Description
L1669 WEST AND NORTH OUTFALL UPGRADE, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS
L1669
Professional Consultant
If you would like to submit, please go to
(BidExpress)
.
08/19/2026
09:00:00 AM
10/01/2026
12:00:00 PM
Attachment Preview
MASSACHUSETTS PORT AUTHORITY
CAPITAL PROGRAMS DEPARTMENT
SUITE 209S - LOGAN OFFICE CENTER SUITE 209S
ONE HARBORSIDE DRIVE
EAST BOSTON MA 02128-2909
REQUEST FOR QUALIFICATIONS
L-1669 WEST AND NORTH OUTFALLS UPGRADE
LOGAN INTERNATIONAL AIRPORT
EAST BOSTON, MASSACHUSETTS
SUPPLEMENTAL INFORMATION PACKAGE
MPA CONTRACT NO. L1669 WEST AND NORTH OUTFALLS UPGRADE JULY 2026
LEGAL NOTICE
REQUEST FOR QUALIFICATIONS
The MASSACHUSETTS PORT AUTHORITY (Authority) is soliciting consulting services for MPA
CONTRACT NO. L1669 WEST AND NORTH OUTFALL UPGRADE, LOGAN INTERNATIONAL
AIRPORT, EAST BOSTON, MASSACHUSETTS. The Authority is seeking qualified multidiscipline
consulting firms or teams, with proven experience to provide professional services including planning, design,
and construction related services including resident inspection, relative to upgrades to the West and North
Outfalls at Logan International Airport. The Consultant must be able to work closely with the Authority and
other interested parties in order to provide such services in a timely and effective manner.
The consultant shall demonstrate experience in several disciplines including but not limited to Architectural
(PRIME), Civil, Structural Mechanical, Electrical, Fire Protection, Fire Alarm, IT/Communications, Security,
Plumbing, Geotechnical, Waterfront Engineering, Environmental Engineering, Landscape Architecture,
Permitting, Aviation Planning, Code Compliance, Cost Estimating, Construction Phasing, Hydraulic Modeling,
Climate Resiliency and Sustainable Design.
The contract will be work order based, and that Consultant's fee for each work order shall be negotiated;
however, the initial fee for the contract shall not exceed $5,000,000.
A Supplemental Information Package will be available, on Wednesday, August 19, 2026 on the Capital Bid
Opportunities webpage of Massport http://www.massport.com/massport/business/bids-opportunities/capital-
bids as an attachment to the original Legal Notice, and on COMMBUYS (www.commbuys.com) in the listings
for this project. If you have problems finding it, please contact cpbidquestions@massport.com. The
Supplemental Information Package will provide detailed information about Scope Of Work, Selection Criteria
and Submission Requirements.
By responding to this solicitation, consultants agree to accept the terms and conditions of Massport's standard
work order agreement. A copy of the Authority's standard agreement can be found on the Authority's web page
at http://www.massport.com/massport/business/capital-improvements/important-documents/. Consultant shall
specify in its cover letter that it has the ability to obtain requisite insurance coverage.
This submission shall be addressed to Luciana Burdi, Intl. Assoc. AIA, CCM, MCPPO, NAC, FCMAA
Chief Infrastructure Officer and received no later than 12:00 Noon on Thursday, October 1, 2026 Via Bid
Express https://www.bidexpress.com/businesses/27137/home. Any submission which is not received by
the deadline shall be rejected by the Authority as non-responsive.
MASSACHUSETTS PORT AUTHORITY
Richard A. Davey
CEO & EXECUTIVE DIRECTOR
1 REV: 07-14-2026
BACKGROUND:
Massport is committed to a comprehensive Resilience Program that proactively addresses the risks
associated with coastal flooding, storm surge, and extreme precipitation to protect critical infrastructure
and ensure operational continuity. Extensive stormwater modeling has been completed at Logan
International Airport, identifying critical infrastructure vulnerabilities and adaptation needs. While all
critical buildings are now protected from flooding risks, improvements to the airport's drainage
infrastructure and buildings at the West and North Outfalls will be addressed through this project.
