RE: BID 20260066, KINGS HIGHWAY WIDENING, ADDENDUM NO. 3
BID DUE DATE: JANUARY 14, 2026 @ 2:00 PM EST
Bidders are hereby notified that this addendum shall be made a part of the above-named proposal and contract
documents.
The following is issued to modify, and/or clarify the proposal and contract documents. These items shall have the same
force and effect as the original bid and contract documents, and bids to be submitted on the specified date shall conform
with the additions, deletions and revisions as listed herein.
ITEM # 1 QUESTIONS / ANSWERS
Q1 - In response to Q6-On Page U-6, the 12” WM is tying into a 6” and 10” Watermains. There are short sections of pipe
(6” and 10”) that there is not a bid item for. Can the 12” line continue and be reduced at the connection? By doing this
only a reducer would need to be added. Can the plans be updated to show this? We wont be bidding what is on the plans
by doing this?
A1 - There are multiple ways to make the connections in question, with the suggested scenario already approved. All
bidders are advised to bid those items in the bid sheet. Revised plans will not be provided prior to bid. Please note these
bid questions and responses become part of the contract documents.
Q2 - It is noted that the contractor is responsible for litter removal. How is that to be paid? Or can items be added for
mowing and litter removal?
A2 – Per TS-22 litter removal and mowing is inherent to the performance turf (sod) pay item. Additional pay items will not
be added.
Q3 - Will the county provide a laydown area for the contractor or recommend an area?
A3 - No. Contractor will be responsible for any lay down/staging areas they feel necessary outside the County ROW or
County owned land within the project limits. Any such use of private property shall require written approval from the
property owner prior to use.
Q4 - Will asphalt and fuel price adjustments be applicable to this project?
A4 – No, this will not be applicable.
Q5 - Is there a cross section of pond 100 with earthwork calculations?
A5 - No. Pond cross sections are included in the plans however, given the small and irregular shape, the pond earthwork
was based off average end area at top and bottom, not the cross sections.
Q6 - Currently on the roadway, there are thermo-plastic markings. Will thermo-plastic be expected to be supplied? Can a
pay item be added for this item?
A6 - No. All striping shall be paint.
BID NO. 20260066, ADDENDUM NO. 2
Q7 - On the Erosion control plans indicate there are synthetic hay bales to be installed and there is not a bid item. Can
one be added?
A7 - 104-18 Inlet Protection System has been added to the bid form. See revised bid form attached.
Q8 - Roadway Plans Indicate the separator being built on stabilized subgrade. FDOT Specs show traffic separators built
on asphalt or Stabilized Subgrade/Base. Which will be required?
A8 – Traffic separators shall be placed on stabilized subgrade at a minimum. If the contractor chooses it may be placed
on base or asphalt as well at no additional expense to the County.
Q9 - At the beginning of the project at the Walmart intersection, where there is an existing median, heading southwest
towards I-75, will all four lanes to be maintained during phase and 2 Lane Northeast travel lanes included?
A9 - No. The County prefers 4 lanes remain open as much as possible, but it is assumed that traffic will need to be
reduced to two lanes (1 lane in each direction) for certain operations. Contractor should make every effort to minimize
these lane restrictions and to have them occur during off peak hours as much as possible. The contractor’s MOT plans
should account for the necessary lane shifts and temporary signal modifications, i.e. shifting heads, adjusting detection,
adjusting timing, etc., as necessary.
Q10 - On the Sheet Pile Wall, is the Pipe Penetration to be cored or to cast in place for the Drain Pipe. And being in a
wall zone, will that portion of the pipe be required to be PVC per FDOT Standards ?
A10 - It is assumed the sheet pile at that location will be cast in place to incorporate the RCP pipe in this area.
ITEM 2: DELETE BID FORM: Please delete Bid Form on Pages 49 - 60 of the bid package and add the attached
REVISED BID FORM, ADDENDUM #3 that is attached to this addendum to the bid package.
NOTE TO BIDDERS: Please make sure REVISED BID FORM, ADDENDUM #3, are used when submitting the bid.
