Jordan Hughes
|
Header Information
|
|
Bid Number:
|
BD-25-1502-FHA00-01-130096
|
Description:
|
Jordan Hughes
|
Bid Opening Date:
|
06/22/2026 02:00:00 PM
|
|
Purchaser:
|
Jordan Hughes
|
Organization:
|
Fitchburg Housing Authority
|
|
Department:
|
FHA001 - Executive Office
|
Location:
|
01 - Executive Office
|
|
Fiscal Year:
|
25
|
Type Code:
|
SS
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
06/02/2026 08:29:54 AM
|
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
|
|
Bulletin Desc:
|
The FITCHBURG HOUSING AUTHORITY, the Awarding Authority, invites sealed bids
from Contractors for the Emergency Structural Repairs 2 at State Aided Development:
Canton Valley (705-2, previously 667-1) in Fitchburg, Massachusetts, in accordance
with the documents prepared by PARE CORPORATION.
|
|
|
Ship-to Address:
|
Cameron Davis
50 Day Street, Ste#1
Fitchburg, MA 01420
US
Email: cdavis@fitchburgha.org
Phone: (978) 540-4039
|
Bill-to Address:
|
Accounts Payable
Fitchburg Housing Authority
50 Day Street, Ste#1
Fitchburg, MA 01420
US
Email: AP@fitchburgha.org
Phone: (774) 519-5573
|
Print Format:
|
Bid Print
|
|
Required Quote Attachments
|
|
Desired Attachment Name
|
Description
|
|
|
|
Item # 1:
|
The Project consists of but not limited to:
This project applies to all eight buildings within the development. 23 units are included in
the base scope. Within the units identified, the finish floor is to be replaced. In the
process of replacing the finish floor, the underlayment will be removed as needed to
receive the new flooring and expose any underlying structural deficiencies. The primary
cause of these deficiencies have been identified as water and termite damage in certain
units. Where damage is most severe, this includes replacement of the subfloor planking
and sistering of the joists which have been compromised. The objective is to achieve the
required flatness and an improved level condition for each floor. Where this cannot be
achieved by replacement of the underlayment alone, cementitious self-leveling
underlayment will be required. Scope includes limited wall finishing where framing was
exposed during the structural investigation. Some timber beams accessible through the
crawlspaces have been identified to receive epoxy repair for checking. Wood blocking
under an interior door jamb is included to mitigate defects in the original construction.
Scope includes abatement of any 9"x9" asphalt tiles containing asbestos.
|
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
This item is narrative
|
|
|
|
|
Item # 2:
(
72-13
-
00
)
|
The Project consists of but not limited to:
This project applies to all eight buildings within the development. 23 units are included in
the base scope. Within the units identified, the finish floor is to be replaced. In the
process of replacing the finish floor, the underlayment will be removed as needed to
receive the new flooring and expose any underlying structural deficiencies. The primary
cause of these deficiencies have been identified as water and termite damage in certain
units. Where damage is most severe, this includes replacement of the subfloor planking
and sistering of the joists which have been compromised. The objective is to achieve the
required flatness and an improved level condition for each floor. Where this cannot be
achieved by replacement of the underlayment alone, cementitious self-leveling
underlayment will be required. Scope includes limited wall finishing where framing was
exposed during the structural investigation. Some timber beams accessible through the
crawlspaces have been identified to receive epoxy repair for checking. Wood blocking
under an interior door jamb is included to mitigate defects in the original construction.
Scope includes abatement of any 9"x9" asphalt tiles containing asbestos.
|
|
U N S P S C Code:
|
72-13-00
General building construction
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now
See Also
title detail important dates posted date plan holders M7 and M8 Hynes Escalators
Massachusetts Convention Center Authority
Bid Due: 8/12/2026
Bid Solicitation: BD-23-1031-ADMIN-ADM07-86598 Responses Due in 1914 Days, 3 Hours, 7 Minutes Header
Commonwealth of Massachusetts
Bid Due: 6/30/2028
Follow Amendment #8: Common Very Low Frequency Receiver (VLF) Increment 2 (CVRi2) Modernization
DEPT OF DEFENSE
Bid Due: 8/24/2026
Header Information Bid Number: BD-27-1301-2-2-131486 Description: RFP - Town-Wide Voice Over IP (VoIP)
Commonwealth of Massachusetts
Bid Due: 8/12/2026