The West and North Outfalls are critical components of Logan Airport's stormwater management system,
as the airport's ability to recover from severe weather events is closely tied to the performance of its
drainage infrastructure. Both outfall systems are vulnerable to sea level rise and require upgrades to
improve resilience and operational performance during extreme precipitation events and while the tide
gates are closed. Each outfall site includes a bar screen building, oil skimmer, oil/water separator, tide-
control gate, and related drainage components. See the detailed description of the work at each outfall
below.
Figure 1 - West Outfall Figure 2 - North Outfall
WEST OUTFALL
The West Outfall is Massport's largest stormwater outfall and is located at the southwestern corner of
Logan International Airport (Figure 1). The outfall serves approximately 473 acres of airport property.
The project includes construction of a new pump station building designed to accommodate four 200-
MGD pumps. Two pumps will be installed as part of this project, with the remaining two pumps planned
for a future phase. The facility will be powered by a generator, and an underground duct bank sized to
accommodate two generators will be constructed. One generator will be installed under this project, while
the second will be installed as part of a future phase.
Additional project elements include a new bypass tunnel structure, a new grinder pump, an oil/water
separator pump, flood protection improvements at the existing bar screen building, replacement of the bar
screen in the bar screen building, and a new SCADA system integrated with the Logan Building
Management System.
The selected consultant will advance the project through permitting and final design. Responsibilities will
include preparing all design and bid documents required for public bidding under Massachusetts General
2 REV: 07-14-2026
Laws Chapter 149, as well as providing Construction Administration and Resident Engineering services
during construction. In addition, the consultant will participate in coordinate with the Federal Aviation
Administration (FAA) and other regulatory agencies throughout the design and construction phases of the
project.
North Outfall
Located on the northern side of Logan Airport, the North Outfall and its interceptor drain system were
originally constructed to facilitate land reclamation within a former tidal flat area of Boston Harbor
(Figure 2 above). This project will upgrade the North Outfall operational facilities, including the bar
screen building, oil skimmer, manhole pump station, and oil-water separator. These systems were
originally installed in 1989 and upgraded in 2002 and are now approaching the end of their useful service
life. The project will design and construct a new pump station building that will house four 25-mgd
stormwater axial-flow pumps, with space allocated for three additional pumps to accommodate future
capacity needs. Upon commissioning, the station will operate with three duty pumps and one standby
pump. The building will be constructed over a 1.3-million-gallon wet well storage facility. The project
also includes flood protection improvements for the existing bar screen building and skimmer box. A new
discharge structure with riprap energy dissipation measures will be constructed as part of the North
Outfall improvements. The facility will be powered by two new emergency generators and will include a
new SCADA system integrated with the Logan Airport Building Management System.
The consultant will be responsible for preparing the final design and bidding documents for public
procurement in accordance with Massachusetts General Laws chapter 149. Construction administration
and resident engineering services will also be included in the scope of work. In addition, the consultant
will participate in coordinate with the Federal Aviation Administration (FAA) and other regulatory
agencies throughout the design and construction phases of the project.
SCOPE OF WORK:
The Authority is seeking qualified multidiscipline consulting firm or team, with proven experience to
provide professional services including planning, design, and construction related services including
resident inspection, relative to upgrades to the West and North Outfalls at Logan International Airport. These
services are expected to be provided at Logan International Airport. The Consultant must be able to work
closely with the Authority and other interested parties in order to provide such services in a timely and
effective manner.
The consultant shall demonstrate experience in several disciplines including but not limited to Architectural
(PRIME), Civil, Structural Mechanical, Electrical, Fire Protection, Fire Alarm, IT/Communications, Security,
Plumbing, Geotechnical, Waterfront Engineering, Environmental Engineering, Landscape Architecture,
Permitting, Aviation Planning, Code Compliance, Cost Estimating, Construction Phasing, Hydraulic Modeling,
Climate Resiliency and Sustainable Design.
