters, frequency output, analog output)
- BASE OPERATIONS DIVISION BLDG 5201 MARTIN RD RM 200A
- REDSTONE ARSENAL , AL 35898-5200
- USA
- Taylor Siskoff
- taylor.c.siskoff.civ@army.mil
- Shalanda McMurry
- shalanda.r.mcmurry.civ@army.mil
- Jun 18, 2025 10:43 am CDTSources Sought (Original)
See Also
Follow V250 AND TMS KIT Active Contract Opportunity Notice ID W58RGZ-25-Q-0016 Related Notice
DEPT OF DEFENSE
Due by 12/01/2026
Follow Table-Top Free Space Measuring System - USDA-ARS Auburn AL Active Contract Opportunity
AGRICULTURE, DEPARTMENT OF
Due by 12/22/2026
Sourcing Project Number: SRC0000036195 Solicitation Label: (Sole Source) Qiagen MBFB QIAcube Status: Open
State Government of Alabama
Due by 9/15/2026
Sourcing Project Number: SRC0000036163 Solicitation Label: MFO FY27 Chemical Lab Supplies/Small Equipment Status:
State Government of Alabama
Due by 9/15/2026