Lakeridge Slope Stabilization
| Agency: | City of Seattle |
|---|---|
| State: | Washington |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 23, 2025 |
| Due Date: | Aug 13, 2025 |
| Solicitation No: | PW#2024-053 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: PW#2024-053
Title: Lakeridge Slope Stabilization
Addenda: 0
Release Date: 7/23/2025
Due Date: 8/13/2025
Project Description: This Project consists of the following elements of Work: Stabilize approximately 210 feet of sloped areas along the Taylor Creek trail by constructing micropiles and a concrete grade beam, make temporary and permanent improvements to the boardwalk and small bridges along the trail needed for construction equipment access, soil restoration in disturbed areas (vegetation restoration to be done by others), construct a temporary sewer bypass, and construct a 10-foot extension of two existing stormwater culverts.
Engineer's Estimate: $1,800,000 (without sales tax)
Project Location: This Project is located in southeast Seattle in Lakeridge Park starting at the Taylor Creek trail entrance at 68 th Ave S & Holyoke Way S (north end of project site) and continuing south approximately 2,000 feet along the trail
See Also
Follow Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract Active
DEPT OF DEFENSE
Due by 12/01/2026
South Reith Road Sidewalk 250-FT East of Military Rd S to 42nd Ave
City of Kent
Due by 11/10/2026
Follow Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract Active
DEPT OF DEFENSE
Due by 12/01/2026
Project: BID - EDC - Cedar Warehouse Retaining Wall - Edmonds College Ref.
State Government of Washington
Due by 11/10/2026