Otherwise bid will be deemed non-responsive for incorrect bid form submittal.
This addendum is binding and is to be considered as if contained within the original bid documents of Bid No. 20260066.
Bidders are required to acknowledge receipt of this addendum on their bid forms.
Kimberly A. Corbett, C.P.M., CPPB
Senior Division Manager - Purchasing
BID NO. 20260066, ADDENDUM NO. 2
BID FORM
KINGS HIGHWAY WIDENING
BID NO. 20260066
TO: Senior Division Manager - Purchasing
Board of County Commissioners
Charlotte County Administration Center
18500 Murdock Circle
Port Charlotte, Florida 33948-1094
The undersigned, as bidder, does hereby declare that he has read the Request for Bids, Instructions to Bidders, General Provisions,
Special Provisions, Technical Specifications & Conditions, Insurance, Safety & Health Requirements, Bid Form, Plans, Permit Fees,
MOT Policy and any other documentation for
KINGS HIGHWAY WIDENING
and further agrees to furnish all items listed on the attached Bid Form in accordance with the unit price(s) submitted. The above
specified documents are herein incorporated into the Bid Form and shall be defined as the contract documents.
TOTAL AMOUNT:
(TYPE/PRINT)
$
(NUMERIC)
Completion Time is 540 calendar days.
Liquidated Damages $3,756 per calendar day.
Please indicate by (√) that you have included the following documentation with your bid:
( ) License Requirement: FDOT Certified.
NOTE: In accordance with Florida Statues, Section 119.071(1)(b)2: Sealed bids, proposals, or replies received by an agency
pursuant to a competitive solicitation are exempt from s. 119.071(1)(b)2 and s. 24(a), Art. I of the State Constitution, except as
provided by Florida Statutes 255.0518, until such time as the agency provides notice of an intended decision or until 30 days after
opening the bids, proposals, or final replies, whichever is earlier. Upon release of the intended decision, if you wish to obtain the
quote results, you may do so by visiting our Website at http://purchasingbids.charlottecountyfl.gov/ under “Purchasing Bids Online”,
document number 260664. No information regarding the submittal will be divulged over the telephone.
OPTIONAL ELECTRONIC BID SUBMISSIONS: If your firm would like to submit your bid electronically, please visit
http://bit.ly/3TYAyKa and follow given instructions.
Name of Bidder:
(This form to be returned)
49
BID No. 20260066, REVISED BID FORM, ADDENDUM #3
SUMMARY OF PAY ITEMS FOR KINGS HIGHWAY WIDENING
BID
ITEM
102-1
SIGNING & PAVEMENT MARKING
DESCRIPTION
UOM
MAINTENANCE OF TRAFFIC
LS
104-10-3
SEDIMENT BARRIERS - SILT FENCE
LF
104-11
FLOATING TURBIDITY BARRIER
LF
104-18
INLET PROTECTION SYSTEM
EA
110-1-1
CLEARING & GRUBBING
LS
120-1
EXCAVATION & EMBANKMENT
LS
160-4-8
TYPE B STABILIZATION (LBR 70), 8" (SIDEWALK)
