LENNOX FURNACE REPLACEMENT AT ANDERSEN ENRICHMENT CENTER

Agency: City of Saginaw
State: Michigan
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Aug 10, 2026
Due Date: Aug 18, 2026
Solicitation No: P2141-27
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Bid Number: P2141-27
Bid Title: LENNOX FURNACE REPLACEMENT AT ANDERSEN ENRICHMENT CENTER
Category: General Bids
Status: Open
Description:

The City of Saginaw is soliciting Sealed Bid Proposals for a Lennox Furnace replacement at the Andersen Enrichment Center with specifications as shown in bid document.

Publication Date/Time:
8/10/2026 12:00 AM
Closing Date/Time:
8/18/2026 3:00 PM
Special Requirements:
Interested bidders are encouraged to attend a walk-through scheduled on Thursday, August 13, 2026, at 10:00 a.m. at the Andersen Enrichment Center, 120 Ezra Rust Dr., Saginaw, MI 48601.
Related Documents:

Attachment Preview

DATE: AUGUST 10, 2026
REQUEST FOR SEALED BID PROPOSAL
CITY OF SAGINAW- CITY HALL
PURCHASING OFFICE
1315 S. WASHINGTON AVENUE, ROOM #105
SAGINAW, MICHIGAN 48601
PHONE: (989) 759-1430
SEALED BID: P2141-27
TITLE: LENNOX FURNACE REPLACEMENT AT
ANDERSEN ENRICHMENT CENTER
DUE BY: AUGUST 18, 2026, AT 3:00 PM
The City of Saginaw is soliciting Sealed Bid Proposals for a Lennox Furnace replacement at the Andersen
Enrichment Center with specifications as shown in bid document. Bids must be received in the Purchasing
Office prior to 3:00 PM on the due date to be considered.
This bid will be considered All or None and No Substitutions will be accepted..
-------------------------------------------------------------------------------------------------------------------------------------------------------
The City of Saginaw does not accept sealed bid proposals via fax or email. Bid documents are available for
download on the City of Saginaw’s web site, www.saginaw-mi.com, under the ‘Commercial Bids’ tab.
All or None’ means bidders are required to submit pricing for all years and/or all items requested. Any
proposal submitted that does not meet this requirement may be disqualified. If said bid is not listed as All or
None’, the City reserves the right to split said bid to our best benefit.
No Substitutionsmeans bidders are required to submit pricing for goods/materials as noted in specifications.
If the bid does not include no substitutions language, the respective bidder can submit pricing for a substitution
and/or alternate. You must identify the brand, model, part number, etc., method or process. Bidders may
include supporting documents. The City reserves the right to determine equivalent.
Page 1 of 9
WALK THROUGH:
Interested bidders are encouraged to attend a walk-through scheduled on Thursday, August 13, 2026, at 10:00
a.m. at the Andersen Enrichment Center, 120 Ezra Rust Dr., Saginaw, MI 48601. Bidders who have questions
on this project can contact Jay Gustin, Facilities Administrator at (989) 759-2191, jgustin@saginaw-mi.com.
SCOPE OF WORK:
The contractor shall provide all labor, materials, equipment, permits, supervision, and incidentals necessary to
remove the existing furnace and furnish and install a new Lennox 110,000 BTU, 96% AFUE Upflow Furnace at
the Andersen Enrichment Center.
The work shall include, but not necessarily be limited to, the following:
1. FURNACE REPLACEMENT
Disconnect and safely remove the existing furnace.
Furnish and install one (1) new Lennox 110,000 BTU, 96% AFUE Upflow Furnace, properly sized for
the existing application.
New furnace shall be installed in accordance with the manufacturer's installation requirements and
applicable codes.
Contractor shall verify proper operation of the furnace and all safety controls upon completion.
2. SHEET METAL WORK
Provide and install all necessary sheet metal transitions required to properly connect the new furnace to
the existing ductwork.
Fabricate transitions as necessary to provide a proper, sealed, and structurally sound connection.
Seal all joints and connections to prevent air leakage.
Provide any additional sheet metal fittings or modifications required for a complete installation.
3. MIXING BOX
Furnish and install a new mixing box as required for the HVAC system.
Connect the mixing box to the existing ductwork and new furnace.
Ensure all connections are properly sealed, and the system operates as intended.
4. GAS CONNECTION
Disconnect the existing furnace gas connection as required.
Reconnect the gas supply to the new furnace.
Provide any necessary piping, fittings, shutoff components, or other materials required for a complete
and code-compliant installation.
Contractor shall perform all required leak testing and verify proper gas pressure and operation.
Page 2 of 9
5. ELECTRICAL CONNECTION
Disconnect the existing electrical connection as required.
Reconnect the electrical supply to the new furnace.
Provide any necessary wiring, fittings, disconnects, or other components required for a complete
installation.
All electrical work shall comply with applicable codes and manufacturer's requirements.
6. PVC FLUE / VENTING
Provide and install or reconnect the required PVC flue/vent piping for the new high-efficiency furnace.
Modify the existing venting as necessary to accommodate the new furnace.
Ensure the venting system is properly supported, sealed, terminated, and installed in accordance with
the manufacturer's requirements and applicable codes.
7. AIR CONDITIONING COIL
Clean the existing A/C coil as part of the furnace replacement.
Remove accumulated dirt and debris from the coil and surrounding components.
Ensure the coil is clean and ready for proper operation following completion of the work.
Contractor shall protect the existing HVAC equipment and surrounding area during cleaning.
8. START-UP AND TESTING
Upon completion of the installation, the contractor shall:
Start and test the new furnace.
Verify proper heating operation.
Verify proper airflow.
Check gas pressure and combustion operation.
Test all safety controls.
Verify proper operation of the blower and controls.