The scope of work shall include, but not be limited to, the following:
1. Existing Conditions Review: Assess the existing conditions of each outfall, including site
constraints, infrastructure, and operational considerations.
2. Permitting Support: Evaluate design concepts and associated permitting requirements and
implications. Prepare a permitting memorandum and participate in permitting discussions with
regulatory agencies and other public entities.
3. Utilities/Waterfront Engineering: Refine design concepts in close coordination with the
Authority's Aviation Facilities Department, Massport Utilities, and the Senior Resiliency Manager.
3 REV: 07-14-2026
4. Sustainable Design, Resiliency, Net-Zero, and Nature-Based Solutions: The Authority places a
high value on sustainable design, resiliency, nature-based solutions, and the achievement of net-
zero emissions. The Consultant shall incorporate innovative and practical approaches to reducing
carbon emissions, improving air quality, enhancing climate resilience, supporting permitting
objectives, and advancing the overall sustainability of the project.
5. Code Compliance: Conduct a comprehensive code review of existing conditions and develop a
detailed strategy to ensure compliance with all applicable codes and regulations.
6. Final Design and Bid Documents: The Consultant shall work closely with the Massport Senior
Resiliency Manager to coordinate the design effort with project stakeholders. The Consultant shall
prepare design submissions demonstrating the progression of work at milestones established by the
Authority. Coordination of site surveys and the integration of survey data into the construction
documents will be critical. BIM/VDC models shall serve as the basis of design.
7. Aviation Planning: Both outfalls are located adjacent to active runway safety areas. The
Consultant shall demonstrate an understanding of applicable Federal Aviation Administration
(FAA) requirements and incorporate them into the design and construction planning process.
8. Constructability and Phasing: The project shall be planned and designed to ensure
constructability while maintaining ongoing outfall operations. The Consultant shall develop and
incorporate appropriate phasing strategies to support the Authority's requirement for continuous
access within and around the project area. The Consultant shall demonstrate expertise in
construction phasing and Lean Design and Construction methodologies and shall prepare detailed
project schedules identifying overall project duration, critical milestones, and activity-specific
durations. Schedules shall provide sufficient detail to inform the Authority and stakeholders of
anticipated operational impacts and site restrictions.
9. Bid Phase Services: The Consultant shall provide services related to Design-Bid-Build
procurement, including, but not limited to, responding to bidder inquiries, participating in pre-bid
meetings, preparing addenda as required, and evaluating bid results against the Engineer's
Estimate.
10. Construction Administration: The Consultant shall support the Authority throughout the
construction phase to facilitate timely project delivery and maintain the highest standards of quality.
Particular attention shall be given to long-lead procurement items, and the Consultant shall work
collaboratively with the Authority and Contractor to identify opportunities to expedite material
acquisition and reduce schedule impacts. Resident Engineering services shall also be provided.
11. Grant Support Services: The Consultant shall identify and advise the Authority on applicable
grant opportunities and, upon request, support or prepare grant applications and related submission
materials.
The implementation of these services will be dependent on available funding, but if fully funded, the project
is likely to take place over a three-year period.
