26-13-2? Justice Center Boilers
-
Engineers Estimate: $459,166.00
-
Project Description: Base Bid to include the removal of (2) existing hot water heating boilers with (1) new boiler to be replaced in a configuration similar to existing. Piping for the second boiler shall be stubbed out and capped for future replacement. A rental boiler shall be included to maintain building heating during the project. A new opening and roll door in the boiler room wall to be installed to accommodate boiler removal and installation as well as future service. The door to the loading dock area will be replaced with a pair of 3'-0" x 8'-0" hollow metal doors and hardware to accommodate boiler replacement.
-
Link to LAPAC:
Click Here
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now