SY
160-4-12
TYPE B STABILIZATION (LBR 70), 12" (ROADWAY)
SY
285-709
OPTIONAL BASE, BASE GROUP 09
SY
327-70-6
MILLING EXIST ASPH PAVT, 1.5" AVG DEPTH
SY
331-2A
TYPE S-I ASPHALT CONCRETE, 3"
TN
331-2B
TYPE S-III ASPHALT CONCRETE, 1.5"
TN
400-2-2
CLASS II CONCRETE ENDWALLS
CY
425-1-331 INLETS, CURB, TYPE P-3, <10'
EA
425-1-341 INLETS, CURB, TYPE P-4, <10'
EA
425-1-351 INLETS, CURB, TYPE P-5, <10'
EA
425-1-361 INLETS, CURB, TYPE P-6, <10'
EA
425-1-461 INLETS, CURB, TYPE J-6, <10'
EA
425-1-529 INLETS, DITCH BOTTOM, TYPE C, MODIFY
EA
425-1-549 INLETS, DITCH BOTTOM, TYPE D, MODIFY
EA
425-1-581 INLETS, DITCH BOTTOM, TYPE H, <10'
EA
425-1-910 INLETS, CLOSED FLUME
EA
425-2-61
MANHOLES, P-8, <10'
EA
425-2-91
MANHOLES, J-8, <10'
EA
425-2-92
MANHOLES, J-8, >10'
EA
430-94-1
DESILTING PIPE
LF
430-175-118 PIPE CULVERT, CLASS III, ROUND, 18" S/CD
LF
430-175-124 PIPE CULVERT, CLASS III, ROUND, 24" S/CD
LF
EST
QTY
1$
7,135 $
220 $
7$
1$
1$
7,607 $
25,717 $
22,561 $
744 $
3,806 $
1,994 $
12 $
1$
1$
1$
8$
4$
1$
2$
1$
1$
2$
2$
1$
575 $
555 $
899 $
UNIT
PRICE
EXTENDED
PRICE
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Name of Bidder:
(This form to be returned)
50
BID No. 20260066, REVISED BID FORM, ADDENDUM #3
SUMMARY OF PAY ITEMS FOR KINGS HIGHWAY WIDENING (continued)
430-175-130 PIPE CULVERT, CLASS III, ROUND, 30" S/CD
LF
751 $
$
430-175-136 PIPE CULVERT, CLASS III, ROUND, 36" S/CD
LF
899 $
$
430-175-224
ELLIPTICAL CONCRETE PIPE CULVERT (HE III) (19”X30”
S/CD)
LF
220 $
$
430-984-129 MITERED END SECTION (24")
EA
1$
$
430-984-629 MITERED END SECTION (19"x30")
EA
6$
$
455-14-2
CONCRETE SHEET PILING, 8"X30"
LF
680 $
$
515-1-2
PIPE HANDRAIL - GUIDERAIL, ALUMINUM
LF
20 $
$
520-1-7
CONCRETE CURB & GUTTER, TYPE E
LF
203 $
$
520-1-10
CONCRETE CURB & GUTTER, TYPE F
LF
11,050 $
$
520-5-41
TRAFFIC SEPARATOR CONCRETE - TYPE IV, 4' WIDE
LF
526 $
$
522-1
CONCRETE SIDEWALK, 4" THICK
SY
5,643 $
$
522-2
CONCRETE DRIVEWAYS, AND MEDIAN NOSES, 6" THICK
SY
356 $
$
530-3-3
RIPRAP, RUBBLE, F&I, DITCH LINING, 12" THICK
SY
41 $
$
570-1-2
PERFORMANCE TURF, SOD
SY
21,375 $
$
751-60-1
POND MAINTENANCE ACCESS (6" GEOGRID W. NO. 57
STONE)
SY
1,149 $
$
TS 45
AS-BUILT DRAWINGS
LS
1$
$
SIGNING & PAVEMENT MARKING
700-1-111
SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I, GROUND
MOUNT, LESS THAN 12 SF
EA
8$
$
700-1-500 SINGLE COLUMN GROUND SIGN ASSEMBLY, RELOCATE
EA
8$
$
700-1-600 SINGLE COLUMN GROUND SIGN ASSEMBLY, REMOVE
EA
13 $
$
700-2-112
MULTI-COLUMN GROUND SIGN ASSEMBLY, F&I GROUND
MOUNT, 12.0-20.0 SF
EA
1$
$
700-3-101
SIGN PANEL, FURNISH & INSTALL GROUND MOUNT, UP TO
12 SF
EA
1$
$
705-10-1
OBJECT MARKER, TYPE 1
EA
3$
$
710-A
PAINTED PAVEMENT MARKINGS FIRST COAT
LS
1$
$
710-B
PAINTED PAVEMENT MARKINGS SECOND COAT
LS
1$
$
Name of Bidder: