J--SERVER ACOUSTIC ENE, IN REPAIR/MODIFICATION OF
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| NAICS Category: |
|
| Posted Date: | Apr 28, 2026 |
| Due Date: | May 28, 2026 |
| Solicitation No: | N0010426QUB56 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Apr 28, 2026 07:46 am EDT
- Original Date Offers Due: May 28, 2026 04:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Jun 12, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 7E20 - IT and Telecom - End User: Help Desk;Tier 1-2,Workspace,Print,Output,Productivity Tools (HW/Perp SW)
-
NAICS Code:
- 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing
-
Place of Performance:
A. Electronic submission of any quotes, representations, and any necessary
certifications shall be accomplished via an email directed to
Jordan.d.burt.civ@us.navy.mil
B. General Requirements: MIL-STD Packaging, Government Source Inspection, FOB
Source, CAV Reporting.
C. This RFQ is for REPAIR. The resultant award of this solicitation will be
issued bilaterally, requiring the contractor’s written acceptance prior to
execution. Verify nomenclature, part number, and NSN prior to responding.
D. Only a firm-fixed (FFP), not-to-exceed (NTE) or estimated (EST) price for
the REPAIR of the subject item(s) will be accepted. Quotes limited to test
and evaluation (T&E) will NOT be accepted. The quoted price MUST be for the
REPAIRof the item(s).
E. Must adhere to IUID requirements of DFARS 252.211-7003
F. The ultimate awardee of the proposed contract action must be an authorized
repair source. Award of the proposed contract action will not be delayed while
an unauthorized source seeks to obtain authorization.
G. The Government is requesting a Repair Turnaround Time (RTAT) of: 177 days
after receipt of asset.
Repair Turnaround Time (RTAT) definition: The resultant contractual delivery
requirement is measured from asset Return to the date of asset acceptance
under the terms of the contract. For purposes of this section, Return is
defined as physical receipt of the F-condition asset at the contractor’s
facility as reflected in the Action Date entry in the Commercial Asset
Visibility (CAV) system. In accordance with the CAV Statement of Work, the
contractor is required to accurately report all transactions by the end of the
fifth regular business day after receipt and the Action Date entered in CAV
must be dated to reflect the actual date of physical receipt. The Contractor
must obtain final inspection and acceptance by the Government for all assets
within the RTATs established in this contract.
Please note freight is handled by Navy CAV as stated in NAVSUPWSSFA24.
Throughput Constraint: Contractor must provide a throughput Constraint for
eachNSN(s). Total assets to be repaired monthly after initial delivery
commences: _____/month (contractor is to fill in #). A throughput of "0"
(zero) per month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset
received after this date in days is not authorized for repair without
bi-lateral agreement between the Contractor and NAVSUP WSS Contracting
Officer.
H. IMPORTANT NOTE:
Reconciliation Price Reduction:
Any asset(s) for which the contractor does not meet the required RTAT will
incur a price reduction per unit/per month the contractor is late. However,
any delay determined to be excusable (e.g. Government Delay) will not result
in a price reduction. If the contractor does not meet the required RTAT due
to inexcusable contractor delay, the Contracting Officer will implement the
aforementioned price reduction via a "Reconciliation Modification" at the end
of the contract performance. Price reductions made pursuant to this section
shall not limit other remedies available to the Government for failure to meet
required RTATs, including but not limited to the Government’s right to
terminate for default.
In reference to the above important note, the contractor provides the
followingprice reduction amount per unit/per month the contractor does not
meet the RTAT: $___________, up to a maximum of: $__________. (vendor is to
fill in amount)
I. Your quote MUST include the following information for justification
purposes:
- Repair unit price ________________
- Total price________________
- Repair Turnaround Time (RTAT) _____________ days
- New unit price ______________
NOTE: If you are not quoting the Government’s Requested Repair Turnaround Time
(RTAT) or sooner, you must provide your company’s capacity constraints below:
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
- T&E fee/price (if asset is determined BR/BER): If an item is determined BR,
and the contractor provides documentation that costs were incurred during
evaluation and determination of BR/BER, the contracting officer will negotiate
a reduced contract price, not-to exceed (NTE) $___________associated with the
repair effort to reflect the BR status of the equipment.
- The T&E fee (if asset is determined BR/BER) was determined based on:
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
- Award to CAGE:________
- Inspection & Acceptance CAGE, if not the same as Award to CAGE: _________
- Facility/Subcontractor CAGE (where the asset should be shipped to), if not
same as Award to CAGE. __________
- Facility/Subcontractor or Packaging Facility CAGE (where the asset will be
shipped from), if not the same as Award to CAGE. ________
- Cost breakdown requested, including profit rate (if feasible).
- Quote expiration date _______________________ (MIN of 90 Days is requested).
- Delivery Vehicle (if Delivery Order requested) (if your company has a
currentBOA/IDIQ, for example)
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
- P O BOX 2020 5450 CARLISLE PIKE
- MECHANICSBURG , PA 17050-0788
- USA
- JORDAN BURT 771-229-0396
- jordan.d.burt.civ@us.navy.mil
- Apr 28, 2026 07:46 am EDTSolicitation (Original)
Related Document
| May 27, 2026 | [Solicitation (Updated)] SERVER ACOUSTIC ENE |
See Also
Follow SERVER,AUTOMATIC DA Active Contract Opportunity Notice ID N0010426QNF12 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Due by 10/13/2026
Follow 70--INTERFACE UNIT,DATA, IN REPAIR/MODIFICATION OF Active Contract Opportunity Notice ID N0038326QBA80 Related
DEPT OF DEFENSE
Due by 10/05/2026
Follow SERVER,AUTOMATIC DA Active Contract Opportunity Notice ID N0010426QYAGW Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Due by 10/08/2026
Follow ELPI ASSEMBLY Active Contract Opportunity Notice ID N0010426QYA3J Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Due by 9/17/2026