| Agency: | State Government of Louisiana |
|---|---|
| State: | Louisiana |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 15, 2026 |
| Due Date: | May 14, 2026 |
| Solicitation No: | JPP-50-00149809 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Number | Description | Date Issued | Bid Open Date/Time |
| JPP-50-00149809 |
Labor, Materials & Equip. Necessary for the Removal & Installation of Traffic Signals Equip. at Various Locations for JP Engineering Dept Original: JPP-50-00149809 |
04/15/2026 |
05/14/2026
2:00:00 PM CT
|
|
Contact Information for Bid # JPP-50-00149809
|
| Department | Non State - Jefferson Parish Purchasing Department |
| Section | Jefferson Parish Purchasing |
| Dept Code | JPP |
| Contact | Misty Camardelle |
| Address |
200 Derbigny St., Suite 4400 Gretna, LA 70053 |
| Phone | 504-364-2678 |
| Fax | 504-364-2693 |
| purchasing@jeffparish.net |
Bid Number 50-00149809
Provide Labor, Materials, and Equipment Necessary for Removal and
Installation of Traffic Signals Equipment at Various Locations for the
Jefferson Parish Department of Engineering
BID DUE: May 14, 2026 AT 2:00 PM
ATTENTION VENDORS!!!
Please review all pages and respond accordingly, complying with all provisions
in the technical specifications and Jefferson Parish Instructions for Bidders and
General Terms and Conditions. All bids must be received on the Purchasing
Department's eProcurement site, www.jeffparishbids.net , by the bid due date
and time. Late bids will not be accepted.
Jefferson Parish Purchasing Department
200 Derbigny Street
General Government Building, Suite 4400
Gretna, LA 70053
Purchasing Specialist II: Stacey Champagne
Email: stacey.champagne@jeffparish.gov
Phone: 504-364-2688
Bid Bond
An Electronic Bid Bond must be submitted with this bid, through one of the respective clearing
houses at www.jeffparish.net or www.centralbidding.com. To access the bonding companies on
Central Bidding, hover over the "Central Bidding" link at the top of the page and select the "Bid
Bonds" link.
The electronic bid bond number is to be placed in the required section listed on the standard
envelope. Scanned copies of bid bonds will not be accepted with your submission.
PUBLIC WORKS PROJECT NO. 2025-014-TR
BID #50-00149809
SPECIFICATIONS FOR THE MATERIALS AND INSTALLATION OF
TRAFFIC SIGNAL EQUIPMENT TO BE LOCATED AT THE INTERSECTION
OF:
SEGNETTE BLVD AND LAPALCO BLVD
SECTION I: SCOPE OF WORK TO BE PERFORMED:
A. As shown on the attached plans, the contractor shall furnish and install the following:
1. Approximately eight feet (8') of three-inch (3") and two feet (2') of one-inch (1")
PVC conduit.
2. One traffic signal controller, control cabinet, raised cabinet foundation and related
equipment according to attached plans and specifications.
3. Video Detection equipment as noted on plans and section III C-2 of these
specifications and ensuing documentation.
4. GPS preemption and communication equipment as noted on plans and in section
III C-4 of these specifications and ensuing documentation.
B. TIME OF COMPLETION: The contractor shall proceed with work within ten (10)
calendar days of receipt of work order. All work required herein shall be completed
and the signal system in operation within ninety (90)-calendar days after the Notice
to Proceed.
C. MATERIAL AND SIGNAL EQUIPMENT SUBMITTAL: All material and
signal equipment to be purchased and used by the contractor for construction of this
project shall be submitted to Jefferson Parish Traffic Engineering Division for
approval prior to purchasing.
D. STIPULATED DAMAGES: Stipulated damages shall be assessed each day that
expires 90 calendar days from the date of the Notice-to-Proceed until the work is
complete and ready for final payment. The amount shall be as specified in section
108.08, Table 108-1 of the Louisiana Standard Specifications for Roads and Bridges,
2016 edition.
E. PERFORMANCE BOND: A Payment and Performance Bond equal to the amount
of 100 % of the project will be required in accordance with Jefferson Parish
ordinances.
Page 1 of 191
PUBLIC WORKS PROJECT NO. 2025-014-TR
SECTION II. DETAILS:
A. After notification of awarding of the contract and prior to construction and
equipment purchase, the Jefferson Parish Traffic Engineering Division shall
call a pre-construction meeting. Attendees of the pre-construction meeting
shall include the Jefferson Parish Traffic Engineering Division Signal
Supervisor, the Electrical Contractor, and the Jefferson Parish Traffic
Engineering Division Project Coordinator/Engineer.