EVALUATION CRITERIA:
The submission shall be evaluated on the basis of the following equally weighted criteria:
Demonstrated experience and knowledge of the team for similar projects of similar size and complexity
particularly important to demonstrate for the proposed Project Manager. Highlight the experience and
expertise for major sub-consultants and their assigned staff. Geographical location and proposed %
allocation to this project should be mentioned as well. Familiarity with MGL, including filed sub-bid
experience, and
(1) Project understanding and proposed technical approach including QA/QC process during
document preparation, cost management and scheduling capabilities, construction oversight,
ability to plan and perform work with minimal disruption to operations, and
(2) Demonstrated experience in integrating and managing BIM/VDC in the planning, design and
construction. Experience of utilizing Lean Design & Construction (Last Planner System(R),
4 REV: 07-14-2026
Scrum or others tools) to increase the reliability and significantly improve projects and teams'
performance, and
(3) Demonstrated project experience in sustainable and resilient high performance building and
infrastructure design and construction, including experience with low, net zero ready or net
zero emissions, water, and waste, lifecycle analysis including embodied carbon, innovative
renewable energy strategies, and building and infrastructure sustainability certification
schemes relevant to this proposal. Firms are encouraged to demonstrate "outside of the box"
thinking for examples of inclusion of sustainable practices into its projects, and specify how
those practices may be applied to this project proposal. Firms must demonstrate the capability
to incorporate design features into any project type that reflect best practices in environmental
stewardship, and
(4) Proposed approach to enhance diversity and inclusion of the proposed team to increase the
pool of consultants working on the Authority's projects. For those
MBE/WBE/VBE/SDVOBE firms proposed, please describe type and/or category of work
(i.e. architecture, structural, Lean, etc.); include the specific roles to be played by
MBE/WBE/VBE/SDVOBE, and the extent to which such MBE/WBE/VBE/SDVOBE
involvement is anticipated as of date of the proposal submission, (% goal)
The Authority recommends that each evaluation criteria is addressed in the response as a separate section.
The selection shall involve a two-step process including the shortlisting of a minimum of three firms based
on an evaluation of the Statements of Qualifications received in response to this solicitation, followed
immediately by a final selection of the consultant by the Authority. The Authority reserves the right to
interview the firms prior to final selection, if deemed appropriate.
SUBMISSION REQUIREMENTS:
Each submission shall include a Statement of Qualifications that provides detailed information in
response to the evaluation criteria set forth below and include Architect/Engineer & Related Services
questionnaires SF 330 (https://www.gsa.gov/reference/forms/architectengineer-qualifications) with the
appropriate number of Part IIs. MBE/WBE/VBE/SDVOBE certification of the prime and subconsultants
shall be current at the time of submittal and the Consultant shall provide a copy of the
MBE/WBE/VBE/SDVOBE certification letter from the Supplier Diversity Office for
MBE/WBE/VBE/SDVOBE and from the MassUCP for DBE, within its submittal.
In order to be eligible for selection, all aspects of Chapter 7C, Section 44 of the General Laws of the
Commonwealth of Massachusetts shall be satisfied including the CEO/President and majority of the firm's
Board of Directors or ownership shall be registered in the Commonwealth of Massachusetts in accordance
with the applicable provisions of the statute. Consultants shall furnish professional registration status of
the firm's board of directors or ownership. All individuals responsible for technical disciplines shall, upon
commencement of the project, be registered Architects or Engineers, in that discipline, in the
Commonwealth of Massachusetts.
The Authority may reject any application if any of the required information is not provided: Cover
Letter, Insurance Requirements, Registration of the Prime "Designer" as defined in MGL Chapter 7C
Section 44, and SF330 Part IIs for the Prime and every sub-consultant.
Make sure that the Cover Letter is "Signed under the pains and penalties of perjury", and that you
mention the Insurance Requirements and Registration of the Prime "Designer" as defined in MGL
Chapter 7C Section 44 in the Cover Letter itself.
RFQ Instructions for Electronic Submission:
5 REV: 07-14-2026
| MPA project #_Company Name-YY-MM-DD.pdf | |
|---|---|
| Example: L2302_Massport-23-04-24.pdf | |
| Files submitted via Bid Express must follow the above filing naming convention specific in the | |
| "Description" field for each document in the "Required Document Upload" table in Bid Express. The file | |
| name and description entered during the file upload process ensures each file can be readily identified by | |
| Massport. | |
| All submissions must be in .pdf format and must be in such a way that they can be read on a computer and | |
| printed on 8 12" x 11" paper, unless otherwise specified. | |
| * No more than ten pages (5 sheets) between SF 330 Section H and "other relevant materials" section |
|---|
| of the submission |
Electronic submissions will be via https://www.bidexpress.com/businesses/27137/home. Please refer to
https://www.massport.com/massport/business/bids-opportunities/capital-bids/ website for instructions on
how to submit an electronic RFQ submittal.
