Line Fire BAER and Suppression Repair
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | California |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jun 3, 2025 |
| Due Date: | Jun 13, 2025 |
| Solicitation No: | 127EAW25R0031 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Jun 03, 2025 02:30 pm CDT
- Original Published Date: May 22, 2025 07:21 am CDT
- Updated Date Offers Due: Jun 13, 2025 12:00 pm CDT
- Original Date Offers Due: Jun 13, 2025 12:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Jun 28, 2025
- Original Inactive Date: Jun 28, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Big Bear City , CA 92314USA
SCOPE OF CONTRACT:
The purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.
PROJECT LOCATION:
The project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.
PERIOD OF PERFORMANCE:
Projected start date: June 18, 2025.
Time for completion: 105 calendar days from the issuance of the “Notice to Proceed”.
REQUIREMENTS:
The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.
The Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.
The Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.
The Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.
The Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.
SPECIFICATIONS:
A.FHWA Standard Specification 2024
B.Forest Service Supplemental Specifications [FSSS].
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.
U.S. Customary Units and Forest Service Supplemental Specifications (FSSS).
FP-14 and Caltrans Specs where applicable.
Electronic copy can be downloaded at:
https://highways.dot.gov/federal-lands/specs/fp-24
The following standard Forest Service specifications are included as a part of this contract:
•840-2 Install
•840-2a 18 Inch Detail
San Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor’s Office.
IAW FAR 36.204, disclosed magnitude of construction cost is between $25,000 and $100,000.
NAICS CODE: 237310, Highway Street Bridge Construction, $45M
SOLICITATION NO. 127EAW25R0031
DAVIS-BACON WAGES APPLY
BONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF $35,000.00 AND ABOVE
- 333 Broadway BLVD SE
- Albuquerque , NM 871023498
- USA
- G. Jeremy Staggs
- george.staggs@usda.gov
- Phone Number 2814821968
- Jeremy Bedner
- jeremy.bedner@usda.gov
- Jun 03, 2025 02:30 pm CDTCombined Synopsis/Solicitation (Updated)
- May 29, 2025 10:42 am CDT Combined Synopsis/Solicitation (Updated)
- May 22, 2025 07:21 am CDT Combined Synopsis/Solicitation (Original)
Related Document
| May 22, 2025 | [Combined Synopsis/Solicitation (Original)] Line Fire BAER and Suppression Repair |
| May 29, 2025 | [Combined Synopsis/Solicitation (Updated)] Line Fire BAER and Suppression Repair |
| Jun 13, 2025 | [Combined Synopsis/Solicitation (Updated)] Line Fire BAER and Suppression Repair. San Bernardino National Forest. |
See Also
RFx Name: BPM013373 RFx Begin Date (UTC+0): RFSQ - SUPPORTED EMPLOYMENT CONTINUUM SERVICES
County of San Diego
Due by 10/09/2026
Project ID: 4724 Title: B.T. Collins Youth Detention Facility - Replace Obsolete HVAC
Sacramento County
Due by 10/22/2026
Specification # Project Name Link to PDF Bids Due PW 27-07 Asphalt Repairs
City of Oroville
Due by 10/07/2026
RFx Name: BPM013391 RFx Begin Date (UTC+0): RFQ - AS-NEEDED ROOFING SERVICES (RESERVED
County of San Diego
Due by 10/29/2026