Lake Hodges Hydroelectric Facility Isolation Project, Design Build Sheltered Market

Agency: San Diego County Water Authority
State: California
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: May 7, 2026
Due Date: May 27, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

The San Diego County Water Authority is soliciting proposals from qualified Design-Builders experienced in the design and construction of subaqueous steel bulkheads for the Lake Hodges Hydroelectric Facility Isolation project.

Estimated Advertising Date
Estimated Value
$1,600,000 - $2,400,000

Issue Date
4/15/26
Preproposal / Prebid Meeting Date
Apr 22, 2026 10:00:00 AM
This meeting is mandatory
Solicitation Due Date
May 27, 2026 2:00:00 PM
NIGP Codes
  • NIGP 31540 Coatings, Protective (For Metal)
  • NIGP 65880 Pipe, Steel
  • NIGP 92556 Inspecting, Structural/Engineering
  • NIGP 92588 Structural Engineering
  • NIGP 91485 Welding
  • NIGP 96226 Diving Services
Contact
Diana Lizarraga

Senior Management Analyst
dlizarraga@sdcwa.org
Links

Attachment Preview

SAN DIEGO COUNTY WATER AUTHORITY
PROJECT FACT SHEET
The San Diego County Water Authority is requesting proposals for the following design-build project.
I. PROJECT:
A. Title:
Lake Hodges Hydroelectric Facility Isolation Project, Design-Build
Specification 695
B. Owner:
San Diego County Water Authority
C. Location:
The project site is situated in the City of Escondido, between Lake Hodges and
the Olivenhain Reservoir.
II. CONTRACT DOCUMENTS:
Please visit https://www.sdcwa.org/contracting-opportunities for general information and for a link
to the electronic Contract Documents. You may also contact Diana Lizarraga, Senior Management
Analyst, at (858) 522-6808 or by email at dlizarraga@sdcwa.org.
III. PROJECT DESCRIPTION:
A. Scope of Work: The San Diego County Water Authority (Water Authority) is soliciting proposals
from qualified Design-Builders experienced in the design and construction of subaqueous steel
bulkheads for the Lake Hodges Hydroelectric Facility Isolation project (Project).
Over time, the existing isolation slide gates at the Lake Hodges Hydroelectric Facility have
deteriorated and are no longer fully functional, impeding maintenance efforts and posing safety risks.
The proposed project will design and install welded steel bulkheads that will hydraulically isolate the
hydroelectric facility’s penstocks and intake from Lake Hodges, allowing dewatering, inspection, and
maintenance of the facility.
The installation of subaqueous steel bulkheads at the Lake Hodges Hydroelectric Facility is highly
specialized work that must be performed underwater at significant depth. It requires certified
commercial divers who are also qualified underwater welders meeting strict American Welding
Society (AWS) D3.6M Class A standards, along with nondestructive testing technicians holding
advanced certifications for inspecting welds in a submerged environment.
B. Liquidated Damages: If work is not completed by the Contractor by each scheduled milestone or
completion date specified in the Contract Documents, the Water Authority will assess liquidated
damages in the amount of $1,000 for each calendar day or portion thereof until work is complete.
Please review the Contract Documents.
C. Required Insurance Coverage:
1. Commercial General Liability $5,000,000 per occurrence
2. Automobile Liability
$5,000,000 per occurrence
Q0359.201.1-1 - PROJECTfactsheet.docx
3. Maritime General Liability
$5,000,000 per occurrence
4. USLH/Maritime
Per statutory limitations,
Employer’s Liability
$1,000,000 per occurrence
5. Professional Liability
$2,000,000 per claim
6. Contractor’s Pollution Liability $2,000,000 per occurrence
$4,000,000 general aggregate
7. Builder’s Risk
An amount not less than the contract price
8. Contractor’s Equipment
On an “all risk” basis
Please review the Contract Documents for insurance and indemnification requirements.
D. Construction Cost Estimate:
The total construction cost estimate for the Project is $1.6 to $2.4 million, which includes direct