1. Download RFQ documents in Bid Express and fully review them before submitting your electronic
Statement of Qualifications.
2. Upload ALL required documents listed below in accordance with the instructions on Bid Express
and those in the RFQ. Failure to include all required materials or to provide materials in a format
different than that specified may have a negative effect on the evaluation or result in
disqualification.
3. Click the "Submit" button in Bid Express to review your response for completeness and to
encrypt/submit your response electronically.
File Naming Convention:
MPA project #_Company Name-YY-MM-DD.pdf
Example: L2302_Massport-23-04-24.pdf
Files submitted via Bid Express must follow the above filing naming convention specific in the
"Description" field for each document in the "Required Document Upload" table in Bid Express. The file
name and description entered during the file upload process ensures each file can be readily identified by
Massport.
All submissions must be in .pdf format and must be in such a way that they can be read on a computer and
printed on 8 12" x 11" paper, unless otherwise specified.
Please consider the number of pages being submitted, including the following:
* Resumes of the top 10 key individuals, each limited to one (1) page under SF 330, Section E,
* No more than ten (10) projects each limited to one (1) page under SF 330, Section F,
* No more than ten pages (5 sheets) between SF 330 Section H and "other relevant materials" section
of the submission
By responding to this solicitation, consultants agree to accept the terms and conditions of Massport's
standard work order agreement, a copy of the Authority's standard agreement can be found on the
Authority's web page at http://www.massport.com/massport/business/capital-improvements/important-
documents/. The Consultant shall specify in its cover letter that it has the ability to obtain requisite insurance
coverage.
This submission, shall be addressed to Luciana Burdi, Intl. Assoc. AIA, CCM, MCPPO, NAC, FCMAA
Chief Infrastructure Officer and received no later than 12:00 Noon on October 1, 2026 via Bid Express
https://www.bidexpress.com/businesses/27137/home. Any submission which is not received by the
deadline shall be rejected by the Authority as non-responsive. Any information provided to the Authority
in any Proposal or other written or oral communication between the Proposer and the Authority will not be,
or deemed to have been, proprietary or confidential, although the Authority will use reasonable efforts not
to disclose such information to persons who are not employees or consultants retained by the Authority
except as may be required by M.G.L. c.66.
6 REV: 07-14-2026
| EVENT | DATE/TIME | ||||
|---|---|---|---|---|---|
| Solicitation: Release Date and Supplemental Package Available | August 19, 2026 | ||||
| Deadline for submission of written questions | August 31, 2026 at 12:00 PM (noon) | ||||
| Official answers published (Estimated) | September 4, 2026 | ||||
| Solicitation: Close Date / Submission Deadline | October 1, 2026 at 12:00 PM (noon) |
The procurement process for these services will proceed according to the following anticipated schedule:
EVENT DATE/TIME
Solicitation: Release Date and Supplemental August 19, 2026
Package Available
Deadline for submission of written questions August 31, 2026 at 12:00 PM (noon)
Official answers published (Estimated) September 4, 2026
Solicitation: Close Date / Submission Deadline October 1, 2026 at 12:00 PM (noon)
Times are Eastern Standard Time (US).
Questions should be sent via email to CPBidQuestions@massport.com subject to the deadline for receipt
stated in the timetable above. In the subject lines of your email, please reference the MPA Project Name
and Number. Questions and their responses will be posted on Capital Bid Opportunities webpage of
Massport http://www.massport.com/massport/business/bids-opportunities/capital-bids as an attachment to
the original Legal Notice and on COMMBUYS (www.commbuys.com) in the listings for this project.