B. Jefferson Parish, upon request, will provide a plan showing the
APPROXIMATE location of all PARISH UTILITIES, i.e.: water, drainage,
sewerage. Additionally, the location of the signal poles on the signal plan are
such to avoid conflict with these utilities. It is the contractor's responsibility
to contact Louisiana One Call and other service providers (Entergy, Cox
Communications, etc.) to have all utilities located BEFORE holes are augured
and piles driven. Should there be a conflict with the location of a signal pole
during the auguring process, the contractor shall halt all construction
regarding the subject pole, and call the Traffic Engineering Office to have the
Signal Supervisor and/or the Jefferson Parish Project Engineer find another
suitable location for the subject signal pole.
C. Private utilities located on public right-of-way which are required to be
relocated or de-energized at the job site or removed entirely from the job site
to accommodate the project will be done so at no cost to the Contractor. Any
such relocation/removal has to be necessary for the construction of the project
and as described in the plans or specifications. If during construction the
Contractor determines that additional relocations/removals are necessary to
perform the work, then the approval of the engineers and the owner will be
required. If the engineers and the owner agree with the additional
relocations/removals, then it will also be accomplished at no expense to the
contractor.
D. The contractor shall secure all necessary permits and/or inspections of
the Jefferson Parish Inspection and Code Enforcement Department.
It is the responsibility of the contractor to adhere to all Jefferson
Parish ordinances, and NEC codes for electrical installation.
E. The contractor shall follow all Jefferson Parish Department of Public Works
procedures and requirements for boring and street cutting operations.
F. The contractor shall restore areas of soil, sod and other plantings to their
original state. The contractor shall repair all sidewalks, driveways, roadways,
etc., which are damaged due to signal construction.
Page 2 of 191
PUBLIC WORKS PROJECT NO. 2025-014-TR
G. The contractor shall be responsible for providing safe and expeditious
movement of traffic through the construction zones for the duration of the
construction period. This shall include but not be limited to the installation
and maintenance of such items as proper construction warning signs, signals,
lighting devices, markings, barricades, channelization, and hand signaling
devices (flagging operations) as prescribed and set forth in Part VI of the
current Manual on Uniform Traffic Control Devices as revised. The
contractor shall provide a traffic control device plan for review by the
Jefferson Parish Traffic Engineering Division prior to the start of
construction. The Traffic Control Device Plan shall be submitted at the pre-
construction meeting to be arranged by the contractor prior to beginning any
construction. Additionally, the contractor shall provide sufficient notification
(at least 48 hours) to the Jefferson Parish Traffic Engineering Division of the
necessity to close any portion of the roadway carrying vehicles or
pedestrians. At no time will more than one lane of a roadway be closed to
vehicles or pedestrians. With any such closings, adequate provision shall be
made for the safe expeditious movement of each. The contractor shall be
responsible for removal, relocation, and/or replacement of any traffic control
device in the construction area, which exists as part of the normal pre-
construction traffic control scheme. Any such actions shall be performed by
the contractor under the supervision, and in accordance with the
specifications of the Traffic Engineering Division unless otherwise specified.
The contractor should consult with the Traffic Engineering Division
immediately on any vehicular or pedestrian safety or efficiency problem
incurred as a result of construction of the project.
H. All turns in PVC conduit to be made with thirty-six inch (36") long sweep
elbows unless otherwise specified by the Traffic Engineering Division.
I. Standard elbows shall be used when entering all pull boxes.
J. The MAXIMUM allowable distance between successive pull boxes shall be
no greater than eighty feet (80').
K. Long sweep PVC elbows to be used when entering all foundations.
L. All signal cable to be continuous and unspliced from controller cabinet to
appropriate transformer base. *NOTE: NO SPLICES ARE TO BE
MADE IN STRAIN POLES OR CONDUIT UNDER ANY
CIRCUMSTANCES.
M. One complete loop of cable shall be installed in all manholes, pull boxes, and
transformer bases. The size of the loop shall be approximately equivalent to
the inner diameter of the enclosure (i.e., pull box, manhole, etc.)
N. Exact horizontal and vertical location of all traffic signal heads, foundations,
and detectors to be as specified by the Traffic Engineering Division.
