Knights Creek Trunkline Rehabilitation Phase 2
| Agency: | State Government of Georgia |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 13, 2025 |
| Due Date: | Apr 10, 2025 |
| Solicitation No: | PE-66249-NONST-2025-000000042 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66249-NONST-2025-000000042 | Knights Creek Trunkline Rehabilitation Phase 2 | Valdosta, City Of |
Mar 13, 2025 @ 10:01 AM
|
Apr 10, 2025 @ 10:00 AM
|
Start Date: Mar 13, 2025 @ 10:01 AM ET
End Date:
Apr 10, 2025 @ 10:00 AM ET
Description
Sealed bids will be received by the City of Valdosta at the office of the City Engineer, City Hall Annex Building, 300 N. Lee Street, Valdosta, Georgia, until 10:00 AM, Local Time, on Thursday, April 10th, 2025 for installation of +/- 2,450 LF of 24¿ gravity sewer including related work. The work consists of clearing and grubbing of the easement area as well as supplemental work areas required by the contractor, commissioning of a preconstruction as-built survey of the existing infrastructure to serve as a performance benchmark for new construction, establishment and maintenance of an appropriately sized bypassing arrangement to maintain sustained operation of the sewer system (without overflows) during the work period, demolition of the existing gravity sewer system as necessary, installation of +/- 2,450 LF of 24¿ gravity sewer piping, installation of
six (6) new 60¿ DIA precast concrete sewer manholes, maintenance of erosion control measures during construction, final stabilization of all disturbed areas with permanent grassing, and commissioning of a final as-built survey of the newly constructed infrastructure. The new sewer system may be 24¿ SDR26 PVC gravity sewer installed by way of open cut, 24¿ DR17 HDPE gravity sewer installed by way of pipe bursting, or some combination of the two methodologies. If a blended construction methodology is intended to be utilized, the existing manhole spacing must be maintained and pipe materials must be consistent from manhole to
manhole.
| Code | Description |
| 89030 | Manholes, and Manhole Covers, Frames, Grates, Rings, Yokes, etc. |
| 91219 | Clearing and Grubbing Services |
| 91242 | Drilling and Boring Services, Horizontal Directional (HDD and HDB) |
| 91244 | Excavation Services |
| 91340 | Construction, Pipeline, Including Aerial Crossings |
| 91356 | Construction, Utility and Underground Projects |
| 91362 | Construction, Concrete, Pour-In-Place, Form, Place, Finish |
| 98815 | Fence Installation, Maintenance and Repair |
Chelsea Nevels
cnevels@valdostacity.com
229-259-3530
See Also
Project: Public Safety Complex and Fire Station #12 Roof Improvements Ref. #: 26-79-1620
Forsyth County
Due by 10/01/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-65800-NONST-2026-000000113
State Government of Georgia
Due by 10/01/2026
27-003-LH Bondsview Road Maintenance - RFB (10/15/26) September 2, 2026 Published by ntharpe
Macon Bibb County
Due by 10/15/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66984-NONST-2027-000000006
State Government of Georgia
Due by 10/14/2026