Inspect all gas, electrical, duct, and vent connections.
Verify the system operates in accordance with the manufacturer's specifications.
9. PERMITS AND INSPECTIONS
The contractor shall obtain and pay for all required mechanical, gas, electrical, building, or other applicable
permits associated with the work.
The contractor shall coordinate and schedule all required inspections and shall be responsible for correcting
any deficiencies identified during inspection.
Page 3 of 9
10. REMOVAL AND DISPOSAL
The contractor shall remove the existing furnace and properly dispose of all removed equipment and
construction debris.
The contractor shall leave the work area clean and free of debris upon completion.
11. WARRANTY
The contractor shall provide the manufacturer's standard warranty for the new Lennox furnace and any
applicable warranties for materials and workmanship.
Contractor shall provide the Owner with all applicable warranty information and equipment documentation
upon completion.
12. BID REQUIREMENTS
The contractor's bid shall include all labor, materials, equipment, permits, disposal fees, and incidentals
necessary to provide complete and operational furnace replacement.
The contractor shall inspect the existing conditions prior to submitting a bid and shall notify the Owner of any
conditions that may affect the work or cost.
13. COMPLETION
The completed HVAC system shall be fully operational, code compliant, and ready for use upon completion of
the project.
All work shall be performed in a professional manner and in accordance with applicable Michigan Mechanical
Code, Michigan Building Code, Michigan Fuel Gas Code, Michigan Electrical Code, manufacturer's
requirements, and all other applicable regulations and standards.
Contractor shall provide a complete turnkey installation.
ITEM QTY DESCRIPTION
1
LOT LENNOX 110,000 BTU 96% AFUE UPFLOW
FURNACE REPLACEMENT AT ANDERSEN
ENRICHMENT CENTER
NO SUBSTITUTIONS
TOTAL COST
$________________
FOB: CITY OF SAGINAW
1435 S WASHINGTON AVE.
SAGINAW, MI 48601
PAYMENT TERMS: _________________
DELIVERY LEAD TIME: _________________
Page 4 of 9
SHIPPING/HANDLING
All shipping and handling charges and all costs associated with the delivery, installation and/or completion of the
product or service requested must be included in your bid, including but not limited to any titles, fees, and transfer
cost.
VENDOR COMPLIANCE
The City of Saginaw requires bidders to submit documentation furnished by the Purchasing Office indicating
compliance with the Ordinance §14.33. Vendor Compliance Forms must be on file with City of Saginaw
Purchasing Office, 1315 S. Washington Ave, Room #105, Saginaw, Michigan 48601. Forms are available for
download at www.saginaw-mi.com.
EVIDENCE OF BIDDER’S QUALIFICATIONS
Bidders may be required to submit a Statement of Qualification and/or provide satisfactory evidence that they
have been regularly engaged in the business and are reasonably familiar therewith, and that they are fully
prepared with the necessary capital, materials, and machinery to complete the work or to furnish the materials
contracted for to the satisfaction of the City.
CONTRACT ASSIGNMENTS OR TRANSFERS PROHIBITED
The assignment or transfer of a contract, or of interests in the contract, are prohibited unless approved by the
City of Saginaw Purchasing Office, respective City department and City Council.
THIRD PARTY
In the event the awarded bidder uses a third-party company to provide the goods and/or services requested, the
bidder must notify the Purchasing Office before said goods are shipped and/or services provided. At that time,
the City reserves the right to accept or reject the use of a third party. The awarded bidder shall be solely
responsible for payment to the third-party company.
AS NEEDED BASIS
The City reserves the right to request items on an ‘as needed’ basis.
CONTRACTOR COMPLIANCE
Early termination of this Agreement, with or without cause, may be made by the City with thirty (30) days
written notice to the Contractor. Upon any such early termination, Contractor shall tender to the City any work
in progress and submit an invoice to City for any fees for work performed up to the date of termination.
It is expressly understood and agreed that Contractor, and its employees and agents, are independent
contractors. Contractor, and its employees and agents, shall in no way be deemed to be and shall not hold
themselves out as the employees, servants or agents of the City. Contractor, and its employees and agents,
shall not be entitled to any fringe benefits of the City. Contractor shall be responsible for the withholding and
payment of all applicable taxes for its employees and agents, including, but not limited to, income and Social
Security taxes, to the proper Federal, state and local governments. Contractor shall carry workers’
compensation coverage for its employees, to the extent required by law, and shall provide the City with proof of
said coverage, if requested.
Contractor shall provide all services to be performed under this Contract in complete compliance with all
applicable federal, state and local laws, ordinances, rules and regulations, including those laws prohibiting
discrimination of any protected class. The laws of the State of Michigan shall control the provisions of this
Contract, and any dispute hereunder shall be in the jurisdiction of the Michigan courts.
Page 5 of 9
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Project Bid/Proposal Bid Opening Date & Time bid Tab Greenville Chip Seal Project

City of Greenville

Due by 9/29/2026

RFP-2026-PS-125 Fire Station #1 Overhead Door Operators Posted: August 27, 2026 Bid Deadline:

Chesterfield township

Due by 9/22/2026

Follow Repair HVAC Hanger 9 and Building 304 Active Contract Opportunity Notice ID

DEPT OF DEFENSE

Basic Information Negotiation 184412,1 Title BN: RESIDENTIAL CONSTRUCTION CONTRACTOR REQUEST FOR QUALIFICATIONS Negotiation

City of Detroit

Due by 2/28/2029

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.