| Agency: | HEALTH AND HUMAN SERVICES, DEPARTMENT OF |
|---|---|
| State: | Colorado |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) |
| Posted Date: | Apr 8, 2026 |
| Due Date: | Apr 27, 2026 |
| Solicitation No: | 75D301-26-R-73423 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment 0001 (See Attached):
A site visit is scheduled for April 13, 2026, at 0930 (MT). See attached amendment for instructions and the required Visitor Request Form (VRF).
SOLICITATION DETAILS
The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The primary work includes covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and trim, installed to match existing installations in the building. The contractor will be responsible for all materials, equipment, labor, and supervision necessary to complete the work, including demolition of delaminated ceiling portions, surface preparation, installation of FRP panels and trim, sealing, and coordination with CDC for phased access to work areas.
The project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government.
Period of Performance:
Completion is required within 180 days after Notice to Proceed.
Minimum Vendor Qualifications:
Offerors must demonstrate at least three years of experience with similar construction and interior finish projects.
| Mar 25, 2026 | [Combined Synopsis/Solicitation (Original)] Level 2 FRP Over Lab Ceilings Installation- COFC0401 |
| Apr 27, 2026 | [Combined Synopsis/Solicitation (Updated)] Level 2 FRP Over Lab Ceilings Installation- COFC0401 |
| May 7, 2026 | [Combined Synopsis/Solicitation (Updated)] Level 2 FRP Over Lab Ceilings Installation- COFC0401 |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Z--PARK CENTER WELL VALVE REPLACEMENT Active Contract Opportunity Notice ID 140L1726Q0022 Related
INTERIOR, DEPARTMENT OF THE
Bid Due: 8/07/2026
Follow NIST Boulder Building 4 Room 1318 Fire Suppression Updates Active Contract Opportunity
COMMERCE, DEPARTMENT OF
Bid Due: 8/14/2026
Follow San Juan Cattle Guard Replacements Active Contract Opportunity Notice ID 1240LT26Q0158 Related
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/27/2026
Description: C27DM4 - CMGC Pre-Const Services: SpCk Dam Rehab Proj Department: DNR -
State Government of Colorado
Bid Due: 6/30/2027