LASALLE-BACKUS ELEMENTARY SCHOOL MODERNIZATION
| Agency: | District of Columbia |
|---|---|
| State: | District of Columbia |
| Type of Government: | State & Local |
| Posted Date: | Jan 1, 2026 |
| Due Date: | Feb 2, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: LASALLE-BACKUS ELEMENTARY SCHOOL MODERNIZATION
Addenda: 0
Release Date: 12/31/2025
Due Date: 2/2/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The District of Columbia (“District”) Department of General Services (the “Department” or “DGS”) is issuing this Request for Proposals (“RFP”) to solicit design-build proposals (“Proposal(s)”) from offerors (“Offeror(s)”) interested in serving as the design-builder (the “Design-Builder” or the “Contractor”) for the modernization of LaSalle-Backus Elementary School (“LaSalle-Backus ES”), located at 501 Riggs Road NE, Washington, DC 20011 (the “Project”).
Background
The Department anticipates awarding a design-build contract (the “Agreement”, “Contract” or “Design-Build Agreement” ) to the Offeror whose Proposal is most advantageous to the District pursuant to the evaluation and award criteria in Part 3 of this RFP. The Project includes full design and construction services for LaSalle-Backus ES, which will be approximately 79,590 square-feet school facility.
The Design-Builder shall design and construct a combination of renovation of the existing and new construction to increase the existing footprint to accommodate the square footage required in the Educational Specifications (“Ed Specs(s)” or “Educational Specifications”) to bring it in line with the District of Columbia Public Schools (“DCPS”).
LaSalle-Backus ES was designed by Architect Rhees Burket and built in 1957. The original design drawings indicate a hexagonal shaped multipurpose room, however, this is not what was built. Instead, the south side of the site hosts a two-story rectangular gymnasium, set behind an angled entrance lobby. There is a one-story connector building with low ceilings connecting the entrance to a three-story classroom bar. The Department anticipates demolition of the existing gymnasium and connecting one-story structure and the maintenance of the classroom bar. The Design-Builder shall recommend a design that is most advantageous to the Project. The student population has a greater need for accessibility and therefore, two (2) elevators are required at this site. There is an extensive grade change from the east to the west of Riggs Road NE, along Madison Street NE. The project team should consider this site slope and stacking of the new construction to maximize site area for outdoor programming.
Timeline
Main entrance at LaSalle-Backus Elementary School
See Also
Follow EHRM Infrastructure Upgrades Construction - Washington, DC - Proj. 688-22-700 Active Contract
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/22/2026
https://flysba.santabarbaraca.gov/projects/fbo-redevelopment-project Submission Deadline: 9/23/2026 Submitting Organization: Santa Barbara Airport RFQ Fixed Based Operators
Airports Council International
Due by 9/23/2026
Follow United States Postal Service RFI: Construction Market Research Active Contract Opportunity Notice
POSTAL SERVICE
Due by 1/01/2027
Follow DCF NS-LEPE Site Preparation Active Contract Opportunity Notice ID NS-LEPE_Sources_Sought Related Notice
TREASURY, DEPARTMENT OF THE
Due by 10/02/2026