PROJECT REQUIREMENTS:
Project requirements include, but are not limited to:
Terms & Conditions:
By responding to this solicitation, consultants agree to accept the terms and conditions of Massport's
standard agreement, a copy of the Authority's standard agreement can be found on the Authority's web
page at http://www.massport.com/massport/business/capital-improvements/important-documents/.
Additional Requirements and Guidelines:
As deemed appropriate and required by the Authority or the project's needs, the consultant agrees to follow
the requirements as set forth in the Guidelines and Standards that can be found on the Authority's web page
at http://www.massport.com/massport/business/capital-improvements/important-documents.
Title VI Solicitation Notice:
The Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252,
42 U.S.C. 2000d to 2000d-4), 28 CFR 50.3, and 49 CFR Part 21, hereby notifies all bidders that it will
affirmatively ensure that any contract entered into pursuant to this advertisement, all contractors will be
afforded full opportunity to submit bids in response to this invitation and will not be discriminated against
on the grounds of the owner's race, color, national origin, sex, creed, age, or disability in consideration for
an award.
MBE/WBE/VBE/SDVOBE Participation:
The Authority is committed to helping address the disparity in the participation of minorities and women
in design. Along with the MBE/WBE/VBE/SDVOBE commitments which reflect ownership status set
forth below, the Authority's Designer Selection Panel are interested in learning about the applicant firm's
approach and commitment to diversity in its HR policy, its overall business practices and in assembling
this Project team. Firms are encouraged to be creative in assembling their teams by considering dividing
the work of a particular discipline, when appropriate, including work it would typically provide in house,
7 REV: 07-14-2026
partnering, offering opportunities to qualified firms with which it or its consultants have not previously
worked or firms that may have less experience working on public projects, and other means that provide
additional opportunities for MBE/WBE/VBE/SDVOBE firms in new ways.
Applicants, as prime firm and team lead, in their application, should directly address their approach to
enhancing diversity in assembling the team for this Project, including a clear description of each working
relationship, and in their overall HR and business practices. The Authority strongly encourages teams
composed of firms that expand the overall breadth of different firms working on Authority Projects.
Applications from MBE/WBE/VBE/SDVOBE firms as prime consultants are encouraged. Applicants that
are themselves MBE/WBE/VBE/SDVOBE certified may use their participation toward meeting the
determined work order goal for the certification they hold and will be required to bring participation by
additional firm(s) that holds the necessary certifications to meet or exceed the goals assigned. Applicants
are strongly encouraged to utilize multiple disciplines and firms to meet the MBE/WBE/VBE/SDVOBE
goals. Consultants to the prime can team within their disciplines in order to meet the
MBE/WBE/VBE/SDVOBE goals but must state this relationship.
Please note that only firms that are currently certified as MBE/WBE/VBE/SDVOBE and DBE in the
Commonwealth of Massachusetts be credited toward meeting Project MBE/WBE/VBE/SDVOBE or
DBE goals.
MASSACHUSETTS PORT AUTHORITY
Richard A. Davey
CEO & EXECUTIVE DIRECTOR
8 REV: 07-14-2026
See Also
Header Information Bid Number: BD-27-1267-SCHOO-AD-134332 Description: Student School Bus Transportation Bid Opening Date:
Commonwealth of Massachusetts
Due by 11/24/2026
title detail important dates posted date plan holders V03 MCEC Phase 1 Office
Massachusetts Convention Center Authority
Due by 11/12/2026
Header Information Bid Number: BD-26-1163-PD888-PD888-134892 Description: SNOW TRANSPORTATION 2026 Bid Opening Date: 11/12/2026
Commonwealth of Massachusetts
Due by 11/12/2026
Bid Solicitation: BD-25-1022-DMH07-7120-108311 Responses Due in 3891 Days, 20 Hours, 25 Minutes Header
Commonwealth of Massachusetts
Due by 6/01/2035