Lake Chelan Power Tunnel Isolation System
22-12725
Labor & Materials Solicitation
Lake Chelan Power Tunnel Isolation System
Fabrication and installation of a 16 ft x 16 ft steel drop gate assembly on the power tunnel inlet at Lake Chelan Dam. Appurtenant work components will include the gate hoist structure, a 50-ton electrically driven cable hoist, inlet bulkhead slot modifications, air vent pipes, refill valves, a 125KW/156KVA liquid propane generator, concrete foundation slab, and retaining wall. Underwater and over-water work will be required.
5585800
Tammy Harn
Active
Dec 17, 2024
Feb 4, 2025
2:00 PM
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now