Page 3 of 191
PUBLIC WORKS PROJECT NO. 2025-014-TR
O. Curbing is not to be cut when installing loop detectors.
P. All controller and cabinet electrical connections necessary for turn-on to be
made by Jefferson Parish Traffic Engineering Division.
Q. All cabinet keys to be delivered to the Traffic Engineering Division upon
completion of the project.
R. All PVC conduits installed in mast arm foundations, cabinet foundations,
pedestal foundations, and/or pull boxes shall include a bell-end or other
appropriate bushing installed on the exposed end entering the fixture
(i.e., transformer base, pull box, cabinet, etc.)
SECTION III. MATERIAL/EQUIPMENT/INSTALLATION INSTRUCTIONS:
The contractor shall furnish and install:
A. All conduit as shown on the attached drawings as follows:
1. All schedule #40 polyvinyl chloride conduit (PVC) and fittings as shown
on the attached plans, and noted in Section I for underground installation.
All joints shall be solvent welded and watertight.
Conduit to be installed a minimum of three feet (3') below grade, unless
otherwise specified by the Traffic Engineering Division. When boring
operations are employed, the contractor shall bore from one side of the
roadway to the other. All excavations on side of roadway to be restored
to their original condition.
B. Each control cabinet foundation to include one (1) ten-foot (10') ground rod.
All foundations for the mast arm assemblies and control cabinets as per
attached sketches. Foundations shall be Class S, 3800 psi concrete mix.
Anchor bolts furnished with assemblies shall be installed according to
manufacturer's specifications prior to pouring of concrete. All PVC elbows
to extend two inches (2") above the top and in the center of the foundation,
and shall include a bell-end or other appropriate bushing. Concrete shall be
tamped while pouring and allowed to cure a minimum of seven (7) days
before installation of the signal assembly.
Page 4 of 191
PUBLIC WORKS PROJECT NO. 2025-014-TR
C. All controller and cabinet related equipment as follows:
1. One (1) Siemens-Eagle M60 series, fully actuated controller unit with a
full complement of operational, programming, diagnostics capabilities,
NEMA Standard and type P cabinet Siemens EL712OH base mount with
rear door access, Siemens TF 4216 Load Bay and related equipment to
meet the attached specifications, or approved equal. Programming of
controller to be performed by Jefferson Parish Traffic Engineering
Division.
The controller shall be capable of operating within the parameter of
Yunex Traffic Advanced Traffic Management Software System.
NOTES:
* Controller, cabinet and related equipment will be shop-tested by
Jefferson Parish Traffic Engineering Division prior to field
Installation. Upon completion of testing period (two weeks after
deliver), and once the control cabinet foundation is prepared for
cabinet installation, the contractor will pick up the cabinet (without
controller), deliver it to the job site, and install it upon appropriate
foundation under supervision of the Jefferson Parish Traffic
Engineering Division.
* Procedure to replace control cabinet and foundation, in same location,
while maintain temporary signal operations:
Temporary signal operations
De-energize signal system. Pull existing signal cables from the
existing cabinet location back to the adjacent manhole. Relocate
existing/old cabinet to a temporary site adjacent to the same manhole.
Reconnect cables to the temporary old cabinet to facilitate temporary
signal operations. Energize temporary signal operations.
Cabinet foundation replacement
Remove the old cabinet foundation. Install PVC extensions to ensure
proper cable routing and connectivity. Construct new raised
foundation to support new control cabinet.
Page 5 of 191
PUBLIC WORKS PROJECT NO. 2025-014-TR
De-energize temporary signal. Disconnect cables from old cabinet and
route cables through adjacent manhole and existing PVC to new
control cabinet.
This procedure ensures an efficient transition with minimal disruption
to signal operations.
2. The following equipment to be supplied for video detection:
Six (6) Iteris Vantage Next video sensors, Part # NEXT-CAM-PAK
including mounting brackets, or approved equal.
Two (2) Iteris Shelf Mount Central Control Units, Part # NEXT-CCU-
SM2-TS2-PAK, or approved equal.
One thousand feet (1,000') CAT 5E Cable, Part # CAT5E-SHLD-
CABLE, or approved equal.
3. One (1) EDI Model MMU-16E NEMA Conflict Monitor, or approved
equal.
4. The following signal equipment to be supplied for the GPS preemption
and communication control:
One (1) Applied Information Glance TIMMS FMU with GPS Preempt AI
500-086 unit with 5-year connectivity and support plan.
