Kiefer Landfill Groundwater Treatment Plant, Extraction Well 16 Connection
| Agency: | Sacramento County |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 16, 2025 |
| Due Date: | Aug 14, 2025 |
| Solicitation No: | 4678 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: 4678
Title: Kiefer Landfill Groundwater Treatment Plant, Extraction Well 16 Connection
Addenda: 0
Release Date: 7/16/2025
Due Date: 8/14/2025
The Project includes the furnishing of labor, materials, equipment, and other incidental work as specified for the connection of groundwater extraction well EW-16 to the treatment system, as follows:
Install pump provided by DWMR, provide and install well station piping, valves, meters, electrical pedestal including VFD, and concrete well pad. Provide and install 800 ft of subsurface water pipe and gravel road to reach existing infrastructure. Provide and install approx. 2700 ft of 4-wire power cable in new and existing conduits. Install PLC and radio communications components provided by DWMR.
Sacramento County Department of Waste Management & Recycling (DWMR) Kiefer Landfill Groundwater Treatment Plant (KTP), located across Kiefer Blvd from the landfill, includes 15 extraction wells connected to a treatment facility.
E xtraction well EW-16 was drilled and constructed in 2024, but requires pump installation and connection to the existing treatment network, near its southwestern edge at extraction well EW-9. An addendum to the Kiefer expansion EIR, PLER2024-00046 was issued for this project in 2024 by the County of Sacramento Office of Planning and Environmental Review, with a finding of no substantial impact. Biological species surveys of the well site and proposed pipeline were conducted in 2024. A South Sacramento Habitat Conservation Plan permit authorization, SHCP 2024-0010, was issued in 2024. An addendum to this authorization was issued in 2025 to add a gravel road to the well site.
See Also
Follow SOURCES SOUGHT FOR BULK LIQUID PROPANE GAS (LPG) SUPPLY AND DELIVERY FOLLOW-ON
DEPT OF DEFENSE
Due by 11/23/2026
Project ID: Title: Liquid Oxygen Equipment Prepurchase Addenda: 0 Release Date: 10/21/2026 Due
Las Virgenes Municipal Water District
Due by 12/02/2026
Follow Liquid Oxygen Bulk Tank Rental and Refill Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 11/24/2026
OCA PUC HHW | Lime, Unslaked Events Search Event : SFGOV-0000012114
City and County of San Francisco
Due by 11/30/2026