| Agency: | Jea |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Dec 2, 2024 |
| Due Date: | Dec 6, 2024 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
JEA seeks Responses (the “Solicitation) to development of a Combined Cycle Power Generation facility at the St. Johns River Power Park. JEA is evaluating development of a Combined Cycle Power Generation facility at the St. Johns River Power Park. The facility is expected to be sized to deliver between 525 to 700 MW of net plant output using an advanced class gas turbine in a 1x1 multi shaft configuration. Cycle heat rejection will consist of a surface condenser and mechanical draft cooling tower. Duct burners shall be sized to provide an increase of 15% in STG output across the full range of ambient conditions. The maximum plant output shall be delivered under hot day ambient conditions defined herein.
The following specifications are for the design and supply of one multi shaft Power Island consisting of one advanced class H/J class Combustion Turbine Generator (CTG), a Steam Turbine Generator (STG) and a triple pressure Heat Recovery Steam Generator (HRSG). CTG shall be equipped with a Dry Low NOx (DLN) combustion system designed for firing natural gas fuel and backup fuel oil. The STG shall be configured as tandem compound reheat unit with a side exhaust dual flow or an axial exhaust LP cylinder. The triple pressure HRSG shall be a horizontal natural circulation design. All Power Island Equipment (PIE) along with associated auxiliaries shall be located outdoors and shall be provided with manufacturer’s standard weather proof acoustic enclosures.
Control systems for the CTG and STG shall be designed to interface with the Purchaser’s plant distributed control system (DCS). The facility will be operated primarily from the Purchaser furnished DCS.
The facility is located 2 miles inland, equipment design including CTG inlet air filtration shall be based on proven design concepts, which have been applied successfully in the power generation industry and met performance expectations under commercial operation for similar applications. The offered equipment shall have a minimum of 8,000 hours of cumulative operating experience at each location and a minimum of 3 different sites.
Supplier shall identify equipment which does not meet this requirement. All equipment furnished under this specification shall comply with applicable FM Global Property Loss Prevention Standards and Data Sheets. Suppliers shall confirm compliance with their proposals.
USE THIS LINK TO ACCESS THE SOLICITATION VIA ZYCUS
https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/890414/
Mandatory Pre-Response Meeting: September 23, 2024
Solicitation Due Date: December 3, 2024
Solicitation Due Date: December 6, 2024
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project ID: Title: Police K-9 Compound (Project No. 22209-118) Addenda: 0 Release Date:
City of St. Petersburg
Bid Due: 6/09/2026
RFQ-26-C-00022 26-C-00022 Howard F. Curren AWTP Aquifer Recharge Wells Pumping System Design-Build View
City of Tampa
Bid Due: 6/11/2026
Project ID: Y26-740 Title: Reams Road Improvement Project - Summerlake Park Blvd to
Orange County
Bid Due: 6/04/2026
Follow P683 AIRCRAFT ENGINE REPAIR FACILITY, NAVAL AIR STATION(NAS), JACKSONVILLE, FLORIDA Active Contract
DEPT OF DEFENSE
Bid Due: 6/09/2026