Lily Lake Water Treatment Plant Upgrade
| Agency: | Haines Borough |
|---|---|
| State: | Alaska |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 13, 2025 |
| Due Date: | Feb 27, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Haines Borough intends to upgrade its Lily Lake Water Treatment Plant.
The major scope items for the upgrade are listed below:
- Tie into the existing 8” raw water line south of the WTP and route the line into the Flocculation
- Tank room. Install a 6” x 8” reducer, a 6” pressure reducing valve, a 6” flow meter, and a 6” static mixer upstream of the Flocculation Tank.
-
Replacement of original ductile iron pipe and fittings with new ductile iron pipe and fittings in
the WTP. - Replace aging pneumatic control valves in kind.
- Replace filter isolation butterfly valves and add multi-turn valves for manual throttling.
- Replace the existing pressure regulator valves.
-
Provide a new control panel and relocate the control station to the south corner of the Filter room.
Correct controls wiring issues not meeting code or industry standards as applicable. Provide
proper cable shielding and supports for cabling. -
Provide a balanced pipe arrangement so the piping to each of the three filter tanks imparts
similar head losses through the supply and return headers, associated valves, the filter tanks,
and the filtered water supply header. -
Provide a booster pump to boost the pressure of potable water to be used for backwash
application. - Slip line the 24” buried steel line between the WTP and the FAA Tank with a 10” HDPE line.
- All wetted materials shall be NSF-61 certified.
Proposals must be received by 1:00 p.m., Alaska Time, Thursday, February 27, 2025, submit proposals through Bid Express:
https://www.bidexpress.com/solicitations/38158
To ask questions, visit the posting on Bid Express.Any questions not asked through the Bid Express platform will go unanswered. To arrange a site review, contact Public Facilities Director Brad Jensen at (907) 766-6414 or bjensen [at] haines.ak.us (bjensen[at]haines[dot]ak[dot]us) .
This RFP will be opened publicly on Zoom. To join the bid opening, copy and paste the following link in to your browser.
Join Zoom Meeting
https://us06web.zoom.us/j/89235080143?pwd=RqmvY4f8daZ4Z00CDYvL6p2vK9jkW7.1
Meeting ID: 892 3508 0143
Passcode: 019047
One tap mobile
+17193594580,,89235080143#,,,,*019047# US
+12532050468,,89235080143#,,,,*019047# US
Dial by your location
• +1 719 359 4580 US
• +1 253 205 0468 US
• +1 253 215 8782 US (Tacoma)
• +1 346 248 7799 US (Houston)
• +1 669 444 9171 US
• +1 669 900 6833 US (San Jose)
• +1 301 715 8592 US (Washington DC)
• +1 305 224 1968 US
• +1 309 205 3325 US
• +1 312 626 6799 US (Chicago)
• +1 360 209 5623 US
• +1 386 347 5053 US
• +1 507 473 4847 US
• +1 564 217 2000 US
• +1 646 931 3860 US
• +1 689 278 1000 US
• +1 929 205 6099 US (New York)
Meeting ID: 892 3508 0143
Passcode: 019047
Find your local number: https://us06web.zoom.us/u/kd6jyFeO1t
See Also
+ 2026B071 - Furnish Sodium Chloride to the Municipality of Anchorage Click here
City of Anchorage
Due by 9/16/2026
ITB 2027-801 URSA MAJOR ELEMENTARY SCHOOL REPLACEMENT ITB-1-DEMOLITION Click here to be added
Anchorage School District
Due by 10/01/2026
Status Ref# Project Close Date Dayes Left Action Open 2024 - 2034 Selected
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Due by 1/01/2036
Project: On behalf of the Alutiiq Tribe of Old Harbor - site tour
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Due by 9/28/2026