| Agency: | Toho Water Authority |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 19, 2025 |
| Due Date: | Nov 20, 2025 |
| Solicitation No: | RFQu-25-014 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project Description: The Lake Marion WRF Advanced Wastewater Treatment (AWT) Project is located at 1001 Lake Marion Creek Dr., Poinciana, Florida 34759. The existing WRF has a permitted capacity of 3.0 million gallons per day (MGD) annual average flow (AADF) and utilizes Modified LudzackāEttinger (MLE) process for biological nutrient removal. The project will modify the biological nutrient removal (BNR) process by adding new baffle walls, mixers, new internal recycle (IR) pumps, air pipe modifications, reconfigurations of existing aeration basins, and a new chemical feed and storage to meet AWT standards. In addition, the project will include a new mechanical screen, pretreatment concrete and protective coating repairs at the headworks, a new odor control system, disc filter replacement, reject pond liner repairs, construction of a metal storage building, and installation of a new generator.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
ITB No. 26-05 Lakes by the Bay Parking Lot and Walkway Retrofit Project
Cutler Bay town
Bid Due: 6/25/2026
Description: Belle Glade Water Main Improvements-SE Zone 6 Water System Department: Water Utilities
Palm Beach County
Bid Due: 1/23/2030
Description: Government Center 11th and 12th floor - Minor Renovation Department: Facilities Dev
Palm Beach County
Bid Due: 7/06/2030
Description: Government Center 11th and 12th floor - Minor Renovation Department: Facilities Dev
Palm Beach County
Bid Due: 8/14/2030