ITB No. 26-2931-2JL - Water Treatment Facility - H...
| Agency: | State Government of Virginia |
|---|---|
| State: | Virginia |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 11, 2026 |
| Due Date: | Mar 17, 2026 |
| Solicitation No: | IFB 113651-1 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Henrico County Government -County of Henrico, VA
Closing On: 3/17/26 2:00 PM
Time Left: 5 days, 19 hours
The Work consists of all work required by the Construction Documents necessary for the HVAC Improvements project at the Henrico County Department of Public Utilitiesâ Water Treatment Facility (WTF) located at 10111 Three Chopt Road, Richmond, VA; and Raw Water Pump Station (RWPS) located at 1201 South Gaskins Road, Richmond, VA, including removal and disposal of ACU-8 and associated ACC-2, ACU-9 and associated ACC-3, ACU-10 and associated ACC-5, ACU-11 and associated ACC-6, ACU-7 and associated ACC-4, ACU-6 and associated ACC-1 and all associated refrigeration piping, piping accessories and supports serving the main water plant. Work at the main water plant also includes the removal and disposal of the air-cooled chiller (CHIL-1) located outside on grade. Work also consists of the removal and disposal of ACU-1 and associated ACC-1 and all associated refrigerant piping, piping accessories, and supports at the Raw Water Pumping Station as well as the removal and disposal of the through-the-wall air conditioner (WAC-1) serving the control room in the pumping station. All refrigerant must be recovered from existing systems and disposed of in compliance with local, state and federal regulations prior to systems demolition. All systems listed above will be replaced and the DDC system serving the Water Treatment Facility, Washwater/Sludge Pump Station, and the Raw Water Pump Station will be replaced in its entirety along with associated control components. Plumbing work includes the provision of floor drains in the lab space to serve the existing emergency plumbing fixtures. These drains will be tied into a new neutralization basin located in the interstitial space, and tied in parallel to the existing neutralization basin. A new tepid water circulation line will be installed between the water heaters and the emergency plumbing fixtures in order to provide immediate access to tepid water at the emergency fixtures. Supporting structural and architectural work includes, but not limited to, enlarging interior door opening in CMU wall, pipe penetrations through CMU and concrete, concrete equipment pads, and supplemental steel framing and flashing at new openings in the metal roof deck. The Work shall be completed over three (3) phases. Work under each of the three phases may be completed concurrently, but priority shall be given to Phase 1, followed by Phase 2, then Phase 3. Accordingly, substantial completion times have been applied to each of the work completion phases. TAB work for each item of equipment shall be included in the phase where that equipment is installed.
IFB Construction
View Opportunity
Add to FavoritesSee Also
Landfill Collection Facility Status: Open IFB 127676 Franklin County -2020 Sontag Rd, Franklin
State Government of Virginia
Due by 10/16/2026
IFB 2027-04-P&R-Abrams Creek Trail and Trailhead P... Status: Open IFB 126700-2 Frederick County
State Government of Virginia
Due by 10/01/2026
Solids Processing Improvements - Phase 1 Department: Finance, Utilities Category: IFB, RFP -
Town of Leesburg
Due by 9/29/2026
UOSA IFB 27-02 P2NR+ Construction Status: Open IFB 127048 Upper Occoquan Service Authority
State Government of Virginia
Due by 10/22/2026