Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Apr 08, 2026 01:09 pm PDT
- Original Date Offers Due: May 08, 2026 01:00 pm PDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: May 23, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2KA - REPAIR OR ALTERATION OF DAMS
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Rufus , ORUSA
The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.
Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3.
Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.
The following information represents the project objectives:
- Removal and replacement of damaged pump shafts and bearings.
- Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
- Precision machining (true-up) of shafts, bearing housings, and diffuser components.
- Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
- On-site reassembly, shaft alignment, gearbox installation, and system balancing.
- Testing of the completed pump unit(s) to verify functional performance.
- Delivery of updated operation and maintenance manuals, drawings, and spare parts.
- KO CONTRACTING DIVISION 333 SW FIRST AVE
- PORTLAND , OR 97204-3495
- USA
- Kristel Flores
- Kristel.M.Flores@usace.army.mil
- Cory Pfenning
- cory.r.pfenning@usace.army.mil
- Apr 08, 2026 01:09 pm PDTSolicitation (Original)
- Mar 11, 2026 08:55 pm PDT Presolicitation (Original)
Related Document
| Feb 9, 2026 | [Presolicitation (Original)] John Day Fish Rehabilitation |
| Apr 9, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| Apr 22, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| May 1, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| May 4, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| May 6, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| May 12, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| May 21, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| Jun 16, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
See Also
Bid Title: Project No. 2024-02: Wastewater Treatment Plant Headworks Upgrade Category: Public Works
City of Ashland
Due by 10/08/2026
Follow John Day Dam Powerhouse HVAC Upgrades Active Contract Opportunity Notice ID W9127N26BA006
DEPT OF DEFENSE
Bid Solicitation # S-C03342-00017726 Bid Solicitation # S-C03342-00017726 Organization Name Washington County Blanket
State Government of Oregon
Due by 9/17/2026
Follow 70Z08826B0000123 -- Bid Abstract: Repair & Replace ATON, USCG Base Tongue Point/Columbia
HOMELAND SECURITY, DEPARTMENT OF