See Appendix A for the following:
Control Cabinet Foundation Specifications and Detail
GPS Preemption and Communications Specifications
Control Cabinet and Related Equipment Specifications
Traffic Signal Controller Specifications
Video Detection Specifications
END SPEC.
Page 6 of 191
PUBLIC WORKS PROJECT NO. 2025-014-TR
SPECIFICATIONS FOR THE MATERIALS AND INSTALLATION OF
TRAFFIC SIGNAL EQUIPMENT TO BE LOCATED AT THE INTERSECTION
OF:
WESTWOOD DR AND LAPALCO BLVD
SECTION I: SCOPE OF WORK TO BE PERFORMED:
A. As shown on the attached plans, the contractor shall furnish and install the following:
1. Approximately eight feet (8') of three-inch (3"), three feet (3') of two-inch (2")
and three feet (3') of one-inch (1") PVC conduit.
2. One traffic signal controller, control cabinet, raised cabinet foundation and related
equipment according to attached plans and specifications.
3. Video Detection equipment as noted on plans and section III C-2 of these
specifications and ensuing documentation.
4. GPS preemption and communication equipment as noted on plans and in section
III C-4 of these specifications and ensuing documentation.
B. TIME OF COMPLETION: The contractor shall proceed with work within ten (10)
calendar days of receipt of work order. All work required herein shall be completed
and the signal system in operation within ninety (90)-calendar days after the Notice
to Proceed.
C. MATERIAL AND SIGNAL EQUIPMENT SUBMITTAL: All material and
signal equipment to be purchased and used by the contractor for construction of this
project shall be submitted to Jefferson Parish Traffic Engineering Division for
approval prior to purchasing.
D. STIPULATED DAMAGES: Stipulated damages shall be assessed each day that
expires 90 calendar days from the date of the Notice-to-Proceed until the work is
complete and ready for final payment. The amount shall be as specified in section
108.08, Table 108-1 of the Louisiana Standard Specifications for Roads and Bridges,
2016 edition.
E. PERFORMANCE BOND: A Payment and Performance Bond equal to the amount
of 100 % of the project will be required in accordance with Jefferson Parish
ordinances.
Page 7 of 191
PUBLIC WORKS PROJECT NO. 2025-014-TR
SECTION II. DETAILS:
A. After notification of awarding of the contract and prior to construction and
equipment purchase, the Jefferson Parish Traffic Engineering Division shall
call a pre-construction meeting. Attendees of the pre-construction meeting
shall include the Jefferson Parish Traffic Engineering Division Signal
Supervisor, the Electrical Contractor, and the Jefferson Parish Traffic
Engineering Division Project Coordinator/Engineer.
B. Jefferson Parish, upon request, will provide a plan showing the
APPROXIMATE location of all PARISH UTILITIES, i.e.: water, drainage,
sewerage. Additionally, the location of the signal poles on the signal plan are
such to avoid conflict with these utilities. It is the contractor's responsibility
to contact Louisiana One Call and other service providers (Entergy, Cox
Communications, etc.) to have all utilities located BEFORE holes are augered
and piles driven. Should there be a conflict with the location of a signal pole
during the auguring process, the contractor shall halt all construction
regarding the subject pole, and call the Traffic Engineering Office to have the
Signal Supervisor and/or the Jefferson Parish Project Engineer find another
suitable location for the subject signal pole.
C. Private utilities located on public right-of-way which are required to be
relocated or de-energized at the job site or removed entirely from the job site
to accommodate the project will be done so at no cost to the Contractor. Any
such relocation/removal has to be necessary for the construction of the project
and as described in the plans or specifications. If during construction the
Contractor determines that additional relocations/removals are necessary to
perform the work, then the approval of the engineers and the owner will be
required. If the engineers and the owner agree with the additional
relocations/removals, then it will also be accomplished at no expense to the
contractor.
D. The contractor shall secure all necessary permits and/or inspections of
the Jefferson Parish Inspection and Code Enforcement Department.
It is the responsibility of the contractor to adhere to all Jefferson
Parish ordinances, and NEC codes for electrical installation.
E. The contractor shall follow all Jefferson Parish Department of Public Works
procedures and requirements for boring and street cutting operations.
Page 8 of 191
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Number Description Date Issued Bid Open Date/Time 20008-21-ASC-CP-1664 PUBLIC SAFETY COMPLEX H2
State Government of Louisiana
Bid Due: 8/11/2026