construction costs, Design-Builder indirect costs (including design), escalation, allowances, and
contingencies.
IV. PROPOSAL REQUIREMENTS:
A. Proposals shall be submitted electronically via the BidNet Direct vendor portal, no later than 2:00
p.m. on May 15, 2026.
B. Preproposal Meeting: A Pre-proposal Meeting will be held on April 22, 2026, at 10:00 a.m. in the
Water Authority’s Escondido Large Conference Room located at 610 W 5th Avenue, Escondido,
CA 92025. Attendance at the pre-proposal meeting is not mandatory, but interested proposers are
encouraged to attend.
C. A Site Visit will be conducted after the Pre-proposal Meeting on April 22, 2026, at 11:00 a.m.
Proposers shall meet Water Authority staff at 18962 Lake Dr, Escondido, CA 92029, and are
required to provide their own transportation; and carpooling is encouraged as parking at the site is
limited. Proposers are required to wear closed-toe shoes and long pants during the Site Visit. Your
RSVP to dlizarraga@sdcwa.org is appreciated.
D. Proposal Guarantee: Each Proposal shall be accompanied by a Proposal Guarantee in the form of
cash, a certified or cashier’s check, or bond executed by an admitted surety insurer in the amount
of 10 percent of the aggregate amount of the Lump Sum Price Proposal payable to “San Diego
County Water Authority.”
E. Qualifications: Professional engineer licensed in the State of California, with minimum five years
of experience in pipeline bulkhead design. Design-Builder and all subcontractors shall possess and
maintain current and valid licenses necessary to perform and complete the Work. See Section 8.0
of the Request for Proposals.
F. Department of Industrial Relations Registration: Pursuant to California Labor Code Section
1725.5, the Water Authority requires all contractors and subcontractors to be registered with the
DIR prior to submitting a bid on any public works project. Bids from contractors or subcontractors
that are not registered as required will be deemed non-responsive. The Water Authority will not
award a contract to and no contractor or subcontractor will be allowed to work on a Water
Q0359.201.1-1 - PROJECTfactsheet.docx
Authority project unless contractor and each subcontractor are registered with the DIR pursuant to
Labor Code Section 1725.5.
Contractors must submit proof to the Water Authority that all subcontractors of any tier performing
any public works portion of the work are registered with the DIR. Pursuant to Labor Code Section
1773.3, the Water Authority shall withhold final payment to the Contractor if the requirement is
not satisfied. The Contractor must complete Subcontractor List, Schedule B-1 and
Vendor/Supplier and Service Provider List, Schedule B-2 and submit with its bid.
G. Small Contractor Outreach Opportunity Program: The San Diego County Water Authority’s Small
Contractor Outreach and Opportunities Program (SCOOP) is designed to maximize participation of
diverse, qualified, small prime contractors, subcontractors, and material suppliers seeking to do
business with the Water Authority. The Contractor hired to complete the scope of work identified
in this request for bids will be determined, in part, by the Contractor’s demonstrated effort in
conducting effective outreach to small contractors. Effective implementation of the Water
Authority’s SCOOP is a requirement. If the apparent low bidder does not satisfy these SCOOP
requirements, the bidder may be deemed non-responsive.
Q0359.201.1-1 - PROJECTfactsheet.docx
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number: 2026-004 Bid Title: SITE DEVELOPMENT OF 11908, 11910, 11928, & 11936

Artesia city

Bid Due: 7/21/2026

Golden Sierra MHP Consolidation Project Project Description Tuolumne Utilities District (TUD) is seeking

Tuolumne Utilities District

Bid Due: 7/02/2026

Bid No. 26-15 Ocean View Underground Pathways; Project No. 0619 Bid Documents Plan

Lucia Mar Unified School District

Bid Due: 6/30/2026

Follow GAOA Housing Facility Upgrades Active Contract Opportunity Notice ID 127EAW26Q0027 Related Notice

AGRICULTURE, DEPARTMENT OF

Bid Due: 6/30/2026