200 Lead Service Line Replacements

Agency: City of Milwaukee
State: Wisconsin
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • 562910 - Remediation Services
Posted Date: May 14, 2026
Due Date: May 29, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


DPW Official Notice Information for #57, 2026
Official Notice Document
Plan Holders List
Accompanying documents

Bids Open: 05-29-2026

Contact: Thomas Gates 414-286-2624

Attachment Preview

>	wzv	pfbjbjh!h!	4
K?k
K?kp^RR$$$$$$$$$ld%,$!7>%Z&Z&Z&Z&5'5'5'6666666_9<P6$5'5'5'5'5'6$$Z&Z&6c*c*c*5'
$Z&$Z&6c*5'6c*c*,,Z&v?',660!7,,e<['e<,,e<$05'5'c*5'5'5'5'5'66(~5'5'5'!75'5'5'5'e<5'5'5'5'5'5'5'5'5'RX#:	CITY OF MILWAUKEE
SPECIFIC OFFICIAL NOTICE NO. 57-2026

Sealed bids will be opened on Friday, May 29, 2026 at 10:30 A.M. for LEAD SERVICE LINE REPLACEMENTS.

Bids are opened remotely and the public is welcome to attend. Submit your bid either via Bid Express or via email to  HYPERLINK "mailto:DPWbids@milwaukee.gov" DPWbids@milwaukee.gov as detailed below. Contact  HYPERLINK "mailto:DPWbids@milwaukee.gov" DPWbids@milwaukee.gov to attend the bid opening via conference call.
 
PROJECT 1: 200 LEAD SERVICE LINE REPLACEMENTS, by qualified City of Milwaukee licensed and bonded contractors. Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods including, but not limited to, the following (Pulling, Hole Hogging, Boring, and Directional Drilling). Service line replacements will be at scattered locations throughout the City of Milwaukee. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. 

Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, the procurement and distribution of water filter pitchers, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. 

Time for Completion: Lead service line replacement construction shall begin on July 6, 2026, unless otherwise approved by Milwaukee Water Works. The contractor must complete a minimum of two (2) lead service line replacements each working day. Substantial completion of all LSL replacements must be completed by December 11, 2026. All work, including permanent restoration, must be completed by April 30, 2027.
 
Contractor may work standard hours as defined in the contract documents.  Contractor may be charged inspection charges for exceeding standard working hours without prior City approval.

The Contractor shall ensure that work on the contract is performed continuously and without interruptions until all work is completed. Contractor must have a lead service line replacement crew actively working on the contract each working day until reaching the contract completion date unless otherwise directed by the City or the Construction Engineer, or in cases of inclement weather, recognized holidays, or other circumstances explicitly approved by the Construction Engineer.
 
Failure to maintain continuous work as required will result in the assessment of a per diem charge for every calendar day the Contractor does not perform work on the project, unless such delay is authorized under the conditions stated above. The Contractor is responsible for coordinating sufficient labor and equipment to meet the required production rates and ensure compliance with this requirement.
 
Contractors holding multiple Lead Service Line Replacement contracts with the City shall be responsible for providing sufficient labor and equipment to meet the required production rates of each contract and to work simultaneously on all contracts. 

The contractor will be required to mobilize to the designated location within 48 hours of notification and substantially complete the replacement within three City business days of notification. Substantial completion is considered restoration of water service to the property with a copper water service and backfilling all excavations. A maximum of one project working day is allowed for substantial completion at each site. Permanent restoration of pavement, curb and gutter, and walk must be completed within one week (five business days, weather permitting) of substantial completion. MWW reserves the right to require site restoration immediately following the service installation if deemed necessary for traffic, safety, or public welfare. MWW reserves the right to assess daily contract per diem charges on projects which exceed five (5) business days for site restoration.

Liquidated Damages, per diem: $1,000.00

The residency requirement for this project is 40% of all hours worked on the project.  One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, and 53233.

The SBE requirement for this project is 25% of the contract base bid.  The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusions (OEI) website at https://milwaukee.diversitycompliance.com/. If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553.

State of Wisconsin Disadvantaged Business Enterprise (DBE) Program contractors, including MBEs and WBEs, are encouraged to submit bid proposals.

The apprenticeship requirements for this project are: 1 Construction Craft Laborer, 1 Operating Engineer, and 1 Plumber.  If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, and 53233.

The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid.

PROJECT 2: 200 LEAD SERVICE LINE REPLACEMENTS, by qualified City of Milwaukee licensed and bonded contractors. Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods including, but not limited to, the following (Pulling, Hole Hogging, Boring, and Directional Drilling). Service line replacements will be at scattered locations throughout the City of Milwaukee. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. 

Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, the procurement and distribution of water filter pitchers, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut insta
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Solicitation Reference #: 437004-G27-0002645 Title: Transform Milwaukee Jobs Program - General Population Available

State Government of Wisconsin

Bid Due: 7/31/2026

Submit by Title Type August 11, 2026, 5:00 pm Asthma-Safe Homes Program Environmental

State of Wisconsin - Department of Health Services

Bid Due: 8/11/2026

Project ID: 427017-DBF Title: Accident Prevention & Community Safety Awareness Addenda: 0 Release

Dane County

Bid Due: 7/31/2026

Project ID: 427017-DBF Title: Accident Prevention & Community Safety Awareness Addenda: 0 Release

County of Dane

Bid Due: 7/31/2026