| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| Posted Date: | Apr 21, 2026 |
| Due Date: | May 21, 2026 |
| Solicitation No: | 274-ES-FO-FY26-KeeterTrainingCenterWaterproofing |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Solicitation Number: | 274-ES-FO-FY26-KeeterTrainingCenterWaterproofing |
| Project Title: | Keeter Training Center Waterproofing |
| Description: | Excavation and removal of the soil against the building elevation to waterproof the below grade structure, and to back fill with new soil. During the removal of soil, landscaping and utilities will need to be considered. An inspection of the building drainage system will reveal any roof leader or foundation drain damage or malfunction. The contractor is expected to repair and replace as needed. Additionally, the ramped walkway to the building’s entrance forms a border of the excavation area. This ramp will require temporary shoring to be provided by the contractor during the waterproofing excavation. |
| Opening Date: | 5/21/2026 2:00 PM |
| Posted Date: | 4/21/2026 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-ES-FO-FY26-KeeterTrainingCenterWaterproofing
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2026-05-21T14:00:00.0000000
|
Posted Date
*
2026-04-21T12:48:39.0000000Z
|
Primary Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
2026-04-30T04:00:00.0000000Z
|
Special Instructions
Bid Agent: Steven.Chelini@raleighnc.gov
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Patrick Barbour
|
|||
|
Description
Excavation and removal of the soil against the building elevation to waterproof the below grade structure, and to back fill with new soil. During the removal of soil, landscaping and utilities will need to be considered. An inspection of the building drainage system will reveal any roof leader or foundation drain damage or malfunction. The contractor is expected to repair and replace as needed. Additionally, the ramped walkway to the building’s entrance forms a border of the excavation area. This ramp will require temporary shoring to be provided by the contractor during the waterproofing excavation.
|
|||
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Solicitation Number: 287-19787-DS Project Title: East Carolina University Description: Renovation for the ECU
State Government of North Carolina
Bid Due: 6/12/2026
Follow FY26-FY31 JIOP Commercial Range Services BPA at Fort Bragg Active Contract Opportunity
DEPT OF DEFENSE
Bid Due: 2/09/2031
IFB 2026-025 Union County Group Home Renovations Department: Procurement & Contract Management Bid
Union County
Bid Due: 6/04/2026
Bid/RFP Number Description Due Date/Time Addenda Items Contact 09-057 Operation of Firearms Education
Wake County
Bid Due: 5/27/2029