LBNF Liquid Argon LAr Circulation Equipment
| Agency: | ENERGY, DEPARTMENT OF |
|---|---|
| State: | South Dakota |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Nov 5, 2025 |
| Due Date: | Dec 4, 2025 |
| Solicitation No: | LBNF-372669-JD |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Nov 05, 2025 12:57 pm CST
- Original Date Offers Due: Dec 04, 2025 05:00 pm CST
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Dec 19, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 3695 - MISCELLANEOUS SPECIAL INDUSTRY MACHINERY
-
NAICS Code:
- 3332 - Industrial Machinery Manufacturing
-
Place of Performance:
Lead , SDUSA
A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice.
The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).
Scope Overview of the Supply Structure
The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW
• Vacuum Jacketed Pump Valve Box
• MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)
• Instrumentation
• Isolation Valves
• Pressure Safety Valves
• Cryogenic Equipment Protection (Platforms, Ladders and Supports
- Kirk Rd. & Pine St.
- Batavia , IL 60510
- USA
- Jeremy Duncan
- jeremyd@fnal.gov
- Phone Number 8653000443
- Nov 05, 2025 12:57 pm CSTSolicitation (Original)
Related Document
| Nov 26, 2025 | [Solicitation (Updated)] LBNF Liquid Argon LAr Circulation Equipment |
| Dec 31, 2025 | [Solicitation (Updated)] LBNF Liquid Argon LAr Circulation Equipment |
| Jan 23, 2026 | [Solicitation (Updated)] LBNF Liquid Argon LAr Circulation Equipment |