5kW Microwave Plasma CVD System
| Agency: | ENERGY, DEPARTMENT OF |
|---|---|
| State: | Illinois |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Jul 21, 2025 |
| Due Date: | Jul 25, 2025 |
| Solicitation No: | 5-S176-Q-00652-00 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Jul 21, 2025 06:03 pm EDT
- Original Date Offers Due: Jul 25, 2025 12:00 pm EDT
- Inactive Policy: Manual
- Original Inactive Date: Jul 25, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 6640 - LABORATORY EQUIPMENT AND SUPPLIES
-
NAICS Code:
- 423490 - Other Professional Equipment and Supplies Merchant Wholesalers
-
Place of Performance:
IL 60439USA
The purpose of this purchase is to satisfy the needs of the Autonomous Discovery LDRD PRJ1012745 and get a CVD reactor (full assembly or kit version) for the synthesis of single crystal boron doped diamond (BDD) fully forward compatible with the autonomous operation vision of the project:
- Microwave (2.45 GHz) Driven Chemical Vapor Deposition reactor or kit assembly with at least 2.5 kW of power, 5 kW is ideal.
- Present a large loading port to allow for, at a minimum, loading of 1 inch substrate holders, ideally this number should be two inch. Overall, something like a ICF152 is ideal to allow for easy loading and unloading of a 2” Mo puck substrate holder.
- Vacuum gate valve on the main ICF152 loading port.
- Have the ability to automatically tune the microwave power delivery, while being integrated with a circulation, dummy load, and waveguide assembly.
- Present multiple ICF70 viewports (at least 8) for future in-situ characterization. At least four of those should be placed at an angle for future in-situ ellipsometry integration.
- Present MFC configuration to allow for synthesis of BDD: four MFCs configured for H2, CH4, O2, and a flexible final H2 MFC for the boron precursor.
- Pressure controller with associated gauges
- PLD controller and process software with associated control computer and electronics. Overall, fully automated recipe/computer driven operation is critical.
Please provide the following no later than noon CDT on Friday, July 25, 2025:
- Appendix “A” Argonne Terms and Conditions for Commercial Items and Services, ANL-71-COM, dated 2/13/2023 (REVIEW AND ACCEPT)
- Proposal with details supporting the technical capability and adherance to the provided specifications (please remove pricing from this proposal)
- Lead Time
- Country of Origin (must be more than 65% USA-manufactured to be considered "Made in USA"
- Ship from Address
- Completed and signed ANL-70 Request for Quotation
- Completed and signed ANL-70B Reps and Certs
Please send any questions to the Contracting Officer. Thank you in advance for your submission.
- 9700 S. Cass Ave
- Lemont , IL 60439
- USA
- Molly Hunter
- mollyhunter@anl.gov
- Phone Number 6302523094
- Jul 21, 2025 06:03 pm EDTSolicitation (Original)
See Also
Follow High Definition Oscilloscope Active Contract Opportunity Notice ID 6-B139-Q-00422-00 Related Notice Department/Ind.
ENERGY, DEPARTMENT OF
Due by 9/30/2026
Follow 3D-Quik Hand Sprayer frames Active Contract Opportunity Notice ID 1232SA26Q1133 Related Notice
AGRICULTURE, DEPARTMENT OF
Due by 9/18/2026
Follow Streak Camera Active Contract Opportunity Notice ID 6-S176-Q-00443-00 Related Notice Department/Ind. Agency
ENERGY, DEPARTMENT OF
Due by 9/22/2026
Number Name Posted Date Opening Date View UE27-09-42 Current Transformer (CT) Test Equipment
City of Springfield
Due by 9/24/2026