Project ID: 25-0239
Title: James J. Eagan HVAC Replacement
Addenda: 0
Release Date: 2/27/2026
Due Date: 3/20/2026
General work description: The City of Florissant is seeking sealed bids from qualified HVAC contractors to provide all labor, equipment, materials, and supervision necessary to remove and replace the existing air-cooled chiller system at the James J. Eagan Community Center.
Equipment Specification
Contractor shall furnish and install one (1) air-cooled scroll chiller meeting or exceeding the following specifications:
Manufacturer: Carrier (or approved equal)
Model: 30RCM1526S055-7-2
Type: Air-Cooled Scroll Chiller
Cooling Capacity: ~142.6 Tons
Refrigerant: R-32
Dual Refrigerant Circuits
Brazed Plate Heat Exchanger (BPHE)
Microchannel Condenser Coil
Variable Condenser Fans (High-Efficiency)
BACnet IP & MS/TP Compatibility
7” Control Display with Quick Restart/Capacity Recovery
Low Sound Package with Aero-Acoustic Fans
Single Point Power
Evaporator Heater (Freeze Protection)
All equipment shall be new, factory-authorized, and AHRI-certified.
Scope of Work
The contractor shall provide turnkey installation including, but not limited to:
1. Demolition & Removal
Drain, disconnect, and remove existing chiller.
Recover refrigerant and dispose of equipment per EPA regulations.
2. Rigging & Placement
Provide crane and rigging services.
Set and secure new chiller on existing pad/structure.
3. Mechanical Installation
Modify and reconnect piping as required.
Reconnect to existing building systems.
Reuse existing shutoff valves where feasible.
Insulate piping and components as needed.
4. Electrical & Controls
Reconnect existing electrical service.
Re-land existing control wiring.
5. System Start-Up
Fill system, test for leaks, and purge air.
Provide factory startup and commissioning.
Verify full operational performance.
5. Contractor Responsibilities
Field verify all dimensions and utilities.
Coordinate work with City staff.
Maintain site safety and protection.
Provide cleanup and debris disposal.
Obtain permits if required.
Comply with all applicable codes.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Crane Lake Dam Rehabilitation Active Contract Opportunity Notice ID 12445526Q0047 Related Notice
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/11/2026
Status Bid Advertisement Post Date Revision Date Letting Date NEW SW District, City
Missouri Department of Transportation(MDOT)
Bid Due: 6/10/2026
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email
Missouri Department of Transportation(MDOT)
Bid Due: 6/17/2026
Bid Number: 053-2026IFB Bid Title: 2023PW0028 - PICKWICK & CATALPA STORMWATER IMPROVEMENTS Category:
City of Springfield
Bid Due: 6/25/2026