James J. Eagan HVAC Replacement
| Agency: | City of Florissant |
|---|---|
| State: | Missouri |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 28, 2026 |
| Due Date: | Mar 20, 2026 |
| Solicitation No: | 25-0239 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: 25-0239
Title: James J. Eagan HVAC Replacement
Addenda: 0
Release Date: 2/27/2026
Due Date: 3/20/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
General work description: The City of Florissant is seeking sealed bids from qualified HVAC contractors to provide all labor, equipment, materials, and supervision necessary to remove and replace the existing air-cooled chiller system at the James J. Eagan Community Center.
Equipment Specification
Contractor shall furnish and install one (1) air-cooled scroll chiller meeting or exceeding the following specifications:
-
Manufacturer: Carrier (or approved equal)
-
Model: 30RCM1526S055-7-2
-
Type: Air-Cooled Scroll Chiller
-
Cooling Capacity: ~142.6 Tons
-
Refrigerant: R-32
-
Dual Refrigerant Circuits
-
Brazed Plate Heat Exchanger (BPHE)
-
Microchannel Condenser Coil
-
Variable Condenser Fans (High-Efficiency)
-
BACnet IP & MS/TP Compatibility
-
7” Control Display with Quick Restart/Capacity Recovery
-
Low Sound Package with Aero-Acoustic Fans
-
Single Point Power
-
Evaporator Heater (Freeze Protection)
All equipment shall be new, factory-authorized, and AHRI-certified.
Scope of Work
The contractor shall provide turnkey installation including, but not limited to:
1. Demolition & Removal
-
Drain, disconnect, and remove existing chiller.
-
Recover refrigerant and dispose of equipment per EPA regulations.
2. Rigging & Placement
-
Provide crane and rigging services.
-
Set and secure new chiller on existing pad/structure.
3. Mechanical Installation
-
Modify and reconnect piping as required.
-
Reconnect to existing building systems.
-
Reuse existing shutoff valves where feasible.
-
Insulate piping and components as needed.
4. Electrical & Controls
-
Reconnect existing electrical service.
-
Re-land existing control wiring.
5. System Start-Up
-
Fill system, test for leaks, and purge air.
-
Provide factory startup and commissioning.
-
Verify full operational performance.
5. Contractor Responsibilities
-
Field verify all dimensions and utilities.
-
Coordinate work with City staff.
-
Maintain site safety and protection.
-
Provide cleanup and debris disposal.
-
Obtain permits if required.
-
Comply with all applicable codes.
Timeline
Passcode: F47bSG
See Also
Leon Storm Siren Improvements - Leon, KS 25-PF-020 StatusAccepting Bids Bid Date 9/23/26
Drexel Technologies
Due by 9/23/2026
Ash & Cedar Street KDOT Cost Share Project - Pleasanton, KS 25-1287 StatusAccepting
Drexel Technologies
Due by 10/01/2026
Leon Storm Siren Improvements - Leon, KS 25-PF-020 StatusAccepting Bids Bid Date 9/23/26
Drexel Technologies
Due by 9/23/2026
Harrisonville ECC Parking Lot & HMS Loop Drive Harrisonville SD Parking Lot and
Drexel Technologies
Due by 9/24/2026